Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Chhatral GIDC · Gujarat

Chhatral GIDC weighbridges for tube mills and chemical units.

Chhatral GIDC in Kalol taluka is known for steel tube and pipe makers, chemical units and engineering shops, with the Kalol estates and their plastics and fertiliser units in the same belt. Here a weighbridge (truck scale) has two jobs: weigh long tube trailers in one go and keep every chemical lot on record.

Quick answer

At a Chhatral GIDC tube or pipe mill, where output is counted in metres but invoiced in tonnes, a 60–80 MT weighbridge (truck scale) with an 18 m deck checks each trailer lot against its invoice; chemical units dispatching drums and bags usually need 40 MT on a 12 m deck. Symphony builds it in Ahmedabad, with Legal Metrology stamping support.

Why Symphony in Chhatral GIDC

Made by the metre, sold by the tonne.

  • Made by the metre, sold by the tonneA stamped Class III (OIML R76) weighbridge checks every tube lot against the weight on the invoice.
  • Full trailers in one goAn 18 m deck holds most 12 m tube trailers with every axle on the platform; we confirm against your longest rig.
  • Clean decks for powdersSealed IP67/IP68 load cells and a drained surround keep chemical dust and wash water away from the electronics.

Who needs one in Chhatral GIDC: Steel tube and pipe manufacturing, chemicals and pharma, and engineering and fittings units in Chhatral GIDC and the private estates along Chhatral road; plastics, fertiliser and agro-chemical units in and around Kalol GIDC; and oil-field service work in the Kalol belt.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Chhatral, Kalol (Gandhinagar).

Get a quotation

Who we build for in Chhatral GIDC

Tubes, chemicals and bagged fertiliser.

Tube and pipe makers

Production is counted in metres and pieces, but steel is bought and sold by weight. A lot that weighs light or heavy against its invoice costs money either way.

Our setup: A 60–80 MT, 18 m pit-less deck stamped for trade, with SMFW slips that carry the lot or invoice number.

Chemical and powder units

Raw materials arrive in bags and drums; finished product often leaves in small, valuable lots. Dust and wash water are part of every day.

Our setup: A 40 MT, 12 m deck with sealed IP67/IP68 load cells and a drained surround; ask about a concrete (RCC) deck where wash-down is frequent.

Fertiliser and agro-chemical dispatch (Kalol)

Bagged product leaves in seasonal peaks, truck after truck, often into the evening, and each load must match its dispatch note.

Our setup: A 60 MT, 16 m deck with the unmanned option (RFID, cameras, boom barrier), so late dispatches are weighed and logged without an operator.

Industrial areas we serve in and around Chhatral GIDC
  • Chhatral GIDCsteel tubes and pipes, chemicals, pharma and engineering
  • Kalol GIDC (Gandhinagar)engineering, plastics and chemicals
  • Private estates along Chhatral roadengineering, fittings and fabrication units
Advice for Chhatral GIDC sites

Long tubes, fine dust: plan the deck for both.

Tubes and pipes are made by the metre but bought and sold by the tonne, so the weighbridge is the check between the mill's length-based production and the weight on the invoice. Shorter lengths ride on trucks; 12 m lengths come and go on trailers, and the deck must hold every axle at once. Chemical units ship fine powders in bags and drums: dust settles in the gaps around a deck, so sealed IP67/IP68 load cells and a drained surround keep the electronics clean, and a concrete (RCC) deck is worth asking about where wash-down is frequent. Units on the busy highway side should leave room for a truck to queue off the road before it weighs.

Recommended forVehiclesCapacityDeckType
Steel tube / pipe makerTrailers with 12 m lengths, multi-axle trucks60–80 MT18 mPit-less steel
Chemical unitDrum and bag trucks, 2–3 axle40 MT12 mConcrete (RCC) or pit-less steel
Engineering / fittings unitPick-ups to 2-axle trucks30 MT9 mPit-less steel

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Chhatral GIDC

From rig length to a stamped lot slip.

Six steps for your project in Chhatral GIDC. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in Chhatral GIDCTell us the heaviest vehicle you weigh (here, typically trailers with 12 m lengths, multi-axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (steel tube / pipe maker): 60–80 MT, 18 m deck, Pit-less steel. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the deck arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationDeck placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Chhatral and Kalol questions.

Who makes weighbridges for Chhatral GIDC?
Symphony Weighing Leader (S.M.F. Enterprise) builds weighbridges in its own Ahmedabad workshop and supplies and installs weighbridges across Gujarat, including units in Chhatral GIDC and Kalol GIDC, with Legal Metrology stamping support.
Which weighbridge suits a tube or pipe manufacturer?
A 60–80 MT weighbridge with an 18 m deck, so a trailer of 12 m tubes is weighed with every axle on the platform. Check the overall length of your longest rig before the deck length is fixed.
Chemical powder dust settles everywhere. Will it affect the weighbridge?
Dust and wash water packed into the gap around a deck can foul it and attack the load cells. We use sealed IP67/IP68 load cells and plan a drained surround; a concrete (RCC) deck is an option where wash-down is frequent. Clearing the gaps belongs in the routine checks.
How soon can you install in Chhatral GIDC?
Dispatch is about 2 weeks from a commercially cleared order with PO; installation and calibration follow once the foundation concrete has cured. Plan the truck queue space off the highway along with the foundation drawing.
How much does a weighbridge cost in Chhatral GIDC?
It depends on capacity, deck length, steel or concrete (RCC) deck, foundation and electronics. A tube maker's 60–80 MT, 18 m bridge costs more than a 30 MT, 9 m deck for a fittings unit, and the unmanned option adds RFID, cameras and a barrier. Send your longest vehicle, the plot layout and daily truck count; an engineer replies within one working day.
छत्राल GIDC में पाइप और ट्यूब उद्योग के लिए कौन-सा धर्म कांटा उपयुक्त है?
12 मीटर पाइप के ट्रेलर के लिए 60–80 टन क्षमता और 18 मीटर डेक वाला धर्म कांटा उपयुक्त रहता है, ताकि पूरा ट्रेलर एक बार में तौला जाए और हर लॉट की प्रमाणित पर्ची मिले। सिम्फनी 1998 से अहमदाबाद में धर्म कांटे बनाता है और स्टैम्पिंग सपोर्ट देता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com