Sirohi weighbridges for granite, quarries and the mandi.
Sirohi is the headquarters of a south-western Rajasthan district, set among the Aravalli hills, and its economy is built on stone: granite and marble cutting units in the RIICO Arbuda Industrial Area, quarries that supply blocks and building stone, and the trucks that carry them. The town is also a farm market, trading wheat, mustard and other rabi crops. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Sirohi district, including Kalandri, Jawal and Posaliya.
A Sirohi granite unit that buys blocks needs an 80–100 MT, 16–18 m weighbridge with load-cell headroom for block trailers; a quarry or block supplier whose loading point moves can use a 60–80 MT modular weighbridge that needs no foundation; a mandi trader a stamped 40–60 MT, 12–16 m pit-less weighbridge (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.
From quarry to cutting unit, one stamped weight.
- Weight that matches the transit passStamped weighing with SMFW slips, so the quarry figure, the e-rawanna and the cutting unit's figure agree.
- Built for stone dustPit-less weighbridges with open access to the load cells and sealed IP67/IP68 load cells for quarry and cutting-yard dust.
- Ready for 100 MT block trailers80–100 MT weighbridges for loaded block trailers; we have delivered up to 120 MT and supplied three 100 MT steel-cum-RCC weighbridges to Sambhar Salts.
Who needs one in Sirohi: Granite and marble cutting and polishing units in the RIICO Arbuda Industrial Area; stone quarries, block suppliers and building-stone traders; Sirohi's grain market, trading wheat, mustard and other rabi crops; stone crushers and building contractors; and the transporters who move blocks, slabs and grain out of the district.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Kalandri, Jawal, Posaliya.
Stone units, quarries and mandi traders across Sirohi district.
Granite and marble cutting units
Blocks are bought by weight from the quarry and the figure decides the price of every block.
Our setup: An 80–100 MT, 16–18 m steel-cum-RCC or concrete (RCC) weighbridge with load-cell headroom for block trailers and a closed indicator cabin against slurry.
Quarries and block suppliers
The weight must match the quantity on the mineral transit pass (e-rawanna), and the loading face moves over the years.
Our setup: A 60–80 MT, 16 m modular weighbridge that needs no foundation, installs within hours on a hard, level surface such as concrete, and moves with the face.
Mandi traders and commission agents
Wheat and mustard arrive on tractor-trolleys at harvest, and farmer, agent and buyer settle on one slip.
Our setup: A stamped 40–60 MT, 12–16 m pit-less weighbridge with SMFW slips showing gross, tare and net.
- RIICO Arbuda Industrial Area, Sirohigranite and marble cutting and polishing
- Sirohi grain marketwheat, mustard and other farm produce
- Quarry belt of Sirohi districtstone blocks, building stone and crusher material
Stone dust, rocky ground and block trailers: a weighbridge for Sirohi.
In Sirohi the weight of a stone load is checked twice: at the quarry, where the quantity goes on the mineral transit pass (e-rawanna), and at the cutting unit, where the block is paid for. When the two figures differ, the argument is about which weighbridge to trust, so both ends need a stamped weighbridge and a printed slip with the vehicle number, date and time. Quarry sites have their own problems. Stone chips and dust ride in on the tyres and settle in the gap around the platform, so choose a pit-less weighbridge with open access to the load cells, sealed IP67/IP68 load cells, and a daily habit of sweeping the gap. Rocky ground makes a firm footing but is slow and costly to excavate, which is one more reason to prefer a pit-less weighbridge to a pit here. Keep the weighbridge clear of the blasting zone and run the cables in conduit so flying chips cannot cut them. A quarry that moves its loading face every few seasons can use a modular weighbridge: no foundation required, it installs within hours on a hard, level surface such as concrete, and moves with the face; after each move it is re-levelled, recalibrated and re-verified before trade use.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Granite / marble cutting unit | Block trailers, slab racks | 80–100 MT | 16–18 m | Steel-cum-RCC |
| Quarry / block supplier | Tippers, block trailers | 60–80 MT | 16 m | Modular steel, no foundation required |
| Mandi trader / commission agent | Tractor-trolleys, trucks | 40–60 MT | 12–16 m | Pit-less steel, stamped for trade |
| Stone crusher / building contractor | Tippers, transit mixers | 60 MT | 16 m | Concrete (RCC), 25-year structural warranty (T&C) |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From the quarry road to the first slip: a Sirohi weighbridge in six steps.
Six steps for your project in Sirohi. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in SirohiTell us the heaviest vehicle you weigh (here, typically block trailers, slab racks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (granite / marble cutting unit): 80–100 MT, 16–18 m weighbridge, Steel-cum-RCC. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Sirohi's stone units, quarries and traders.
Who supplies weighbridges in Sirohi?
Which weighbridge suits a granite unit in RIICO Arbuda?
Can a quarry use a weighbridge without a foundation?
Is the weighbridge stamped for trade in Sirohi?
What decides the cost of a weighbridge in Sirohi?
सिरोही में ग्रेनाइट इकाई के लिए कौन सा धर्म कांटा उपयुक्त है?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.