
Singrauli weighbridges for the coal tippers, the ash yards and the brick kilns.
Singrauli, around Waidhan and Morwa on the Madhya Pradesh side of the Rihand reservoir, is among the busiest coal and power belts in India. The open-cast mines of Northern Coalfields (Jayant, Nigahi, Dudhichua, Amlohri, Khadia, Bina and Kakri) send out coal by rake and by truck; the power stations of the Vindhyachal, Sasan, Mahan and Nigrie complexes burn it and give back ash; and between them run overburden contractors, coal transporters, ash-brick makers, stone crushers, sand suppliers and the fuel, tyre and spare-part trade that keeps tipper fleets moving. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Singrauli district.
For coal transporters and road-sale lifting agents at Jayant, Nigahi, Amlohri and Dudhichua, the usual weighbridge is 100 MT over 18 m in concrete (RCC) or pit-less steel, built around the axle load of a loaded tipper rather than the headline tonnage, with SMFW storing every truck's tare and printing slips by vehicle, party and material. Ash-brick units and ash lifters near the power plants take 60–80 MT over 16 m; sand and stone suppliers 80–100 MT over 18 m; and a public dharam kanta on the Waidhan or Morwa road normally 60–100 MT over 16–18 m. Rice mills and traders at the Singrauli and Deosar mandis are served by 40–60 MT over 12–16 m. Orders are made in Ahmedabad and dispatched about 2 weeks after a commercially cleared order with PO.
Coal, ash and stone that move through three shifts: why a Singrauli weighbridge is built to run without a pause.
- Coal tippers cross the platform in three shifts100 MT, 18 m, concrete (RCC) or pit-less steel, built to the loaded tipper's axle load; SMFW stored tares and slips by vehicle, party and material.
- Black coal dust and fine abrasive fly ashLoad cells sealed to IP68/IP69K, a sealed junction box, drained approaches and a platform that can be washed down.
- Hard coal-measure rock close beneath the soilShallow footings on the rock, deeper ones on valley soil, and approaches that drain.
Who needs one in Singrauli: Coal transporters, tipper owners and road-sale lifting agents serving the Northern Coalfields mines at Jayant, Nigahi, Dudhichua, Amlohri, Khadia and Bina; overburden and mine-support contractors; ash and fly-ash handlers and fly-ash brick makers around the Vindhyachal, Sasan, Mahan and Nigrie power complexes; stone crushers and sand suppliers; bulker and cement-carrier operators; steel, cement and building-material stockists at Waidhan and Morwa; fuel, tyre and spare-part dealers for the heavy fleets; rice mills and grain traders at the Deosar and Chitrangi mandi yards; godown owners and public dharam kanta operators on the Waidhan, Morwa and Sarai roads.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Waidhan, Morwa, Deosar, Chitrangi, Sarai, Vindhyanagar.
Coal lifters, ash handlers and crushers across Singrauli district.
Coal transporters and lifting agents
Coal from the open-cast mines leaves in a steady stream of tippers, each weighed at the loading point and again at the buyer's gate, and a disputed slip costs a day's profit.
Our setup: A 100 MT, 18 m platform in concrete (RCC) or pit-less steel, designed to the loaded tipper's axle load; SMFW with stored truck tares and slips by vehicle, party and material; optional remote display and boom barrier.
Fly-ash brick units and ash lifters
Ash from the power complexes is lifted by bulker and tipper and turned into bricks, and the fine, abrasive, damp dust works into every joint.
Our setup: A 60–80 MT, 16 m platform with a sealed junction box, load cells sealed to IP68/IP69K, drained approaches and a surface that can be washed down.
Stone crushers and sand suppliers
Laden tippers carry boulders, grit and sand across the platform, and the sharp dust scours a steel surface.
Our setup: A concrete (RCC) surface on an 18 m platform rated 80–100 MT, with SMFW slips listing material, buyer and vehicle.
