
Santej weighbridges for shared parks and small sheds.
Santej in Kalol taluka has grown into a belt of plotted industrial parks along the Santej–Vadsar road: sheds for engineering, fabrication, plastics and packaging units, plus godowns for steel, cement and building material. Many units here are new, small and share a park with their neighbours, and that changes how a weighbridge, truck scale or dharam kanta is chosen.
For an industrial park in Santej where several units share one weighbridge, a 60 MT truck scale with a 16 m deck covers most trucks; a single small unit can use 30–40 MT on a 9–12 m deck, and a building-material godown 40–60 MT. Symphony builds it in Ahmedabad, with Legal Metrology stamping support.
Many tenants, one bridge: every slip on record.
- One bridge, many unitsNumbered SMFW slips and records, so every unit's weighments can be traced and answered from the log.
- Placed before the sheds fillPlanned early, the deck and its approaches sit where trucks never block the park road.
- Modular if you may moveA bolt-together modular deck can be shifted when the unit moves to a bigger shed.
Who needs one in Santej: Engineering and fabrication sheds, plastics moulding and packaging, small chemical and food units, trading godowns for steel, cement and building material, and construction suppliers serving new housing and road projects.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Vadsar, Rakanpur, Khatraj.
Parks, plastics and godowns.
Industrial park associations
One shared weighbridge serves many tenants, each with its own buyers, suppliers and paperwork.
Our setup: A 60 MT, 16 m pit-less deck with numbered SMFW slips and a stored record, so any tenant's query is answered from the log.
Plastics and packaging units
Granules come in by the bag and rolls and cartons go out in light, bulky loads, where a few hundred kilos decide the bill.
Our setup: A 30–40 MT, 9–12 m deck: sized to light, bulky loads, with a printed slip for every dispatch.
Building-material and steel godowns
Cement, steel and aggregate move in and out of godowns and are sold to contractors by weight.
Our setup: A 40–60 MT, 12–16 m pit-less deck with a printed slip for every contractor load.
- Santej–Vadsar road industrial parksengineering, fabrication, plastics and packaging
- Kalol GIDC (Gandhinagar)engineering, plastics and chemicals
- Chhatral GIDCsteel tubes, chemicals and engineering
Place the bridge before the sheds fill.
In a plotted park the weighbridge is often a shared facility: the park association or one owner installs it, and every unit weighs there. That means more customers, more slips and more questions, so a stamped Class III bridge with numbered SMFW slips keeps every weighment traceable. Park roads and plots are usually laid out before anyone plans a weighbridge, so fix its place early: trucks should enter, weigh and leave without blocking the main park road. On a single small plot, a short pit-less deck sized to your own trucks saves space and money, and a modular deck can move with you if the business shifts to a bigger shed.
| Recommended for | Vehicles | Capacity | Deck | Type |
|---|---|---|---|---|
| Shared park weighbridge | Pick-ups to multi-axle trucks | 60 MT | 16 m | Pit-less steel |
| Building-material godown | Tippers, 2–3 axle trucks | 40–60 MT | 12–16 m | Pit-less steel |
| Single small unit | Pick-ups, 2-axle trucks | 30–40 MT | 9–12 m | Modular or pit-less steel |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From park layout to the first shared slip.
Six steps for your project in Santej. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in SantejTell us the heaviest vehicle you weigh (here, typically pick-ups to multi-axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (shared park weighbridge): 60 MT, 16 m deck, Pit-less steel. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the deck arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationDeck placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Santej industrial park questions.
Who supplies weighbridges in Santej?
Our industrial park wants one weighbridge for all units. What size?
Can a small unit start with a short or modular weighbridge?
How soon can you install in Santej?
How much does a weighbridge cost in Santej?
सांतेज के औद्योगिक पार्क में साझा धर्म कांटा कैसे स्थापित करें?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
