
Gozaria GIDC weighbridges for factories, feed units and yards.
Gozaria GIDC is an industrial estate in Mehsana district, in north Gujarat. A busy road runs past an estate of this kind, so trucks queue wherever the gate lets them, and the weighbridge decides whether that queue stands on the estate road or inside the plot. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for factory gates, feed and oil units and contractor yards at Gozaria GIDC.
For engineering and feed units a sensible starting size is a 60 MT, 16 m pit-less steel weighbridge, the indicator set in the cabin beside the exit. A casting or machine shop with 10-wheelers and tempos takes 40 MT on 12 m; an oil mill, feed mill or agro yard with long bulk trucks takes 60–80 MT on 16–18 m; and a contractor yard needing quick weight can set down a foundation-free modular weighbridge on level concrete. Plan on roughly 2 weeks between a cleared PO and the unit leaving the Ahmedabad works.
Keep the queue inside your gate: a weighbridge set back from the road.
- The queue stands inside your plotSet back from the road with a straight run, so a waiting truck never blocks traffic.
- Sized for the heaviest laden truckCapacity and platform length follow the biggest bulk tanker or tipper you receive, with a margin.
- Slips that settle seed and feed lotsSMFW prints truck number, party and material on every slip, and totals each day.
Who needs one in Gozaria GIDC: Engineering, packaging, feed, agro and oil-related units, as typical for the region, plus trading yards and transport operators.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Mehsana, Vijapur, Kadi.
Feed mills, oil crushers and fabricators across Gozaria GIDC and the Mehsana belt.
Cattle-feed and dairy-supply units
Raw material arrives by the bulk truck and bagged feed leaves by the lot, so both are billed by the tonne.
Our setup: Suggested: 60–80 MT, 16–18 m heavy steel with a closed junction box and sealed cells.
Castor and edible-oil processors
Seed lots are bought on the slip, and a disputed figure can hold up the day's crushing.
Our setup: Suggested: 80 MT, 18 m steel or RCC with party-wise SMFW slips and a repeat display.
Engineering and casting shops
Metal arrives in mixed loads and finished castings go out in small, frequent trips.
Our setup: Suggested: 40–60 MT, 12–16 m pit-less steel with a drained apron.
- Gozaria GIDC plots and estate roadsengineering, feed, oil and packaging units
- Mehsanadistrict trade and processing yards
- Vijapurindustrial and trading yards
- Kadiindustrial and trading yards
Road-facing gates, heavy bulk trucks and feed dust: siting a Gozaria weighbridge.
On a plot that faces a busy road the first design question is where the queue will stand. If the gate opens straight onto the road, a truck waiting for the scale blocks traffic, so set the weighbridge back far enough for a full truck, or two, to wait inside the plot, with a level straight approach of one truck length before the platform. Stand the cabin on the exit side, so the display and the slip slot are within easy reach of the driver from the seat. A feed or oil unit weighs very heavy trucks, and a bulk tanker or tipper can be well above 40 tonnes loaded, so choose the capacity by the largest laden vehicle and keep a margin. Castor and oilseed lots change hands on the figure, so the slip should carry the truck number, date, party and material, and SMFW prints exactly that. Dust and fine powder settle on a platform in a feed unit, so sweep the platform daily and use a closed junction box with IP68/IP69K sealed cells; where a casting shop sprays water or coolant, a drained apron keeps the cells clear of puddles. Pit-less steel on raised pedestals can be cleaned underneath and checked any day without breaking concrete. A site that unloads at night can add RFID tags, cameras and a boom barrier so that regular carriers are logged with nobody in the cabin. Heavy motors can pull the supply down for a moment, so the computer needs a UPS or stabiliser, proper earthing and a surge arrestor. For trade use, Legal Metrology verification must be done before billing and repeated yearly, and we help with the stamping paperwork. Send a plot plan, the road side and a gate photograph, and we mark the platform, queue space and cabin.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Engineering or foundry unit | Ingot, scrap and stock in; castings out | 60 MT | 16 m | Raised-pedestal steel with a gate-side repeat display |
| Machine shop with small trucks | Short runs of finished parts | 40 MT | 12 m | Shallow steel platform, stamping support available |
| Cattle-feed or dairy-supply mill | Grain and cake in, bagged feed out | 60–80 MT | 16–18 m | Strong steel frame, boxed wiring, IP68/IP69K sealed cells |
| Castor or edible-oil processor | Seed lots in, oil and cake out by tanker and truck | 80 MT | 18 m | Steel or RCC build, each party on its own slip |
| Contractor or stone-and-sand yard | Tipper loads of aggregate and cement | 60 MT | 16 m | Modular, set on level concrete without a pit |
| Night receiving gate | Regular carriers after dark | 60–80 MT | 16–18 m | Tag reader, cameras and barrier arm on one SMFW screen |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From a plot sketch to the first slip: a Gozaria GIDC weighbridge in six steps.
Six steps for your project in Gozaria GIDC. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in Gozaria GIDCTell us the heaviest vehicle you weigh (here, typically ingot, scrap and stock in; castings out), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (engineering or foundry unit): 60 MT, 16 m weighbridge, Raised-pedestal steel with a gate-side repeat display. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
What Gozaria GIDC plant heads and yard managers ask first.
Who supplies weighbridges at Gozaria GIDC?
Where should the weighbridge go on a plot facing the road?
What size suits a feed or oil unit?
Does feed dust harm a weighbridge?
Can castor or seed lots be weighed fast?
Can we run a night lane without staff?
Is a modular weighbridge possible for a contractor yard?
What decides the cost of a weighbridge at Gozaria GIDC?
गोज़ारिया जीआईडीसी में फ़ीड या तेल इकाई के लिए वेब्रिज कैसे चुनें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
