Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Porbandar · Gujarat

Porbandar weighbridges for stone, fish and soda ash.

Porbandar lives on the sea and on stone: its fishing harbour lands catch for seafood processors, a large soda ash plant and the Ranavav cement works draw limestone from the district, and quarries cut the cream-coloured Porbandar stone used in buildings across Gujarat. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा) across Porbandar, Ranavav, Kutiyana and Madhavpur.

Quick answer

For a Porbandar stone or limestone quarry, a 60–80 MT weighbridge with a 12–16 m concrete (RCC) deck takes loaded tippers and block trucks; a seafood processor at the harbour needs a 30–40 MT, 9–12 m RCC deck with drains, because melt water and salt air corrode bare steel. Symphony builds it in Ahmedabad.

Why Symphony in Porbandar

Limestone, fish and groundnut are all sold by weight.

  • Made for salt airConcrete (RCC) and steel-cum-RCC decks with sealed IP67/IP68 load cells for harbour and coastal yards, with a 25-year structural warranty on the RCC concrete (terms apply).
  • Heavy tippers, shift after shiftA 60–80 MT concrete (RCC) deck on a firm foundation takes the impact of loaded quarry tippers every day.
  • Proven on bulk gatesSambhar Salts in Rajasthan runs 3 × 100 MT steel-cum-RCC weighbridges from Symphony; the same build suits cement and soda ash gates.

Who needs one in Porbandar: The fishing harbour, ice plants and seafood processing units, soda ash and chemical production, cement and clinker at Ranavav, limestone and Porbandar stone quarries, groundnut farming and the market yard, GIDC industrial units, and cargo at Porbandar port.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Ranavav, Kutiyana, Madhavpur, Bokhira, Navibandar.

Get a quotation

Who we build for in Porbandar

Quarries, the harbour and the market yard.

Porbandar stone and limestone quarries

Stone and limestone are sold by the tipper load, and loaded tippers hit the deck hard on rough quarry roads.

Our setup: A 60–80 MT, 12–16 m concrete (RCC) deck on a firm foundation, with a dust-sealed indicator cabin.

Harbour and seafood processors

Catch is traded by weight between boats, agents and processors, and melt water and brine drip on the deck all day.

Our setup: A 30–40 MT, 9–12 m concrete (RCC) deck with a fall and drains, washed down every shift.

Groundnut traders and the market yard

After the kharif harvest, farmers bring groundnut on tractors and trucks, and the trader pays on the stamped net weight.

Our setup: A 40–60 MT, 12–16 m pit-less deck, stamped for trade, with SMFW numbered slips.

Industrial areas we serve near Porbandar
  • Porbandar GIDCsmall industrial and processing units
  • Porbandar fishing harbourfish landing, ice plants and seafood processing
  • Ranavav cement and limestone beltcement, clinker and limestone quarrying
Advice for Porbandar sites

Brine on the deck, dust in the cabin: plan for the coast.

Porbandar sits on the Arabian Sea, so salt air reaches every yard; for harbour, seafood and soda ash sites, a concrete (RCC) or steel-cum-RCC deck with sealed IP67/IP68 load cells and well-painted steel parts lasts longer. At the harbour, fish trucks drip melt water and brine, so the deck needs a fall and a drain, and the surround should be washed down so salt does not build up in the deck gap. Quarries cut Porbandar stone and limestone and load heavy tippers and block trucks on rough approaches; a 60–80 MT concrete (RCC) deck on a firm foundation takes the impact of loaded tippers, and a dust-sealed indicator cabin keeps the electronics clean. Cement and soda ash plants receive limestone and dispatch bulk and bagged product round the clock, so 80–100 MT on an 18 m deck with the unmanned option (RFID, cameras, boom barrier) suits their gates. Boats stay in harbour during the monsoon fishing ban, so plan the order and civil work to finish before fishing reopens.

Recommended forVehiclesCapacityDeckType
Stone / limestone quarryTippers, block trucks60–80 MT12–16 mConcrete (RCC)
Fishing harbour, seafood processorInsulated trucks, pick-ups30–40 MT9–12 mConcrete (RCC) with drains
Cement / soda ash plant gateBulkers, trailers, trucks80–100 MT18 mSteel-cum-RCC, unmanned option
Groundnut trader, market yardTractors, trucks40–60 MT12–16 mPit-less steel

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Porbandar

From the quarry face to the stamped slip.

Six steps for your project in Porbandar. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in PorbandarTell us the heaviest vehicle you weigh (here, typically tippers, block trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (stone / limestone quarry): 60–80 MT, 12–16 m deck, Concrete (RCC). The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the deck arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationDeck placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Stone, fish and cement: Porbandar questions.

Who supplies weighbridges in Porbandar and Ranavav?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges across Porbandar, Ranavav, Kutiyana and Madhavpur, with Legal Metrology stamping support.
Which weighbridge suits a Porbandar stone quarry?
A 60–80 MT weighbridge with a 12–16 m concrete (RCC) deck on a firm foundation, stamped for trade. It takes loaded tippers and block trucks, and SMFW prints a numbered slip with gross, tare and net for every load sold.
Can a weighbridge at the fishing harbour resist salt water?
Yes, if it is built for it: a concrete (RCC) deck with a fall and drains, sealed IP67/IP68 load cells, a raised junction box and a closed indicator cabin. Wash the deck and the gap down every shift so salt and fish water do not build up.
What does a cement or soda ash plant gate need?
Usually 80–100 MT on an 18 m steel-cum-RCC deck for bulkers and trailers, with the unmanned option: RFID tags, cameras and a boom barrier with SMFW, so the gate weighs round the clock and keeps a photo of every trip.
How much does a weighbridge cost in Porbandar?
It depends on capacity, deck length and type, the foundation, the corrosion protection a coastal site needs, and the electronics. A 30–40 MT, 9–12 m deck for a seafood unit costs far less than an 18 m, 100 MT deck for a cement or soda ash gate. Send your heaviest vehicle, the site details and the daily truck count; an engineer replies within one working day.
पोरबंदर में पत्थर खदान के लिए कौन सा धर्म कांटा उपयुक्त है?
भरे हुए टिपर और ब्लॉक ट्रकों के लिए 60–80 टन, 12–16 मीटर का कंक्रीट (RCC) धर्म कांटा उपयुक्त है, जिसे मज़बूत नींव पर स्थापित किया जाता है। सिम्फनी 1998 से धर्म कांटे बनाता है और स्टैम्पिंग सपोर्ट देता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com