
PCC GIDC weighbridges for chemical, packing and fabrication yards.
PCC GIDC takes its name from the Petrochemical Complex area of Vadodara district, and the chemical, packing and fabrication units that may operate here typically weigh sacks, drums and tankers. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) to supplier yards, packing and drum units, fabrication shops, logistics operators and scrap dealers that may work in this estate. Trade at such units may run on sacks, drums and tanker compartments, and the paperwork that follows them: a supplier invoices by net weight, a buyer's gate checks the same figure, and a few hundred kilograms of difference becomes a debit note. A dependable platform, a printed slip carrying vehicle number, both weights, net and timestamp, and a register that can be pulled up weeks later turn that argument into a thirty-second check. Because gates serve both inbound raw material and outbound packed goods, the weighbridge is usually the busiest single point in a unit, and it should be planned like one.
For PCC GIDC supplier and packing yards we suggest a 60 MT weighbridge over 16 m as the working choice, so a loaded 10-wheeler or a trailer with a short wheelbase sits fully on the platform. A unit that receives long bulk trailers should step up to 80 MT over 18 m. A small drum or carboy unit that needs a weighbridge only for dispatch can use a modular platform on a levelled slab, with no foundation work. Choose sealed IP68/IP69K load cells and a closed junction box wherever chemical splash or wash-down water reaches the platform. Dispatch is about 2 weeks from a commercially cleared PO.
Sacks, drums and tankers: one slip that both gates accept.
- Made for splash and wash-downA coated platform, a washable gap and sealed cells suit splash-prone yards.
- One register for every gateInbound raw material and outbound packed goods sit in one SMFW record.
- Right size, not oversizeA 60 MT, 16 m platform suits most supplier trucks; bulk carriers get 80 MT.
Who needs one in PCC GIDC: Weighbridges suit chemical and packing suppliers, drum-handling units, fabricators, logistics yards, contractors and scrap dealers.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Vadodara.
Suppliers, drum-handling units and fabricators: who we build for.
Raw material and packed-goods suppliers
Bags, drums and carboys may be invoiced by net weight, so a small error can turn into a debit note.
Our setup: Suggested: 60 MT on a 16 m pit-less platform, a straight run-in and a slip printed before the truck leaves.
Drum-handling units
Small trucks may come in bursts at shift change.
Our setup: Suggested: 40 MT on 12 m over a concrete apron, with stored tare for the regular vans.
Fabrication and shutdown contractors
Pipe spools, plate and structure move as heavy, uneven loads.
Our setup: Suggested: 60 MT heavy-duty steel with load plates, or a modular platform for a short job.
- PCC GIDC plotsindustrial estate, Vadodara district
- Vadodaradistrict headquarters
Splash, surge and tight plots: siting a weighbridge at PCC GIDC.
Think first about what rides on the platform. A tanker carrying a liquid surges when it brakes, so the lane should let the driver roll on, stop on a level run and wait a few seconds before the reading is taken. A trailer of bagged polymer or packed drums behaves differently: it is tall, so the approach must be straight and wide enough that mirrors clear the cabin and the fence. Many plots in an estate are rectangular and tight; where the entry gate opens straight onto the road, keep a waiting strip inside the fence long enough for one loaded trailer, so the public lane stays free. Wash-down water and residue are possible in a yard like this. Ask for sealed IP68/IP69K cells with a closed junction box so that water and residue do not reach the electronics. Drains should lead away from the cells, and the concrete on both sides must be level to a soil-tested foundation, because a platform that sinks a few millimetres on one side shifts every reading. SMFW keeps vehicle, party, material and time on each line and can export the day's register for the accountant. For units that run two shifts, a tag on regular carriers lets the boom barrier lift after an RFID read and a camera snapshot, which keeps the night gate clean without a second clerk. Heavy motor starts can dip the supply, so feed the indicator through a UPS and give it proper earthing and a surge arrestor. Because debit notes in chemical supply are argued over the slip, the platform should hold a valid Legal Metrology stamp, and our team supports the stamping visit. Share a plot photo with the gate and the tallest trailer's path sketched in, and an engineer will reply with a platform, ramp and cabin layout. Put a short instruction card in the cabin so every new driver knows where to stop, when to switch off the engine and where to collect the slip. A shaded cabin, a fan and a big repeater display facing the cab help the clerk through long summer shifts. Keep a hose point and a drain trap near the platform so that residue is cleared before it reaches the gap beneath the steel.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Chemical or polymer supplier | Tall trailers with bags and drums | 60 MT | 16 m | Pit-less steel, coated top, IP68/IP69K cells |
| Bulk liquid or powder carrier | Long tankers and bulkers, weighed whole | 80 MT | 18 m | Steel-cum-RCC, sealed junction box, level run-in |
| Drum and carboy unit | Small trucks in short bursts | 40 MT | 12 m | Pit-less steel over a concrete apron, stored tares |
| Pipe and structure fabricator | Long, uneven steel loads | 60 MT | 16 m | Heavy-duty girders and load plates, party-wise register |
| Shutdown contractor laydown | Equipment and consumables for a turnaround | 50 MT | 12 m | Modular platform on hard, level ground, quick to place |
| Two-shift dispatch gate | Known carriers loading at night | 60–80 MT | 16–18 m | RFID reader, camera and boom barrier writing to SMFW |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From a plot photo to the first slip: a PCC GIDC weighbridge in six steps.
Six steps for your project in PCC GIDC. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in PCC GIDCTell us the heaviest vehicle you weigh (here, typically tall trailers with bags and drums), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (chemical or polymer supplier): 60 MT, 16 m weighbridge, Pit-less steel, coated top, IP68/IP69K cells. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
What PCC GIDC unit owners and gate managers ask before ordering.
Who supplies weighbridges at PCC GIDC?
Which capacity suits a chemical supplier's yard?
Will water and wash-down harm the weighbridge?
Is a pit needed?
Can one system serve inbound and outbound gates?
Is the slip accepted for billing?
How should tankers be weighed at PCC GIDC?
What if part of our plot is a classified hazardous area?
What decides the cost of a weighbridge at PCC GIDC?
पीसीसी जीआईडीसी में रसायन और पैकिंग इकाई के लिए वेब्रिज कैसे चुनें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
