Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Ankleshwar · Gujarat

Ankleshwar weighbridges for tankers, dyes and chemicals.

Ankleshwar GIDC is one of Gujarat's largest chemical estates: dyes, pesticides, bulk drugs, intermediates and solvents, plus the Panoli estate and oil-field work in the same belt. Most loads here move as liquids or drums in tankers and trucks, and every kilo of a chemical has a price, a gate pass and an audit trail. Symphony supplies weighbridges, truck scales and dharam kanta across Ankleshwar, Panoli, Hansot and Valia.

Quick answer

For Ankleshwar and Panoli GIDC units that receive road tankers, a 60 MT weighbridge with an 18 m concrete (RCC) deck and stored tares is the safe choice; units that see only 2–3 axle drum trucks can use 40 MT on 12–16 m. Symphony builds it in Ahmedabad.

Why Symphony in Ankleshwar

Every kilo of chemical has a price and a pass.

  • Tare and gross, both storedSMFW keeps stored tares, so every tanker slip shows gross, tare and net with the challan number.
  • Concrete decks for chemicalsRCC decks resist spills and fumes, with a 25-year structural warranty on the RCC concrete (T&C apply).
  • Straight in, straight outThe deck is placed so a tanker drives on and off without reversing on a busy estate road.

Who needs one in Ankleshwar: Dyes and dye intermediates, agrochemicals and pesticides, bulk drugs and pharma, specialty chemicals and solvent recovery in the Ankleshwar and Panoli GIDC estates, oil and gas field services, common waste-treatment facilities, and tanker transport on NH-48.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Panoli, Hansot, Valia.

Get a quotation

Who we build for in Ankleshwar

Dyes, solvents and waste loads.

Dyes and agrochemicals

Liquids and powders move in tankers and drums, and each batch must reconcile with the stock register and the gate pass.

Our setup: A 60 MT, 16–18 m concrete (RCC) deck with SMFW slips carrying batch or challan numbers.

Solvent recovery and tank farms

Road tankers are filled and emptied all day, and a wrong tare means a wrong invoice.

Our setup: A 60 MT, 18 m RCC deck with stored tares, RFID and a boom barrier, so each tanker is identified and logged.

Waste sent for treatment

Waste sent for treatment and disposal is usually charged by weight, and the slip can support the waste record.

Our setup: A stamped weighbridge with numbered SMFW slips kept for every outgoing load, ready for inspection.

Industrial areas we serve near Ankleshwar
  • Ankleshwar GIDCdyes, agrochemicals, bulk drugs and specialty chemicals
  • Panoli GIDCchemicals and pharma
Advice for Ankleshwar sites

Gross is half the story. Tare matters too.

In Ankleshwar the weighbridge is part of chemical control. Tankers are weighed full and empty, so tare matters as much as gross: SMFW software keeps stored tares and prints gross, tare and net with the vehicle and challan number. Spills and fumes corrode painted steel, so a concrete (RCC) deck with a drained surround keeps the load cells clean and lasts longer. Many plots are compact and the estate roads are busy, so place the deck where a tanker can drive on and off in a straight line without reversing.

Recommended forVehiclesCapacityDeckType
Dye / agrochemical unitTankers, drum trucks60 MT16–18 mConcrete (RCC)
Solvent recovery / tank farmRoad tankers60 MT18 mConcrete (RCC) + unmanned
Waste sent for treatmentTrucks, tankers, drum loads40–60 MT12–16 mConcrete (RCC), numbered slips

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Ankleshwar

From tanker list to stored tares.

Six steps for your project in Ankleshwar. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in AnkleshwarTell us the heaviest vehicle you weigh (here, typically tankers, drum trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (dye / agrochemical unit): 60 MT, 16–18 m deck, Concrete (RCC). The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the deck arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationDeck placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Ankleshwar GIDC questions.

Who supplies weighbridges in Ankleshwar?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges for units in Ankleshwar GIDC, Panoli GIDC, Hansot and Valia, with Legal Metrology stamping support. Symphony weighbridges are already installed at sites in Ankleshwar and Dahej.
Which weighbridge suits a chemical or dye unit in Ankleshwar GIDC?
For tankers, a 60 MT concrete (RCC) deck of 16–18 m, chosen by your longest tanker; 40 MT only where 2–3 axle drum trucks are the heaviest vehicle. Spills and fumes corrode painted steel, which is why the deck is concrete. Sealed IP67/IP68 load cells and a drained surround keep chemicals away from the electronics.
Can the weighbridge keep tanker tare weights?
Yes. SMFW weighment software stores tare weights per vehicle, prints gross, tare and net with your challan or gate-pass number, and keeps every record for audit.
How long does delivery to Ankleshwar take?
Dispatch is about 2 weeks from a commercially cleared order with PO. Plan the drain and the truck path with the foundation drawing; installation and calibration follow once the concrete has cured.
How much does a weighbridge cost in Ankleshwar?
It depends on capacity, deck length, deck type, electronics and add-ons such as RFID and a boom barrier, plus civil work for drains. A 40 MT, 12 m deck for a pharma unit costs less than a 60 MT, 18 m unmanned RCC bridge for a tank farm. Send your longest tanker, plot layout and daily truck count; an engineer replies within one working day.
अंकलेश्वर GIDC में टैंकर तौलने के लिए कौन सा धर्म कांटा उपयुक्त है?
टैंकरों के लिए 60 टन, 16–18 मीटर का कंक्रीट (RCC) डेक उपयुक्त रहता है, और SMFW सॉफ़्टवेयर हर टैंकर का टेयर वज़न सुरक्षित रखता है। सिम्फनी 1998 से अहमदाबाद में धर्म कांटे बनाता है और स्टैम्पिंग सपोर्ट देता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com