Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Dholera SIR · Gujarat

Dholera SIR weighbridges for a city under construction.

The Dholera Special Investment Region, on the Gulf of Khambhat in Ahmedabad district, is still being built: roads, utilities and the first large plants, including a large semiconductor fab project, are under construction. Today its weighbridges weigh what builds a new city: aggregate, sand, fill, cement and steel. Later they will weigh what its factories make.

Quick answer

For a contractor or RMC plant at Dholera SIR, a 60–80 MT weighbridge (truck scale) with a 12–18 m deck weighs tippers and bulk trailers, and a modular deck can move to the next package when the job ends. Permanent plants built later can choose a concrete (RCC) deck with unmanned gate weighing. Symphony builds it in Ahmedabad.

Why Symphony in Dholera SIR

Every tonne of fill is billed. Prove it on the slip.

  • Foundations for soft, saline groundSoil check first, foundation and ramps above the plot's highest water level and a proper drain, so the load cells stay dry.
  • Modular for moving packagesBolt-together modular decks move to the next site when a construction package ends.
  • Every tonne of fill, provedA stamped Class III (OIML R76) slip settles each tipper load of aggregate, sand or fill with the client.

Who needs one in Dholera SIR: Construction of roads, trunk infrastructure and plant buildings in the Dholera SIR activation area, a large semiconductor fab project, supply of aggregate, sand, fill and ready-mix concrete, steel and cement deliveries, and farming in the Bhal region.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Dholera, Dhandhuka, Bhal region.

Get a quotation

Who we build for in Dholera SIR

Fill, ready-mix and future plant gates.

Road and infrastructure contractors

Aggregate, sand and fill arrive by tipper all day and are billed per tonne; the package moves on when the work ends.

Our setup: A modular 60–80 MT deck of 12–16 m on a hard, level concrete surface, with SMFW slips per tipper and per site.

RMC and batching plants

Cement, aggregate and sand come in by weight while ready-mix leaves by the cubic metre, so every incoming load decides the mix cost.

Our setup: A 60 MT, 16–18 m deck at the plant gate, with stored tares for transit mixers and bulkers.

Gates of the coming plants

Large plants need weighing their audits accept, round the clock, from the first day of operation.

Our setup: An 18 m concrete (RCC) deck with RFID, cameras and a boom barrier, planned together with the gate layout.

Industrial areas we serve in and around Dholera SIR
  • Dholera SIR activation arearoads, utilities and the first large plants
  • Dholera, Dhandhuka and the Bhal regionfarming, trading and construction supply
Advice for Dholera SIR sites

Soft, salty ground: the foundation comes first.

Much of the Dholera ground is low-lying, clayey and saline, between the coast and the Bhal plains. That makes the foundation the first decision: get a soil check, design the foundation to it, set the foundation, load-cell pedestals and approach ramps above the plot's highest water level, avoid a pit, and give it a proper drain. Salt in the air and soil attacks painted steel, so for a permanent installation a concrete (RCC) or steel-cum-RCC deck lasts longer and carries a 25-year structural warranty on the RCC concrete (T&C apply). Construction packages end and move on, so contractors often prefer a modular deck that bolts together on a hard, level concrete surface and can be shifted. Aggregate, sand and fill are billed by the tonne, so every load needs a stamped slip.

Recommended forVehiclesCapacityDeckType
Road / infrastructure contractorTippers, dumpers60–80 MT12–16 mModular steel
RMC / batching plantAggregate tippers, cement bulkers60 MT16–18 mPit-less steel or concrete (RCC)
Permanent plant gate (later phase)Trailers, multi-axle trucks, tankers60–80 MT18 mConcrete (RCC) + unmanned

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Dholera SIR

From soil check to a calibrated deck.

Six steps for your project in Dholera SIR. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in Dholera SIRTell us the heaviest vehicle you weigh (here, typically tippers, dumpers), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (road / infrastructure contractor): 60–80 MT, 12–16 m deck, Modular steel. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the deck arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationDeck placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Dholera SIR questions.

Who supplies weighbridges at Dholera SIR?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges for contractors, plants and traders across Gujarat, including the Dholera SIR, Dholera, Dhandhuka and the Bhal region, with Legal Metrology stamping support.
Which weighbridge suits a construction contractor at Dholera?
A modular 60–80 MT weighbridge of 12–16 m: it bolts together on a hard, level concrete surface, weighs heavily loaded tippers with capacity to spare, and can be moved to the next package when the job ends; after each move it is recalibrated and re-verified by Legal Metrology before trade use.
Dholera soil is soft and salty. What foundation does a weighbridge need?
Start with a soil check and design the foundation to it. Set the foundation, pedestals and approach ramps above the plot's highest water level, avoid a pit, give it a drain, and choose sealed IP67/IP68 load cells. For a permanent installation, a concrete (RCC) or steel-cum-RCC deck, with concrete grade and cover chosen for saline ground, resists salt better than painted steel.
How soon can you deliver to Dholera SIR?
Dispatch is about 2 weeks from a commercially cleared order with PO. On Dholera's soft ground a modular deck needs no foundation, only a hard, level concrete surface checked against the soil; a permanent deck follows the foundation drawing, with installation and calibration once the concrete has cured.
How much does a weighbridge cost at Dholera SIR?
It depends on capacity, deck length, modular or permanent build, the foundation the soil needs and electronics. A modular 60 MT deck for a contractor costs less than a permanent 80 MT concrete (RCC) gate bridge with unmanned weighing; soft ground can add foundation work. Send your heaviest vehicle, the soil report if you have one and the daily truck count; an engineer replies within one working day.
धोलेरा SIR में निर्माण परियोजना के लिए धर्म कांटा कैसे स्थापित करें?
पहले मिट्टी की जाँच करवाएँ और उसी के अनुसार नींव तैयार करें। ठेकेदारों के लिए 60–80 टन का मॉड्यूलर धर्म कांटा उपयुक्त रहता है, जिसे काम पूरा होने पर अगली साइट पर स्थापित किया जा सकता है (स्थानांतरण के बाद पुनः सत्यापन आवश्यक)। सिम्फनी 1998 से अहमदाबाद में धर्म कांटे बनाता है और स्टैम्पिंग सपोर्ट देता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com