Amirgadh weighbridge, reserved on the first plot plan.
A July 2023 news report named a tribal industrial park at Amirgadh, in Banaskantha district, among four such parks whose ground-breaking had been initiated virtually in October 2022. If you are planning a unit or a trading yard here, Symphony can help you reserve space for a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) before sheds and compound walls take it away.
A new unit receiving multi-axle trucks should plan 50 to 60 MT on 12 to 16 m, with room left to extend the approach. Long trailers need 60 to 80 MT on 18 m, tractor trolleys and small goods vehicles 30 to 40 MT on 7.5 to 9 m. Ask for Class III accuracy, load cells rated IP68/IP69K and SMFW software. Dispatch is about 2 weeks after your purchase order is commercially cleared, and stamping support comes with the supply.
Space saved now is paving unbroken later.
- Reserve the laneMark it on the first plot layout.
- Test the soilLet the result shape the foundation.
- Confirm utilitiesPlan power backup before commissioning.
Who needs one in Amirgadh: Planning ahead is the advantage of a young industrial location. An allottee who draws the weighing lane on the first layout avoids breaking finished paving later, and a promoter can match the platform to the vehicles the project will use. Ask three questions now: what will arrive by truck, what will leave, and which of those movements is billed by weight. A food or forest-produce processor, a stone or block unit and a stores contractor would answer them differently, so write your own list instead of copying a neighbouring plot.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.
Produce, materials, dispatch: weigh from the first load.
Buying produce from growers
The seller wants to see the figure that decides payment.
Our setup: Suggested: a display facing the vehicle and a printed slip handed over at once.
Receiving building material
A new project takes in sand, steel and cement before it produces anything.
Our setup: Suggested: weigh construction receipts from the first load and file them by supplier.
Sending out finished loads
A new unit has no weighing history to settle a short-weight claim.
Our setup: Suggested: loaded and empty weights on one ticket, with invoice number and operator name.
- Amirgadh tribal industrial parkNamed in a July 2023 news report. Current status not confirmed; please check with the authorities.
Soil, water, power: settle them before concrete.
Treat the plot drawing, and the allotment letter if your plot has one, as the first documents of the weighbridge job. Confirm from them where the boundary, building lines, internal road and any drain reserve lie, and ask the estate office whether a gate position needs approval. Check the present status of the park and of power and water at your plot, because a 2023 announcement does not show what is ready on a given day. Next, examine the ground. Filled or levelled land can settle unevenly, so have the soil tested and let the foundation design follow the result instead of a drawing borrowed from another site. Note the natural fall of the plot and the path that monsoon water takes across it; set the platform where water drains away, with ramps that do not form a basin at either end. Keep a straight length before and after the platform so a loaded vehicle does not climb on while still turning. Decide early whether power is steady enough for the indicator, printer and computer, and provide battery backup, proper earthing and surge protection either way. Run the signal cable in conduit, away from welding and power cables, with an inspection point you can open. Put the cabin on the side where the driver can hand over papers without walking behind a moving truck. A foundation-free modular model suits a plot whose long-term layout is undecided, provided it rests on a hard, level surface. A weighbridge used for buying or selling must be verified and stamped by the Legal Metrology officer before use, re-verified when due, and verified again after repair or shifting.
| Recommended for | Vehicles | Capacity | Length | Note |
|---|---|---|---|---|
| Unit with mixed truck traffic | Rigid multi-axle | 50–60 MT | 12–16 m | Leave approach length for growth |
| Trailer-based dispatch | Articulated trailers | 60–80 MT | 18 m | Check the turning path first |
| Produce intake point | Tractor trolleys | 30–40 MT | 7.5–9 m | Print the seller's name |
| Block or aggregate yard | Tippers | 50–60 MT | 9–12 m | Clear spilled grit daily |
| Plot with undecided layout | Short rigid trucks | 40 MT | 9 m | Foundation-free modular model |
| Sack intake in a shed | Hand carts | Platform scale | Indoor size | No truck approach needed |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From allotment drawing to a verified machine.
Six steps for your project in Amirgadh. For foundation-based models, curing takes time, so the drawing comes first.
- 1 · Your traffic in AmirgadhTell us the heaviest vehicle you weigh (for example, rigid multi-axle), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (unit with mixed truck traffic): 50–60 MT, 12–16 m weighbridge; leave approach length for growth. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Timing, shifting, records: new-unit questions.
When should a new allottee order the weighbridge?
Can the foundation be cast before the order?
Can the machine be moved to another plot later?
How do we keep records across suppliers?
Is an operator always needed?
What does the warranty cover?
What decides the cost of a weighbridge at an Amirgadh plot?
अमीरगढ़ के नए औद्योगिक प्लॉट पर धर्म कांटा कब और कैसे स्थापित करें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.