Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Alibag · Maharashtra

Alibag and Raigad weighbridges for jetties, MIDC plants and rice mills.

Alibag is the headquarters of Raigad district on the Konkan coast. Raigad is one of Maharashtra's heavy-industry districts: jetties on the Dharamtar creek handle bulk cargo, a large steel plant in Pen taluka and a fertiliser complex at Thal, and the MIDC estates at Roha, Mahad and Patalganga hold chemical, pharma-intermediate and manufacturing units. Paddy fields, rice mills and a steady building trade fill the rest of the district. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Raigad district.

Quick answer

A Raigad jetty, steel or bulk-cargo contractor usually needs an 80–100 MT, 18 m weighbridge in concrete (RCC) or heavy pit-less steel; a chemical unit in the Roha, Mahad or Patalganga MIDC 60–80 MT on 16–18 m with SMFW and the unmanned option; a rice mill 40–60 MT on 12–16 m; an RMC or aggregate yard 60–80 MT on 16–18 m. Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.

Why Symphony in Alibag

Salt air and a heavy monsoon: a weighbridge built for the Konkan coast.

  • Built for salt airConcrete (RCC) with no exposed steel platform, or protected steel with sealed load cells.
  • Ready for the Konkan monsoonRaised pit-less on pedestals, or a pit with a working drain.
  • Gate records for MIDC unitsSMFW ties every tanker to its gate pass; unmanned option available.

Who needs one in Alibag: Bulk cargo jetties and their transporters on the Dharamtar creek; steel, fertiliser and chemical plants and their material contractors; chemical, pharma-intermediate and manufacturing units in the Roha, Mahad and Patalganga MIDC estates; rice mills; sand, aggregate, RMC and building-material suppliers; transporters and public dharam kanta operators.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Pen, Roha, Mahad, Murud, Revdanda, Khopoli.

Get a quotation

Who we build for in Alibag

Jetties, chemical units and mills across Raigad district.

Jetty and bulk-cargo contractors

Tippers and trailers run heavy and wet, in salt air, through a long monsoon.

Our setup: An 80–100 MT, 18 m concrete (RCC) or heavy pit-less steel weighbridge with sealed IP67/IP68 load cells and a drained foundation.

MIDC chemical units

Every tanker must match its gate pass, and the gate runs in three shifts.

Our setup: A 60–80 MT, 16–18 m pit-less steel or RCC weighbridge with SMFW and the unmanned option (RFID, cameras, boom barrier).

Rice mills

Paddy comes in by trolley and truck after the kharif harvest, and rice and bran go out.

Our setup: A 40–60 MT, 12–16 m stamped weighbridge with SMFW slips and a raised approach for the monsoon.

Industrial areas we serve near Alibag
  • Dharamtar creek jettiesbulk cargo and its transport
  • Roha MIDCchemical and pharma-intermediate units
  • Mahad MIDCchemical and manufacturing units
  • Patalganga MIDCchemical and manufacturing units
  • Pen and Thal areasteel, fertiliser and material contractors
Advice for Alibag sites

Corrosion, drainage and bulk trucks: sizing a Raigad weighbridge.

Two things shape a weighbridge in Raigad: the sea and the monsoon. Salt air and wet cargo corrode bare steel, so a weighbridge on a creek-side or coastal site should be concrete (RCC), which has no exposed steel platform to rust, or steel with a proper protective paint system, with sealed IP67/IP68 load cells, stainless hardware where it matters and junction boxes kept off the ground. The Konkan monsoon is one of the heaviest in Maharashtra, so build a raised pit-less weighbridge on pedestals or, for a pit-type, a pit with a drain that really works, and a raised approach so water never stands under the platform. The traffic is heavy: bulk tippers and trailers for coal, ore, steel and fertiliser need 80–100 MT on 18 m so every axle is on the platform. In the MIDC chemical estates the need is different: every tanker and truck must be tied to a gate pass and a dispatch document, so SMFW records vehicle, material, gross, tare and net weight, and the unmanned option (RFID, cameras, boom barrier) keeps a three-shift gate moving with fewer disputes.

Recommended forVehiclesCapacityWeighbridgeType
Jetty / bulk-cargo contractorTippers, trailers80–100 MT18 mConcrete (RCC) or heavy pit-less steel
MIDC chemical or manufacturing unitTankers, multi-axle trucks60–80 MT16–18 mPit-less steel or RCC, SMFW + unmanned option
Rice millTractor-trolleys, trucks40–60 MT12–16 mPit-less steel or RCC, stamped
RMC / aggregate yardTippers, transit mixers60–80 MT16–18 mPit-less steel or RCC

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Alibag

From the creek-side yard to the stamped weighbridge: six steps in Raigad.

Six steps for your project in Alibag. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in AlibagTell us the heaviest vehicle you weigh (here, typically tippers, trailers), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (jetty / bulk-cargo contractor): 80–100 MT, 18 m weighbridge, Concrete (RCC) or heavy pit-less steel. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Questions from Raigad's contractors, plants and mills.

Who supplies weighbridges in Alibag and Raigad district?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges across Raigad district, including Alibag, Pen, Roha, Mahad, Murud, Revdanda and Khopoli, with Legal Metrology stamping support.
Which weighbridge suits a coastal site in Raigad?
A concrete (RCC) weighbridge, which has no exposed steel platform to rust in salt air, or steel with a proper protective paint system, with sealed IP67/IP68 load cells. Symphony gives a 25-year structural warranty on the RCC structure (terms apply).
Which weighbridge suits a chemical unit in the Roha or Mahad MIDC?
A 60–80 MT, 16–18 m pit-less steel or RCC weighbridge for tankers and trucks, with SMFW records against every gate pass and the unmanned option (RFID, cameras, boom barrier) for a three-shift gate.
रायगढ़ के तटीय क्षेत्र में धर्म कांटा स्थापित करने से पहले क्या देखें?
समुद्री खारी हवा में बिना सुरक्षा वाले स्टील पर जंग लगने की संभावना अधिक रहती है, इसलिए कंक्रीट (RCC) या सुरक्षात्मक पेंट वाला स्टील धर्म कांटा, सील्ड IP67/IP68 लोड सेल और भारी बारिश के लिए ऊंचा पिट-लेस डिज़ाइन या पानी निकासी वाला पिट चुनें।
What decides the cost of a weighbridge in Raigad?
Capacity (40–60 MT for a rice mill, 60–80 MT for an MIDC unit, 80–100 MT for bulk cargo), length (12–18 m), the type (pit-less steel, pit-type or concrete (RCC)), corrosion protection for the coast, the foundation and drainage for the monsoon, and options such as SMFW and the unmanned system. Send your heaviest vehicle and daily truck count; an engineer replies within one working day.
रायगढ़ की MIDC रासायनिक इकाई के लिए कौन सा धर्म कांटा उपयुक्त है?
टैंकरों और ट्रकों के लिए 60–80 टन क्षमता और 16–18 मीटर लंबाई का पिट-लेस स्टील या RCC धर्म कांटा उपयुक्त है, जिसमें SMFW सॉफ़्टवेयर और मानवरहित विकल्प (RFID, कैमरा, बूम बैरियर) हो। सिम्फनी 1998 से धर्म कांटे बनाता है और स्टैम्पिंग में सहायता प्रदान करता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com