- Waidhanthe Northern Coalfields headquarters town, coal transporters, steel and cement stockists, repair garages and the fuel and tyre trade
- Morwa and the Jayant and Nigahi mining beltlifting agents, tipper owners, overburden and mine-support contractors
- Vindhyachal, Sasan and Mahan power complexesash handlers, fly-ash brick makers, bulker operators, material suppliers
- Deosar and Chitrangirice mills, grain traders, the mandi yards, sand and stone suppliers
- Sarai and Vindhyanagarbuilding-material yards, transport depots, godowns
- The Waidhan, Morwa and Sarai roadspublic weighbridge operators, coal and ash carriers, cement and steel transporters
Hard rock under the dust, valley soil by the reservoir: founding a weighbridge in Singrauli.
Singrauli is a belt where a weighbridge works three shifts and is cleaned of black dust each morning. A coal transporter or lifting agent may pass several hundred tippers across one platform in a week, and a slip that disagrees with the loading point costs real money, so the platform has to clear a vehicle quickly and keep a record that survives an audit. For that work 100 MT on 18 m in concrete (RCC), or pit-less steel where the surface is protected, is built around the loaded tipper's axle load; the RCC platform carries a 25-year structural warranty (T&C apply), and IP68/IP69K sealed load cells and a sealed junction box keep coal dust and monsoon water out. SMFW holds the tare of each regular truck, records material and party for every load, and can add a remote display, a boom barrier or an unmanned RFID lane for a gate that runs through the night. Fly-ash brick makers and ash lifters have a different problem: fine, abrasive, moisture-holding dust. They use 60–80 MT over 16 m, with approaches that drain and a platform that can be washed. Hard sandstone and coal-measure rock lie close under the surface in the mining country, so footings stay shallow there; on the valley soils beside the Rihand and the Son they go deeper and the approaches are drained. The foundation drawing needs only a yard photograph and the weight of the heaviest tipper.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Coal transporter or road-sale lifting agent at Jayant, Nigahi, Amlohri or Dudhichua | Laden 10-, 12- and 14-wheel coal tippers | 100 MT | 18 m | RCC top or pit-less steel, stamped |
| Overburden or mine-support contractor | Road-going heavy tippers and water tankers | 80–100 MT | 18 m | RCC top, stamped |
| Fly-ash brick maker or ash lifter around the power complexes | Bulkers, tippers and trucks of ash and bricks | 60–80 MT | 16 m | Pit-less steel or RCC, stamped |
| Stone crusher or sand supplier | Laden tippers of grit, boulders and sand | 80–100 MT | 18 m | RCC top, stamped |
| Rice mill or grain trader at the Deosar or Chitrangi mandi | Tractor-trolleys, pick-ups, 10-wheel lorries | 40–60 MT | 12–16 m | Pit-less steel, stamped |
| Public dharam kanta on the Waidhan, Morwa or Sarai road | Tippers, trailers, lorries and tractors | 60–100 MT | 16–18 m | Pit-less steel or RCC, stamped (dharam kanta) |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From the loading-point drawing at Nigahi to the first stamped tipper: how a Singrauli order is delivered.
Six steps for your project in Singrauli. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in SingrauliTell us the heaviest vehicle you weigh (here, typically laden 10-, 12- and 14-wheel coal tippers), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (coal transporter or road-sale lifting agent at Jayant, Nigahi, Amlohri or Dudhichua): 100 MT, 18 m weighbridge, RCC top or pit-less steel, stamped. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Singrauli's coal transporters, ash-brick makers and crusher owners.
Who supplies weighbridges in Singrauli?
Which weighbridge suits a coal transporter or a lifting agent in Singrauli?
Which weighbridge suits a fly-ash brick unit or a stone crusher in Singrauli?
How long does a Singrauli weighbridge take to arrive?
What decides the cost of a weighbridge in Singrauli?
सिंगरौली में कोयला ट्रांसपोर्ट, फ्लाई ऐश ईंट इकाई या क्रशर के लिए धर्म कांटा स्थापित करते समय किन बातों का ध्यान रखें?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
