Changodar weighbridges for pharma, steel and warehouses.
Changodar is a busy industrial belt on the Sarkhej–Bavla highway, with pharma plants, steel units and highway warehouses. We have installed weighbridges here, on plots where every metre between the gate and the loading bay counts.
For a Changodar factory or warehouse, a 60 MT pit-less weighbridge with a 16–18 m deck covers multi-axle trucks. Symphony builds it in its Ahmedabad workshop, has installed weighbridges in Changodar, and dispatches about 2 weeks after a commercially cleared order with PO.
Tight plots, wet monsoons: we have built here before.
- Pit or pit-less, both builtWe build both types, so the choice follows your plot, not our catalogue.
- Installed here alreadyWe have installed weighbridges in Changodar, so we know the plots, the approach roads and the monsoon drainage.
- Ready for trade weighingLegal Metrology stamping support at installation, and calibration before each annual re-verification.
Who needs one in Changodar: Pharma and chemical units, engineering and fabrication, plastics and packaging, food processing, and the warehouses along the Ahmedabad–Bavla highway.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Moraiya, Bavla, Sarkhej, Matoda.
Pharma, steel and highway warehouses.
Pharma and chemical units
Tankers and drums of solvents and intermediates; spills and wash-downs around the deck.
Our setup: A 60 MT concrete (RCC) deck that resists corrosion, with sealed IP67/IP68 load cells.
Engineering and fabrication
Steel in, fabricated structures out, often on long trailers.
Our setup: An 18 m pit-less deck of 60–80 MT so long loads are weighed in one go.
Highway warehouses
Many trucks a day and billing by weight, on tight plots.
Our setup: A pit-type deck flush with the road where space is short, with unmanned weighing for night shifts.
- Changodar industrial areapharma, engineering, plastics and packaging
- Moraiyaengineering units and warehousing
- Bavlaengineering, food processing and warehousing
- Sanand GIDCautomobile plants and component makers
Tight plot? A pit-type deck fits.
Changodar plots are often tight, with the weighbridge squeezed between the gate and the loading bay. Where there is no room for ramps, a pit-type deck sits flush with the road, with a drained pit and sump; where there is room, a pit-less deck on concrete pedestals is simpler and stays dry in the monsoon. Either way, plan the truck path first: the deck must sit where trucks can drive straight on and straight off.
| Recommended for | Vehicles | Capacity | Deck | Type |
|---|---|---|---|---|
| Pharma / chemical unit | Tankers, multi-axle trucks | 60 MT | 16–18 m | Pit-less, RCC deck |
| Engineering / fabrication | Trailers, trucks | 60–80 MT | 18 m | Pit-less steel |
| Warehouse on the highway | Multi-axle trucks | 60 MT | 16–18 m | Pit-type (tight plots) or pit-less |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From truck path to installation.
Six steps for your project in Changodar. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in ChangodarTell us the heaviest vehicle you weigh (here, typically tankers, multi-axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (pharma / chemical unit): 60 MT, 16–18 m deck, Pit-less, RCC deck. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type deck needs a drained pit with a sump. We can check the levels before the deck arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationDeck placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Changodar questions, answered.
Who makes weighbridges near Changodar?
My plot is tight. Which weighbridge fits?
How fast is service in Changodar?
How soon can you install?
How much does a weighbridge cost in Changodar?
चांगोदर में धर्म कांटा कौन लगाता है?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.