
Narigam GIDC weighbridges for plastic processors, recyclers and carriers.
Narigam is the GIDC site in Bhavnagar district where the Centre approved a plastic park, planned on 115 hectares, and where GIDC's recent allotment notices list plots for industrial, non-chemical and MSME units. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) to the polymer processors, moulders, recyclers, packaging makers and carriers who may work from a site planned as a plastic park. Plastic is light for its bulk, so a trailer that looks full may weigh far below the limit, while granule and scrap lots are bought by the tonne and checked against the invoice. A weighbridge that records each lot honestly protects the buyer who pays for polymer and the recycler who sells regrind. Because the site was planned as a plastic park, a weighbridge there is likely to answer a narrow set of questions: which grade came in, from which seller, what the net weight was and what went out as finished stock. A slip that settles those at the gate shortens every later conversation with an auditor or a buyer. The park was conceived to bring processors, suppliers and support services into one place, which could mean a single gate sees granule trailers, scrap pick-ups, packaging vans and a contractor's tipper on the same morning.
For a plastics unit at Narigam we recommend a 50–60 MT weighbridge over 14–16 m as the working size, because polymer and packaging loads fill a trailer long before they reach its weight limit. A recycler or a granule distributor taking long bulk trailers can choose 60–80 MT over 18 m. An early-stage plot can begin with a modular platform that needs no foundation. Once a PO is commercially cleared we dispatch in about 2 weeks, and our team supports Legal Metrology stamping.
Light, bulky loads: one honest figure per lot.
- Honest on light, bulky loadsA stable-mark print and a checked scale division suit lots where the net figure is modest.
- Many sellers, one registerSMFW keeps party, material and grade on every line so recycler and buyer see the same slip.
- Dust-ready from day oneSealed IP68/IP69K cells and a closed junction box suit yards that collect fine plastic dust.
- Room to growCable conduit with a spare pipe and space for a second lane make later additions a short job.
Who needs one in Narigam GIDC: Weighbridges suit industrial and MSME plastic processors and moulders, granule and masterbatch dealers, recyclers, packaging makers, engineering suppliers and carriers.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Bhavnagar.
Processors, recyclers and packers: what each needs.
Polymer processors and moulders
Granules arrive by the tonne and finished goods leave by the crate, so both ends of the process need an honest figure.
Our setup: Suggested: 50–60 MT with separate inbound and outbound registers and the verified scale division checked against your smallest lot.
Recyclers and scrap buyers
Dozens of small sellers bring loose and baled plastic, and each expects a slip on the spot. Sellers who bring only a few bags are better served by a separate bench or platform scale; we supply small scales too.
Our setup: Suggested: 50 MT, party-wise slips, stored tares and a daily summary by grade.
Packaging and film makers
Tall, light trailers fill the platform length before they reach the weight limit.
Our setup: Suggested: 60 MT over 16 m with a repeater display and a clear straight approach.
- Narigam GIDC plotsindustrial estate, Bhavnagar district
- Bhavnagardistrict headquarters
Dust, small net weights and many sellers: siting a weighbridge at Narigam.
