Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Weighbridge range

Choose the right platform.

Four platform families, one load-cell system (analog or digital), indicator and software. All 10–100 MT, Class III OIML R76. Tell us about your site and we point you to the right one.

Quick answer

Symphony makes four weighbridge types for 10–100 MT: pit-less (above ground with ramps), pit-type (flush with the ground), concrete/RCC (rust-proof deck) and modular (bolt-together, installs within hours). Choose pit-less for most sites, pit-type for tight plots, RCC for coastal or chemical sites and modular for temporary sites.

Site-fit finder

Four taps. The right platform.

Answer for your site and we recommend the platform, with a real installation photo of that type.

01Ground at the site
02Room for ramps at both ends?
03Will it move to another site?
04Salt, sea or chemical air?

Answer the four questions; the recommendation appears here.

Comparison

Four platforms, side by side.

Pit-lessPit-typeConcrete / RCCModular / portable
Capacity10 – 100 MT10 – 100 MT10 – 100 MT (120 MT delivered)10 – 100 MT
Length (India)7 – 18 m7 – 18 m7 – 18 m6 – 18 m
Length (Africa / export)24 m or longer24 m or longer24 m or longer24 m or longer
DeckSteel; RCC optionalSteel or RCCFully RCC or semi-concreteSteel modular
FoundationPedestals, no pitDrained pitPit or pit-lessRCC or steel base frame
RampsYesNonePit-less: yesBuilt-in
InstallFast, minimal civilNeeds excavationPour and cureWithin hours
Best forMost industrial sitesTight plotsCoastal, chemical, permanentTemporary sites

All platforms: analog or digital load cells, junction box, LED/LCD indicator with printer, Class III · OIML R76. Final sizes and capacities are confirmed in your quotation.

Civil foundation

The foundation decides the accuracy.

We issue a foundation drawing for every platform size, for both pit-type and pit-less weighbridges, with rebar details and a material list for your contractor. We can also coordinate the full civil work as an all-in-one package.

Pit-less foundation: load-cell pedestals
Pit-less foundation: load-cell pedestals
Pit-type foundation
Pit-type foundation
Pedestal reinforcement cage
Pedestal reinforcement cage
  • Foundation drawingsPit and pit-less designs for every size from 7.5 to 18 m.
  • Material listRebar and concrete quantities listed on the drawing for your contractor.
  • Pedestal levelsLoad-cell anchor positions and heights.
  • Site supportFoundation inspection visit on request.

Download sample drawings

Client scope
ExcavationAs per our drawing
ConcreteM-30 to M-40 as specified
RebarTMT as per drawing
Earth pitsEarthing and cable ducting
Weigh cabin230 V supply, 2–5 m from platform

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com