
Miyani GIDC weighbridge, drawn into the first factory layout.
GIDC advertisements in 2024 and 2025 invited applications for industrial plots at Miyani in Porbandar district, under a general scheme for non-chemical industry. An applicant sketching a first factory layout can ask Symphony to include a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) before the building plan is frozen.
Small processing or storage units served by pickups and light trucks can plan 30 to 40 MT on 7.5 to 9 m. Units expecting ten-wheel and larger rigid trucks should look at 50 to 60 MT on 12 to 16 m. Add bench or platform scales for small lots. Select Class III accuracy, IP68/IP69K load cells and SMFW software, and budget roughly 2 weeks for dispatch once a purchase order is commercially cleared.
Coastal ground and damp air reward early planning.
- Draw it earlyPlace the lane on the application layout.
- Stay above waterRaised platforms are easier to inspect.
- Dry the electronicsClosed cabin with backup power.
Who needs one in Miyani GIDC: Miyani village stands on a creek on the Arabian Sea coast and is described as a fishing centre. A non-chemical estate plot there could host many kinds of work, and the weighing need follows the cargo, not the address. Ice and chilled consignments call for quick turnaround. Dry packed goods need ticket details that match invoices. Building materials arriving during construction need a net weight long before the first product leaves the shed.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.
Ice, cartons, building sand: weigh what you pay for.
Supplying ice to a landing point
Weight falls as delivery is delayed.
Our setup: Suggested: print time and net weight at exit so both sides see the same starting figure.
Moving packed products
Cartons look identical even when one is short.
Our setup: Suggested: check truck net weight against the packing total before sealing documents.
Building the factory itself
Sand and aggregate bills begin before sales do.
Our setup: Suggested: install early where the layout allows and weigh each construction load.
- Miyani (Porbandar)listed in GIDC application advertisements for general, non-chemical industrial plots
Test the soil, keep water moving.
Begin with the application drawing. Show the weighing platform, operator cabin, waiting space and exit as parts of the factory layout, so that the fire access, loading dock and storm-water drains do not later compete for the same strip. Creek-side and coastal ground may be soft or hold water close to the surface; a soil test tells the civil engineer whether ordinary footings are enough. A raised, pit-less arrangement keeps load cells out of standing water and lets you look underneath, while a pit design should be chosen only with a dependable way to empty it. Orient the platform so that rain driven off the roof does not pour on to the approach. If wet cargo drips on to it, set the fall of the apron to carry water away and hose off residue the same day. Moist sea air also reaches the cabin: keep the indicator, computer and printer in a closed room with backed-up power, and store slip rolls in a sealed box. Protect the signal cable from vehicle wheels, rodents and digging by laying it in conduit along a recorded route. Finally, put the verification date in your calendar. A machine used for commercial weighing is stamped by the Legal Metrology officer before first use, re-verified when due and again after repair or movement.
| Recommended for | Vehicles | Capacity | Length | Note |
|---|---|---|---|---|
| Chilled or ice supply | Light trucks | 30 MT | 7.5 m | Drain meltwater off the apron |
| Packed non-chemical goods | Medium rigid trucks | 40 MT | 9 m | Invoice number on slip |
| Growing factory | Ten-wheel trucks | 50–60 MT | 12–16 m | Reserve space ahead of expansion |
| Construction phase receipts | Tippers | 40–50 MT | 9–12 m | File tickets by supplier |
| Temporary layout | Short rigid trucks | 30–40 MT | 7.5–9 m | Modular type, hard flat base |
| Crates and small lots | Hand trolleys | Platform scale | Indoor size | Wipe dry after use |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
Application drawing to first printed slip.
Six steps for your project in Miyani GIDC. For foundation-based models, curing takes time, so the drawing comes first.
- 1 · Your traffic in Miyani GIDCTell us the heaviest vehicle you weigh (for example, light trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (chilled or ice supply): 30 MT, 7.5 m weighbridge; drain meltwater off the apron. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Small units and wet ground: applicants ask.
Do we need the plot allotted before asking for a design?
Is a weighbridge necessary for a small unit?
What happens if water collects below the platform?
Can the slip show crate counts and party names?
Can the machine run without an operator?
What support follows supply?
How is the price decided for a Miyani estate plot?
मियाणी औद्योगिक क्षेत्र के नए प्लॉट के लिए धर्म कांटा की योजना कैसे बनाएँ?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
