Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Bedi port · Gujarat

Bedi port weighbridge, ready for the tide rush.

Bedi, on the Gulf of Kutch at Jamnagar, is a port where cargo moves between ships at anchorage, barges, wharves and godowns. Symphony makes weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for cargo handlers, godown keepers, importers, exporters and transport firms working with this port trade.

Quick answer

For tippers and trailers hauling bulk cargo between wharf, godown and customer, 60 to 80 MT on 16 to 18 m is a practical example; 100 MT is available where gross weights require it. Smaller godown lorries may fit 40 MT on 9 m. Confirm the figure from the heaviest loaded vehicle and its axle loads. Choose IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, with stamping support.

Why Symphony in Bedi port

Barges, godowns, trucks: one weight trail.

  • Plan for the tide rushQueue space and quick slips matter when barges set the pace.
  • Separate the cargoesClean between loads that must not mix on wheels or platform.
  • Tie slip to lotA vessel or delivery order reference makes stock checks simple.

Who needs one in Bedi port: The Gujarat Maritime Board describes Bedi as an all-weather tidal lighterage facility. Its published cargo lists include fertiliser, rock phosphate, coal, grains and crude soyabean oil coming in, and cement, clinker, bauxite, pet coke, rice and sugar going out. Dusty minerals, bagged food and liquid cargo ask very different things of one truck record.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Bedi port

Vessel lots, godown stock, haulage: three port records.

Reconciling a vessel lot

Barge tallies and truck weights must be compared.

Our setup: Suggested: lot and delivery order fields on every slip, with a closing report in SMFW software.

Stocking a covered godown

Bags may arrive damp or torn.

Our setup: Suggested: weigh in and weigh out, and note condition against the challan.

Billing hired transport

Hired transport may be billed on net tonnes.

Our setup: Suggested: 60 MT or more with both parties able to read a remote display.

Industrial areas we serve near Bedi port
  • Bedi porta Gulf of Kutch lighterage port at Jamnagar with wharves, a transit shed and covered godowns
Advice for Bedi port sites

Count the busiest tide, then draw the lane.

Port work can arrive in waves. Barge working at Bedi depends on the tide, so truck arrivals may bunch and then slacken. Size the layout for that surge: one straight entry long enough to hold a short queue, a separate way out, and an indicator and printer that an operator can run without leaving the seat. Count trips in the busiest tide, not the daily average. Cargo type decides housekeeping. Rock phosphate, coal and clinker shed dust and lumps that pack around the platform edge, while spilt oil makes surfaces slippery and fertiliser can attack unprotected steel when damp. Name the cargoes in your enquiry so that coating, gap covers and the wash routine match them, and sweep or wash between unlike loads if a consignment can be contaminated. Marine air is constant. Ask for sealed cable glands, a closed junction box, protected fixings and a written inspection schedule for rust. Creek-side or filled ground needs a bearing check by an engineer, and the finished level should stay above standing water, with a drain that actually has somewhere to fall. Keep the cabin raised, with a view of both ends. Port premises often control entry, power and civil work, so obtain the land holder's written permission and ask which approvals apply before any excavation. For records, use the vessel or lot name, the delivery order number, the transporter and gross and tare on each slip, so that godown stock can be reconciled with what left the wharf. A weighbridge used for trade needs Legal Metrology verification before use, periodically afterwards, and again after repair or relocation.

Recommended forVehiclesCapacityLengthNote
Bulk cargo trailersSemi-trailers60–80 MT18 mHold a queue without blocking the road
Mineral and coal tippersRigid multi-axle60 MT12–16 mEdges easy to clear of lumps
Bagged rice, sugar, fertiliserRigid goods trucks40–60 MT9–12 mCovered cabin and dry paperwork
Liquid cargo tankersTankers60 MT16 mSettle the load before saving
Project and heavy cargoLow-bed carriers100 MT18 mCheck axle drawing first
Rented godown yardModerate loads40 MT9 mModular, on a hard level concrete surface

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Bedi port

From cargo list to stamped weighbridge, the port-side order.

Six steps for your project in Bedi port. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in Bedi portTell us the heaviest vehicle you weigh (for example, semi-trailers), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (bulk cargo trailers): 60–80 MT, 18 m weighbridge; hold a queue without blocking the road. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Dust, tankers and queues: cargo handlers ask.

Which weighbridge suits port cargo haulage?
Take the longest vehicle and the heaviest realistic gross. Trailers usually need 18 m, while rigid tippers often work on 12 to 16 m.
How do we handle many trucks in a short window?
Give a straight entry and exit, keep vehicle numbers and stored tare rules ready, and consider the unmanned option with RFID, cameras and a boom barrier.
Does dust from mineral cargo affect readings?
Build-up around or under the platform can. Check zero each shift and clear the gaps on a fixed routine.
Can tankers be weighed on the same weighbridge?
Yes, within capacity and length. Let the liquid settle, with the vehicle fully on the platform, before the weight is saved.
How is salt exposure managed?
With suitable coating, sealed cable entries, washable layouts and early repair of damaged paint.
What warranty applies?
A 1-year warranty on the weighbridge; steel-cum-RCC construction also carries a 25-year structural warranty on the RCC concrete, terms and conditions apply.
What decides the price of a weighbridge for a Bedi port yard?
Capacity, length, soil and platform height, steel or RCC top, coating, cabin, display, software and any unmanned hardware. Send vehicle details and plot photos on WhatsApp +91 63525 86656 or call +91 94092 42100.
बेड़ी बंदर के माल के लिए वेब्रिज लगाने में किन बातों का ध्यान रखें?
सबसे भारी वाहन, ज्वार के समय होने वाली कतार, नमक और धूल से बचाव, पानी की निकासी और स्लिप पर लॉट नंबर का ध्यान रखें। एस.एम.एफ. एंटरप्राइज़ 1998 से वेब्रिज बना रही है और स्टैम्पिंग में सहायता करती है। कॉल: +91 94092 42100, व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com