Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Maliya · Gujarat

Maliya weighbridges for salt works and Navlakhi coal.

Maliya (Miyana) is a taluka town of Morbi district on the edge of the Little Rann of Kutch and the creeks of the Gulf of Kutch. Salt works stretch across the flat, saline land, Navlakhi port in the taluka handles coal and other bulk cargo, and the national highway carries a steady stream of trucks between Kutch and Saurashtra. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा) across Maliya taluka, including Navlakhi.

Quick answer

A coal or bulk yard serving Navlakhi port usually needs an 80–100 MT, 18 m concrete (RCC) weighbridge (dharam kanta) for heavy tippers and trailers; a salt works 60–80 MT on 16 m in concrete (RCC), set on raised ground with a foundation built for saline soil; a highway transport yard 60–80 MT on 18 m. Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a cleared order with PO.

Why Symphony in Maliya

Saline ground and flood water decide where the weighbridge stands.

  • Above the flood lineRaised ground and drainage all round, so monsoon water never reaches the load cells.
  • A foundation for saline groundDense, well-cured concrete with good cover to the steel, designed after a soil and water check.
  • Sized for Navlakhi coal80–100 MT on 18 m for heavy tippers and multi-axle trailers from the port.

Who needs one in Maliya: Salt works and salt traders on the edge of the Little Rann and the Gulf of Kutch creeks; Navlakhi port and the coal and bulk-cargo yards that serve it; transporters and highway yards on the Kutch–Saurashtra route; and the farms of Maliya taluka.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Miyana, Navlakhi.

Get a quotation

Who we build for in Maliya

Salt works, coal yards, highway yards across Maliya taluka.

Salt works

Most trucks leave in the dry harvest months, and wet salt drips brine on the platform.

Our setup: A 60–80 MT, 16 m concrete (RCC) weighbridge on raised ground, serviced before the salt season.

Coal and bulk yards

Heavy tippers from Navlakhi carry wet fines that change their empty weight.

Our setup: An 80–100 MT, 18 m concrete (RCC) weighbridge with a fresh tare on every trip.

Highway transport yards

Trucks between Kutch and Saurashtra are checked before a long trip.

Our setup: A 60–80 MT, 18 m pit-less weighbridge on raised pedestals.

Industrial areas we serve near Maliya
  • Salt works of Maliya talukasea salt
  • Navlakhi portcoal and dry bulk cargo
Advice for Maliya sites

Raise it, seal it, keep it verified: a weighbridge for salt country.

At Maliya the ground itself is the challenge. The land is flat, low and saline, the water table is high and salty, and parts of it flood in the monsoon, so a weighbridge must stand on raised ground above the local flood level, with drainage all round. Salt in the soil and groundwater attacks concrete and reinforcement, so the foundation needs dense, well-compacted and properly cured concrete, with the concrete mix and cover to the reinforcement as per IS 456 for the site's exposure condition, designed after a soil and water check. Above ground, wet salt and brine drip from salt trucks, and sea air carries salt all year: a concrete (RCC) platform, with a 25-year structural warranty on the RCC (T&C), resists that better than painted steel, and IP67/IP68 load cells with a sealed junction box keep the readings steady. Salt is harvested in the dry months, and most of a works' trucks leave in that season, so have the weighbridge serviced before the season begins, and check that its Legal Metrology verification stays valid through the season. Coal tippers from Navlakhi are heavy and carry wet fines that change their empty weight, so take a fresh tare on every trip. SMFW prints the vehicle number, party, gross, tare and net on each slip and keeps daily totals by party. Symphony gives stamping support for Legal Metrology verification.

Recommended forVehiclesCapacityWeighbridgeType
Coal or bulk yard serving Navlakhi portTippers and multi-axle trailers80–100 MT18 mConcrete (RCC)
Salt worksSalt tippers and trucks60–80 MT16 mConcrete (RCC) or steel-cum-RCC
Salt trader or refineryBagged and loose salt on trucks40–60 MT16 mConcrete (RCC) or steel-cum-RCC
Highway transport yardMulti-axle trucks and trailers60–80 MT18 mPit-less steel on raised pedestals

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Maliya

Soil and water check to stamping support: a Maliya weighbridge before the harvest.

Six steps for your project in Maliya. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in MaliyaTell us the heaviest vehicle you weigh (here, typically tippers and multi-axle trailers), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (coal or bulk yard serving Navlakhi port): 80–100 MT, 18 m weighbridge, Concrete (RCC). The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Maliya salt and coal traders ask us.

Who supplies weighbridges in Maliya?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges across Maliya (Miyana) taluka, including Navlakhi, for salt works, coal and bulk yards and transporters, with Legal Metrology stamping support.
Which weighbridge suits a coal yard serving Navlakhi port?
An 80–100 MT, 18 m concrete (RCC) weighbridge takes heavy tippers and multi-axle trailers in one weighing and stands up to salt air. Use IP67/IP68 load cells with a sealed junction box, and rinse the platform gaps with fresh water after busy days.
How do you protect a weighbridge foundation on saline ground at Maliya?
Build on raised ground above the local flood level, drain the area all round, and use dense, well-compacted and properly cured concrete, with the mix and cover to the reinforcement as per IS 456 for the exposure condition, designed after a soil and groundwater check. Keep the gaps around the platform clear of salt and mud.
मालिया की खारी भूमि पर धर्म कांटे की नींव कैसे सुरक्षित रखें?
धर्म कांटा स्थानीय बाढ़ स्तर से ऊँची भूमि पर स्थापित करें और चारों ओर जल निकासी की व्यवस्था रखें। नींव में घना, भली-भाँति संघनित और उचित रूप से क्योर किया गया कंक्रीट तथा सरिये पर पर्याप्त आवरण होना चाहिए, जिसका डिज़ाइन मिट्टी और भूजल की जाँच के बाद तय हो। व्यापारिक उपयोग से पहले लीगल मेट्रोलॉजी सत्यापन आवश्यक है; सिम्फनी स्टैम्पिंग सपोर्ट देता है।
What decides the cost of a weighbridge in Maliya?
Capacity (60–80 MT for a salt works, 80–100 MT for coal and bulk yards), length (16 m or 18 m), the weighbridge type (concrete (RCC), steel-cum-RCC or pit-less steel), the raised ground and foundation that saline, flood-prone land calls for, the software and any unmanned option such as RFID, cameras and a boom barrier. Send your heaviest vehicle and photos of the plot; an engineer replies within one working day.
मालिया में नमक उत्पादन के मौसम से पहले धर्म कांटे की कौन सी तैयारी करें?
नमक उत्पादन का मौसम शुरू होने से पहले धर्म कांटे की सर्विस करवाएं और सुनिश्चित करें कि लीगल मेट्रोलॉजी सत्यापन वैध है; प्लेटफ़ॉर्म के आसपास के गैप से नमक और कीचड़ साफ़ करें और जंक्शन बॉक्स की सीलिंग जाँचें। सिम्फनी 1998 से धर्म कांटे बनाता है और लीगल मेट्रोलॉजी स्टैम्पिंग सपोर्ट देता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com