
Shekhpat weighbridge, sized for the plot you have.
Shekhpat is listed under Jamnagar in the GIDC allotment price table for 2026-27, with a tentative rate for small and larger industrial plots. Symphony builds weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for unit owners comparing whether to install their own or share a weighing point.
If your own weighbridge is justified, a 30 to 40 MT platform of 7.5 to 9 m suits small and medium trucks on a compact plot; 60 MT on 12 to 16 m suits multi-axle deliveries where the frontage allows. Check the longest vehicle against the real turning space first. Specify IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, with stamping support.
Own, share or go outside: work it out first.
- Count the loadsMonthly weighments show whether ownership makes sense.
- Test the turnA chalk outline reveals problems no drawing shows.
- Write the sharing rulesShared equipment runs well only with agreed duties.
Who needs one in Shekhpat GIDC: GIDC's table treats plots of 3000 square metres or less as one category and larger plots as another. It names no trades. That size split is still useful: it raises a practical question for any small unit, namely whether a truck platform earns its space, and what to specify if it does.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.
Own slips, sharing, small yards: three situations.
Replacing outside slips
Trips to another weighing point cost hours.
Our setup: Suggested: compact platform with printed slip and daily totals on screen.
Sharing with a neighbour
Each firm needs its own history.
Our setup: Suggested: separate party codes, numbered slips and a monthly statement.
Guarding a small yard
One person often handles gate and accounts.
Our setup: Suggested: simple entry screen, stored vehicle numbers and a visible display.
- Shekhpatlisted under Jamnagar in GIDC's 2026-27 allotment price table, with rates marked tentative
Chalk the platform, drive the truck in.
Work out the case before the drawing. Note how many vehicles you weigh in a normal month, what each outside weighment costs, how long the trip takes and how often a bill is disputed. Add the value of goods that leave without a weight. Set that against the platform, foundation, cabin, power, annual verification and upkeep. A unit with a few loads a month may be better served by a good outside slip and a small platform scale indoors; a unit buying by the tonne every day usually has a clearer case. Where space is the limit, test layouts on the ground with chalk. Mark the platform, drive the longest truck in, and see whether it can square up without touching the boundary wall or standing out on the road. Gate position often matters more than plot area. Check margins and open-space rules with GIDC before placing any permanent structure inside them. Two neighbouring units may wish to share one weighbridge. If so, put the terms in writing: who owns it, who operates it, how slips are numbered, who pays for verification and repair, and whose licence conditions apply to charging others. Keep party names separate in the software. A pit saves frontage but can trap water on a flat plot unless it is drained, whereas an above-ground platform needs ramp length, normally at both ends for drive-through use. Ask for both layouts against your measured sketch and choose the one your trucks can actually use. Keep scrap, drums and pallets off the approach so the platform stays clear.
| Recommended for | Vehicles | Capacity | Length | Note |
|---|---|---|---|---|
| Compact plot, own trucks | Small and medium trucks | 30–40 MT | 7.5–9 m | Chalk the turn before deciding |
| Daily raw material by truck | Medium trucks | 40 MT | 9 m | Straight entry from the gate |
| Multi-axle supplies | Rigid multi-axle | 60 MT | 12–16 m | Needs wider frontage |
| Shared between two units | Mixed vehicles | 60 MT | 16 m | Written terms and separate party codes |
| Rented or phased plot | Moderate loads | 40 MT | 9 m | Modular, on a hard level concrete surface |
| Occasional loads only | Small lots | Platform scale | Indoor size | A truck platform may not pay |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
Deciding for a small plot, from count to commissioning.
Six steps for your project in Shekhpat GIDC. For foundation-based models, curing takes time, so the drawing comes first.
- 1 · Your traffic in Shekhpat GIDCTell us the heaviest vehicle you weigh (for example, small and medium trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (compact plot, own trucks): 30–40 MT, 7.5–9 m weighbridge; chalk the turn before deciding. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Space, sharing and cost sense: plot holders ask.
Is an own weighbridge worth it for a small unit?
What is the shortest platform available?
Can two firms share one weighbridge?
Can it be built inside the plot margin?
Do we need an operator?
What warranty is given?
What sets the price of a weighbridge for a Shekhpat GIDC plot?
शेखपाट जीआईडीसी की छोटी इकाई अपना वेब्रिज लगाए या बाहर तौल कराए?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