A plastics-focused site puts different demands on the platform from a metal or mineral yard. Loads are bulky but often light, and they arrive as bagged granules, drums, baled film, crushed regrind or finished crates, so the weighing is as much about accuracy on a small net figure as about strength. Choose the capacity from the biggest truck, then check the verified scale division against your smallest lot: a net of a few hundred kg on a 60 MT weighbridge carries rounding, so very small lots belong on a smaller scale. Bagged and baled loads are tall and wide, so keep the approach straight, clear of poles and fences, and mark the stop line so the whole trailer rests on the platform. Recyclers often buy scrap from many small parties, which is where a party-wise register and stored tares pay for themselves: each arriving pick-up or tractor is weighed in and out, and the slip names the seller and the grade. Dust and fine plastic fragments blow across a yard, so use a closed junction box, sealed IP68/IP69K cells and cable in conduit, and keep a broom and a hose within reach of the clerk. Plan the cabin so the clerk sees the gate, the platform and the exit, and add a repeater display facing the cab. SMFW can keep separate registers for inbound polymer, scrap and outbound goods, hold the tare of each regular truck and print a daily summary by material. Because plastic units often run a second shift, an RFID tag with a camera snapshot at a boom barrier keeps the night gate controlled. Feed the indicator through a UPS with earthing and a surge arrestor, as heavy motor starts in a moulding hall can dip the supply. Send a plot photo showing the gate and the longest truck's path, and an engineer will reply with platform, ramp and cabin positions. Two habits help here. Weigh every truck both in and out, and agree with sellers and carriers that the printed slip alone settles the payment and the freight. Think too about how a plastics yard grows. A unit that starts with one moulding line often adds a recycling corner, then a godown for granule bags, then a second gate, and each addition changes the traffic. Place the platform where a future second lane can be added beside it without moving the cabin, and run the cable conduit with a spare pipe so the extra indicator or repeater is a day's job rather than a dig. Keep the approach long enough for a trailer to straighten before it rolls on, because a trailer weighed while turning can read short. Plastic scrap also carries moisture and dirt, so agree with sellers whether a deduction applies and note the agreed deduction in the register and on the slip remarks; a visible deduction is accepted far more easily than a silent one. At month end, export the register and match it with the purchase and sales books, which turns the weighbridge into a daily check rather than a yearly argument. Treat the first month as a learning period. Record how long each type of vehicle spends on the platform, which hours see the queue and which sellers argue most about deductions; with that data in hand, a small change such as a second lane, a tag reader or a printed price board often removes the pain at almost no cost. Keep the empty-weight register honest by re-weighing each regular truck empty at the start of every week, since a body that has gathered dust, bagging or a new tool box will change its tare. The printed record is more than a gate formality: a lender, an insurer or a customer's quality team may ask for it months later, and an indexed register answers them in minutes.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Polymer processing or moulding unit | Granules in, finished crates out | 50–60 MT | 14–16 m | Pit-less steel, sealed cells, stable-mark print, two registers |
| Recycler or scrap buyer | Many small parties, loose and baled loads | 50 MT | 14 m | Pit-less steel, stored tares, party-wise slips |
| Granule or masterbatch distributor | Long trailers of bags and drums | 60–80 MT | 16–18 m | Steel-cum-RCC, wide straight approach |
| Packaging and film maker | Tall, light, bulky trailers | 60 MT | 16 m | Pit-less steel, repeater display facing the cab |
| Carrier or transport depot | Mixed loaded and empty trucks | 60 MT | 16 m | Heavy-duty girders, printed slip for each trip |
| New plot, early stage | Open ground, no foundation yet | 40–50 MT | 12 m | Modular platform on a hard, level surface |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From a plot photo to the first slip: a Narigam weighbridge in six steps.
Six steps for your project in Narigam GIDC. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in Narigam GIDCTell us the heaviest vehicle you weigh (here, typically granules in, finished crates out), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (polymer processing or moulding unit): 50–60 MT, 14–16 m weighbridge, Pit-less steel, sealed cells, stable-mark print, two registers. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
What Narigam plot owners and plastics units ask before they order.
Who supplies weighbridges at Narigam GIDC?
What capacity suits a plastics unit?
How should scrap and regrind be weighed?
How do we weigh a trailer that is full but light?
Can one register hold polymer, scrap and finished goods?
What should we prepare before the engineer visits?
Does plastic dust harm a weighbridge?
Can a new unit start with a modular weighbridge?
What records are kept for audits?
When can slips be used for trade?
What decides the cost of a weighbridge at Narigam GIDC?
नरिगाम जीआईडीसी की प्लास्टिक इकाई के लिए वेब्रिज कैसे चुनें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
