
Morbi weighbridges for the ceramic cluster.
Morbi is India's best-known ceramic tile cluster, and a ceramic plant moves huge tonnages: clay and feldspar in, packed tiles out. Symphony supplies weighbridges and service across Morbi, Wankaner and Halvad, built for dusty yards and long tile trailers.
For a Morbi ceramic plant, a 60–80 MT pit-less weighbridge with an 18 m deck handles loaded clay tippers and long tile trailers; dust-sealed IP67/IP68 load cells suit the dusty yards. Symphony builds it in Ahmedabad.
Ceramic country, where every tonne is counted.
- Installed across the clusterBuilt and tested in Ahmedabad, then installed in Morbi, Wankaner, Halvad and along the Lakhdhirpur Road belt.
- Built for dustSealed IP67/IP68 load cells and a deck that is easy to clean around.
- Two-bridge layoutsOne weighbridge for raw material in, one for dispatch out, so the queues never mix.
Who needs one in Morbi: Ceramic tile and sanitaryware plants, clay and raw-material suppliers, packaging and paper mills, the clock and electrical-goods industry, and logistics along the Morbi–Wankaner and Morbi–Halvad roads.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Wankaner, Halvad, Tankara, Lakhdhirpur Road.
Clay in, tiles out.
Ceramic tile plants – raw material
Clay, feldspar and quartz tippers all day, in heavy dust.
Our setup: A 60–80 MT, 16 m pit-less deck with sealed load cells.
Ceramic tile plants – dispatch
Packed tiles leave on long trailers to tight schedules.
Our setup: An 18 m deck of 60 MT with SMFW records matched to invoices.
Paper and packaging mills
Waste paper in, boxes and rolls out.
Our setup: A 60 MT, 16–18 m pit-less deck with slip printing.
- Morbi ceramic cluster (Lakhdhirpur Road and around)ceramic tiles and sanitaryware
- Morbi–Wankaner roadceramics, paper and packaging
- Morbi–Halvad roadceramics and raw-material processing
- Wankanerceramics and paper mills
Two weighbridges, two clean queues.
A ceramic plant runs on raw material: clay, feldspar and quartz arrive in tippers all day, and packed tiles leave on long trailers. Clay dust gets everywhere, so sealed IP67/IP68 load cells and a clean foundation drain matter. Many plants run two weighbridges, one for raw material in and one for dispatch, so the queues never mix.
| Recommended for | Vehicles | Capacity | Deck | Type |
|---|---|---|---|---|
| Ceramic plant – raw material | Clay and feldspar tippers | 60–80 MT | 16 m | Pit-less steel |
| Ceramic plant – dispatch | Long trailers, multi-axle trucks | 60 MT | 18 m | Pit-less steel |
| Paper / packaging mill | Multi-axle trucks | 60 MT | 16–18 m | Pit-less steel |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From kiln plan to two-bridge layout.
Six steps for your project in Morbi. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in MorbiTell us the heaviest vehicle you weigh (here, typically clay and feldspar tippers), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (ceramic plant – raw material): 60–80 MT, 16 m deck, Pit-less steel. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the deck arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationDeck placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Morbi ceramic plant questions.
Who supplies weighbridges in Morbi?
Which weighbridge suits a ceramic tile plant?
Should a ceramic plant have two weighbridges?
How long does delivery to Morbi take?
How much does a weighbridge cost in Morbi?
मोरबी में सिरेमिक प्लांट के लिए धर्म कांटा कैसा हो?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
