Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Rajsamand · Rajasthan

Rajsamand weighbridges for marble blocks, ore and factory gates.

Rajsamand, the twin town of Kankroli and Rajnagar on the banks of Rajsamand lake, is the headquarters of one of Rajasthan's main marble districts. Quarries across the district cut white and coloured marble, and processing units in and around the town saw the blocks into slabs and tiles. A large tyre plant works at Kankroli, zinc-lead ore is mined at Rajpura–Dariba in Railmagra tehsil, and the town's traders buy grain and farm produce from the surrounding villages. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Rajsamand district.

Quick answer

A Rajsamand marble processing unit usually needs a 60–100 MT, 16–18 m weighbridge built for heavy single-block loads, so a crane-loaded block trailer is weighed in one go; a mining or ore transport contractor 80–100 MT on 18 m; a factory gate 40–60 MT with SMFW records and an unmanned option; a grain trader a stamped 40 MT, 12 m weighbridge (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.

Why Symphony in Rajsamand

Built for the heaviest block, not just the total load.

  • Sized for heavy blocksGirders and load cells chosen for a 20-tonne-plus block sitting on a few axles.
  • Kept clean of slurryRaised platform, side drains and IP67/IP68 load cells for wet, dusty marble yards.
  • Records for every trailerSMFW prints vehicle, party, material, gross, tare and net for each block and slab truck.

Who needs one in Rajsamand: Marble quarries, block traders, gang-saw and cutter units, slab and tile dispatch; a tyre plant at Kankroli and its suppliers; zinc-lead mining at Rajpura–Dariba and the transport contractors serving it; grain and farm-produce traders; builders, RMC suppliers and building-material dealers.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Amet, Deogarh, Bhim, Kumbhalgarh, Railmagra.

Get a quotation

Who we build for in Rajsamand

Marble units, miners and manufacturers across Rajsamand district.

Marble block yards

Blocks are bought and sold by weight, and one block can be most of a trailer's load, sitting on a few axles.

Our setup: A 60–100 MT, 16–18 m pit-less steel weighbridge with girders and load cells sized for the heaviest block, and crane work kept off the platform.

Ore and mining transport

Tippers run in shifts, and every trip is counted against the contract.

Our setup: An 80–100 MT, 18 m heavy-duty weighbridge with SMFW trip reports and the unmanned option (RFID, cameras, boom barrier).

Factory gates at Kankroli

Suppliers' trucks bring rubber, carbon black and chemicals in, and tyres go out in light, bulky loads.

Our setup: A 40–60 MT, 16 m weighbridge with SMFW gate records; length matters more than capacity for outbound tyre trucks.

Industrial areas we serve near Rajsamand
  • RIICO industrial areas around Rajsamandmarble processing and small manufacturing units
  • Kankrolityre manufacturing and its suppliers
  • Rajpura–Dariba (Railmagra tehsil)zinc-lead mining and ore transport
Advice for Rajsamand sites

Concentrated loads, slurry and rock: planning a Rajsamand weighbridge.

Marble is a hard load for a weighbridge. A single block can weigh 20 tonnes or more and sits on a small area of the trailer bed, so the weight reaches the platform through a few axles instead of being spread along the whole truck. Tell us the heaviest block you handle: we size the main girders and the load cells for that concentrated load, not just for the total capacity, and ask for the rated axle (concentrated) load in the quotation. Take 80–100 MT if you weigh loaded quarry block trailers. Load and unload blocks with the crane away from the platform, never on it; a block dropped on the weighbridge can bend a cross member or shock a load cell. Marble dust and slurry water spread across every unit yard, so keep the weighbridge on raised ground with a clear drain on both sides, use IP67/IP68 load cells with a sealed junction box, and wash the platform edges and the gaps between modules every week. Much of Rajsamand stands on hard rock; a pit-less steel weighbridge on pedestals needs little digging, while a concrete (RCC) weighbridge suits a unit that wants a top that does not rust under wet slurry.

Recommended forVehiclesCapacityWeighbridgeType
Marble processing unit, block yardCrane-loaded block trailers60–100 MT16–18 mPit-less steel, girders sized for concentrated block loads
Ore or mining transport contractorTippers, multi-axle trucks80–100 MT18 mPit-less steel or concrete (RCC), heavy duty
Factory gate (tyre plant suppliers, manufacturing)Container trucks, trailers40–60 MT16 mPit-type or pit-less, SMFW, unmanned option
Grain and farm-produce traderTractor-trolleys, 6- and 10-wheel trucks40 MT12 mPit-type or pit-less, stamped for trade

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Rajsamand

From the block yard to the first stamped slip: a Rajsamand weighbridge in six steps.

Six steps for your project in Rajsamand. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in RajsamandTell us the heaviest vehicle you weigh (here, typically crane-loaded block trailers), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (marble processing unit, block yard): 60–100 MT, 16–18 m weighbridge, Pit-less steel, girders sized for concentrated block loads. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Questions from Rajsamand's marble units, transporters and traders.

Who supplies weighbridges in Rajsamand?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges across Rajsamand district, including Amet, Deogarh, Bhim, Kumbhalgarh and Railmagra, with Legal Metrology stamping support.
Which weighbridge suits a marble unit in Rajsamand?
A 60–100 MT, 16–18 m pit-less steel weighbridge with girders and load cells sized for your heaviest single block (80–100 MT for loaded quarry trailers). Keep crane work off the platform, and give the weighbridge side drains so slurry water runs away. Send us the heaviest block and the longest trailer; we confirm the design.
Which truck scale suits ore and mining transport in Rajsamand district?
An 80–100 MT, 18 m heavy-duty weighbridge, in pit-less steel or concrete (RCC). Concrete (RCC) carries a 25-year structural warranty (T&C); every Symphony weighbridge is Class III to OIML R76 with Legal Metrology model approval.
राजसमंद में मार्बल यूनिट के लिए कौन सा धर्म कांटा उपयुक्त है?
भारी मार्बल ब्लॉक वाले ट्रेलरों के लिए 60–100 टन क्षमता और 16–18 मीटर लंबाई का पिट-लेस स्टील धर्म कांटा उपयुक्त है, जिसके गर्डर और लोड सेल सबसे भारी ब्लॉक के अनुसार चुने जाते हैं। ब्लॉक की लोडिंग और अनलोडिंग क्रेन द्वारा कांटे के प्लेटफ़ॉर्म से अलग स्थान पर ही करें।
What decides the cost of a weighbridge in Rajsamand?
Capacity (40 MT for a trader, 60–100 MT for a marble unit, 80–100 MT for ore transport), length (12–18 m), the type (pit-less steel, pit-type or concrete (RCC)), how the girders are sized for heavy single blocks, the digging needed in rocky ground, and the software and options such as the unmanned system. Send your heaviest block or vehicle, the daily truck count and photos of the yard; an engineer replies within one working day.
राजसमंद में मार्बल ब्लॉक का सही वजन करने के लिए क्या ध्यान रखें?
ब्लॉक का भार कुछ ही एक्सल पर आता है, इसलिए धर्म कांटे के गर्डर और लोड सेल सबसे भारी ब्लॉक के अनुसार चुनें, और क्रेन से ब्लॉक कांटे पर कभी न उतारें। सिम्फनी 1998 से धर्म कांटे बनाता है और स्टैम्पिंग सपोर्ट देता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com