
Chhatral GIDC weighbridges for tube mills and chemical units.
Chhatral GIDC in Kalol taluka is known for steel tube and pipe makers, chemical units and engineering shops, with the Kalol estates and their plastics and fertiliser units in the same belt. Here a weighbridge (truck scale) has two jobs: weigh long tube trailers in one go and keep every chemical lot on record.
At a Chhatral GIDC tube or pipe mill, where output is counted in metres but invoiced in tonnes, a 60–80 MT weighbridge (truck scale) with an 18 m deck checks each trailer lot against its invoice; chemical units dispatching drums and bags usually need 40 MT on a 12 m deck. Symphony builds it in Ahmedabad, with Legal Metrology stamping support.
Made by the metre, sold by the tonne.
- Made by the metre, sold by the tonneA stamped Class III (OIML R76) weighbridge checks every tube lot against the weight on the invoice.
- Full trailers in one goAn 18 m deck holds most 12 m tube trailers with every axle on the platform; we confirm against your longest rig.
- Clean decks for powdersSealed IP67/IP68 load cells and a drained surround keep chemical dust and wash water away from the electronics.
Who needs one in Chhatral GIDC: Steel tube and pipe manufacturing, chemicals and pharma, and engineering and fittings units in Chhatral GIDC and the private estates along Chhatral road; plastics, fertiliser and agro-chemical units in and around Kalol GIDC; and oil-field service work in the Kalol belt.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Chhatral, Kalol (Gandhinagar).
Tubes, chemicals and bagged fertiliser.
Tube and pipe makers
Production is counted in metres and pieces, but steel is bought and sold by weight. A lot that weighs light or heavy against its invoice costs money either way.
Our setup: A 60–80 MT, 18 m pit-less deck stamped for trade, with SMFW slips that carry the lot or invoice number.
Chemical and powder units
Raw materials arrive in bags and drums; finished product often leaves in small, valuable lots. Dust and wash water are part of every day.
Our setup: A 40 MT, 12 m deck with sealed IP67/IP68 load cells and a drained surround; ask about a concrete (RCC) deck where wash-down is frequent.
Fertiliser and agro-chemical dispatch (Kalol)
Bagged product leaves in seasonal peaks, truck after truck, often into the evening, and each load must match its dispatch note.
Our setup: A 60 MT, 16 m deck with the unmanned option (RFID, cameras, boom barrier), so late dispatches are weighed and logged without an operator.
- Chhatral GIDCsteel tubes and pipes, chemicals, pharma and engineering
- Kalol GIDC (Gandhinagar)engineering, plastics and chemicals
- Private estates along Chhatral roadengineering, fittings and fabrication units
Long tubes, fine dust: plan the deck for both.
Tubes and pipes are made by the metre but bought and sold by the tonne, so the weighbridge is the check between the mill's length-based production and the weight on the invoice. Shorter lengths ride on trucks; 12 m lengths come and go on trailers, and the deck must hold every axle at once. Chemical units ship fine powders in bags and drums: dust settles in the gaps around a deck, so sealed IP67/IP68 load cells and a drained surround keep the electronics clean, and a concrete (RCC) deck is worth asking about where wash-down is frequent. Units on the busy highway side should leave room for a truck to queue off the road before it weighs.
| Recommended for | Vehicles | Capacity | Deck | Type |
|---|---|---|---|---|
| Steel tube / pipe maker | Trailers with 12 m lengths, multi-axle trucks | 60–80 MT | 18 m | Pit-less steel |
| Chemical unit | Drum and bag trucks, 2–3 axle | 40 MT | 12 m | Concrete (RCC) or pit-less steel |
| Engineering / fittings unit | Pick-ups to 2-axle trucks | 30 MT | 9 m | Pit-less steel |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From rig length to a stamped lot slip.
Six steps for your project in Chhatral GIDC. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in Chhatral GIDCTell us the heaviest vehicle you weigh (here, typically trailers with 12 m lengths, multi-axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (steel tube / pipe maker): 60–80 MT, 18 m deck, Pit-less steel. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the deck arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationDeck placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Chhatral and Kalol questions.
Who makes weighbridges for Chhatral GIDC?
Which weighbridge suits a tube or pipe manufacturer?
Chemical powder dust settles everywhere. Will it affect the weighbridge?
How soon can you install in Chhatral GIDC?
How much does a weighbridge cost in Chhatral GIDC?
छत्राल GIDC में पाइप और ट्यूब उद्योग के लिए कौन-सा धर्म कांटा उपयुक्त है?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
