
Dudu weighbridges for the salt works, the mandi trolleys and the Jaipur–Ajmer trailers.
Dudu lies on the Jaipur–Ajmer corridor in Jaipur district, with Mauzamabad, Phagi, Phulera and Sambhar among the towns that trade through it. The highway carries a steady stream of goods trucks past its mandi yards; the Sambhar salt lake, India's largest inland salt lake, supplies the salt works around Sambhar; Phagi and Dudu farms send out wheat, mustard, bajra and vegetables; and stone, building material and fertiliser move in the other direction. Symphony has supplied three 100 MT steel-cum-RCC weighbridges to Sambhar Salts in Rajasthan, and supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across the Dudu area.
Salt works and transporters around Sambhar commonly take 100 MT on 18 m in steel-cum-RCC, since salt is heavy, corrosive and loaded in all weather; Symphony has supplied three such weighbridges to Sambhar Salts. A mandi trader at Dudu, Phagi or Mauzamabad handling wheat, mustard and bajra usually fits a stamped pit-less steel platform of 60 MT and 16 m, flour and oil mills 40–60 MT on 12–16 m, and a stone or building-material yard 80–100 MT on 18 m with an RCC top. Highway transporters and a public dharam kanta on the Jaipur–Ajmer road generally choose 60–100 MT on 16–18 m. Ahmedabad fabrication, and dispatch about 2 weeks after a commercially cleared order with PO.
Brine that eats steel and trailers that stop on the highway: why a Dudu weighbridge is built differently.
- Brine in the joints and damp air near the lakeSteel-cum-RCC at 100 MT, as in the three Sambhar Salts weighbridges; we recommend 18 m with IP68/IP69K sealed cells and a sealed junction box.
- Mandi trolleys queue at the gate in March and AprilA 60 MT, 16 m platform, each trolley's tare on file, an SMFW slip for every seller.
- Trailers stopping on the highwayA long, level, drained approach on both sides so a trailer stands square on the platform.
Who needs one in Dudu: Salt producers, packers and transporters around Sambhar; wheat, mustard and bajra traders and commission agents at the Dudu, Phagi and Mauzamabad mandi yards; flour and oil mills; vegetable and fodder growers and traders at Phagi; owners of stone and building-material yards and brick kilns; fertiliser, seed and agri-input dealers; cold-store and godown operators; goods transporters and highway dhaba and fuel stations on the Jaipur–Ajmer road; goods handlers at Phulera; owners of public dharam kanta.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Mauzamabad, Phagi, Sambhar, Phulera, Naraina.
Salt works, grain traders and highway yards across the Dudu area.
Salt works and salt transporters
Brine creeps into every joint and salt is loaded in all weather, so an ordinary steel platform is eaten away in a few seasons.
Our setup: Steel-cum-RCC at 100 MT, as in the three weighbridges supplied to Sambhar Salts; we recommend 18 m, with sealed IP68/IP69K load cells, a sealed junction box and approaches that drain away from the wheels.
Mandi traders and mills
Mustard and wheat arrive in March and April, bajra and vegetables in autumn, and trolleys queue at the gate until the price is settled.
Our setup: A pit-less steel platform of 60 MT and 16 m with stored trolley tares, an SMFW slip for each seller and a remote display.
Highway transporters and stone yards
Trailers of cement, grain and stone stop to be weighed, and a trailer that stands at an angle reads wrongly.
Our setup: A long, level, drained approach on both sides and 80–100 MT on 18 m, with an RCC top where stone is handled.
- Dudu town and the mandithe mandi yard, flour and oil mills, building-material yards, goods depots, garages
- Mauzamabadgrain traders, godowns, fertiliser and seed dealers
- Phagiwheat, bajra and vegetable trade, fodder growers, cold stores
- Sambhar and the lakesalt works, packers, salt transporters
- Phuleragoods handlers, transport depots, building-material stockists
- The Jaipur–Ajmer highwaygoods transporters, public weighbridge operators, cement and stone carriers
Sandy loam with kankar and damp near the lake: founding a weighbridge at Dudu.
Salt is the first thing a weighbridge in the Dudu area has to survive. Brine creeps into every joint of a steel structure, and a salt-works platform stands in spray and damp that can eat bare steel in a few seasons, which is why steel-cum-RCC suits a salt works; Symphony has supplied three 100 MT weighbridges of this type to Sambhar Salts. The same thinking applies to any yard near the lake: concrete over the load-bearing frame, IP68/IP69K sealed load cells, a sealed junction box, and approaches laid so that brine does not stand under the wheels. Further from the lake the work is the farm calendar. Mustard and wheat reach the Dudu, Phagi and Mauzamabad mandis in March and April, bajra and vegetables in the autumn, and trolleys wait their turn at the gate, so a pit-less steel platform of 60 MT and 16 m with stored trolley tares and SMFW slips keeps the queue moving. The highway adds its own load: trailers carrying cement, stone and grain stop at roadside weighing points, where the approach must be long and level so that an articulated trailer stands square. Soil in the area is often sandy loam with kankar, which supports a pedestal foundation well once the pit-less platform is raised clear of rain. The foundation drawing needs a yard photograph and the weight of the heaviest vehicle. Salt travels in two forms: crude salt in bulk from the pans to the refineries and packers, and packed salt out by the truckload to the plains. The first is weighed on the heavy platforms at the works, the second often at a goods yard, and because salt takes up moisture from the air, a time-stamped slip is the fairest record for buyer and seller alike. Phulera's goods yard and the transporters around it handle cement, fertiliser and grain by rail and by truck, and a weighbridge in the transporter's own yard lets him fix the freight on the real weight before the vehicle leaves. Phagi's vegetable and fodder growers sell by the trolley, and a stored trolley tare turns every sale into a one-minute transaction.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Salt works, packer or transporter around Sambhar | Loaded salt trucks, bulkers and tippers | 100 MT | 18 m | Steel-cum-RCC, stamped |
| Mandi trader or agent at Dudu, Phagi or Mauzamabad | Tractor-trolleys, pick-ups, 10-wheel lorries of wheat, mustard and bajra | 60 MT | 16 m | Pit-less steel, stamped |
| Flour mill or oil mill | Smaller lots on pick-ups and single trolleys | 40–60 MT | 12–16 m | Pit-less steel, stamped |
| Stone or building-material yard, brick kiln | Laden 10- and 12-wheel tippers | 80–100 MT | 18 m | RCC top, stamped |
| Goods transporter or goods yard at Phulera | Trailers and lorries of cement, grain and general freight | 60–100 MT | 16–18 m | Pit-less steel, stamped |
| Public dharam kanta on the Jaipur–Ajmer road | Tractors, tippers, lorries and trailers | 60–100 MT | 16–18 m | Pit-less steel or RCC, stamped (dharam kanta) |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From the salt-works drawing at Sambhar to the first stamped truck: how a Dudu order is delivered.
Six steps for your project in Dudu. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in DuduTell us the heaviest vehicle you weigh (here, typically loaded salt trucks, bulkers and tippers), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (salt works, packer or transporter around Sambhar): 100 MT, 18 m weighbridge, Steel-cum-RCC, stamped. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Dudu's salt producers, mandi traders and highway transporters.
Who supplies weighbridges in Dudu?
Which weighbridge suits a salt works around Sambhar?
Which weighbridge suits a mandi trader or a flour mill in Dudu?
How long does a Dudu weighbridge take to arrive?
What decides the cost of a weighbridge in Dudu?
डूडू में नमक कारखाने, मंडी या हाईवे यार्ड के लिए धर्म कांटा स्थापित करते समय किन बातों का ध्यान रखें?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
