Unai GIDC · Gujarat

Unai GIDC weighbridge, planned for monsoon mud.

Unai is a Navsari district village known for its hot water springs and the Unai Mata temple, and GIDC lists an estate under the same name. Unit holders, sawmill owners, brick and sand suppliers and farm produce buyers can ask Symphony for a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) planned for wet ground and mixed traffic.

Quick answer

For a yard serving tractor trolleys and two-axle lorries, 30 MT on 10 m is a sensible first example, once you have measured the full length of the tractor and trolley. Where multi-axle tippers or timber lorries call, look at 40 to 60 MT on 12 to 16 m. The longest combination and its registered gross weight settle the choice. Pair it with IP68/IP69K rated load cells, an indicator of accuracy Class III and our SMFW weighment software. Allow about 2 weeks for dispatch once your PO is commercially cleared; we guide you through stamping.

Why Symphony in Unai GIDC

Wood, bricks, farm loads: one platform, honest slips.

  • Walk it in the rainSite level and drainage are easiest to judge in the monsoon.
  • Zero before tradeA clean, empty platform at opening protects every ticket.
  • Date the woodMoisture makes the weighing time part of the bargain.

Who needs one in Unai GIDC: State highways link the village with Waghai, Saputara, Dharampur and Chikhli, and the Bilimora to Waghai narrow gauge line passes through. A small estate yard here may see a tractor trolley, a six-wheel lorry and a loaded tipper on the same morning. If you deal in timber, remember that fresh wood carries water, so its weight on arrival and its weight after weeks in the stack will not match. Agree with sellers which weighment settles the bill and write the date and time on every slip.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Unai GIDC

Logs, building supply, produce: three yard routines.

Buying logs and poles

Volume estimates invite argument.

Our setup: Suggested: loaded and empty weighment, with the seller's name and the time on the slip.

Supplying building sites

Customers question short loads.

Our setup: Suggested: remote display facing the driver and a printed net weight for each trip.

Collecting farm produce

Many small sellers arrive close together.

Our setup: Suggested: seller codes in SMFW and a day-end report for payment.

Industrial areas we serve near Unai GIDC
  • Unaia Navsari district village; GIDC lists an estate under the same name
Advice for Unai GIDC sites

Read the rainwater before marking the foundation.

Choose the spot after watching one heavy shower. Note where water runs, where it stands and which way a loaded vehicle slides on soft soil. Raise the finished level above the flood mark, give the foundation an outlet and pave a short apron at both ends so that tyres arrive without a coat of clay. Mud is a weighing problem as much as a housekeeping one: soil left on the platform shifts the zero reading, and soil packed under it or in the side gaps can stop it moving freely, so weights, including any net worked from a stored tare, may be wrong. Fix a morning routine in which the operator looks underneath, clears the gaps and confirms that the display shows zero before the first truck. A steel platform set in a shallow pit needs the same attention to drainage; an above-ground pit-less layout is easier to inspect but takes more length because of its ramps. Long loads need their own rule. Logs, poles or bamboo that overhang the body are still weighed through the wheels, so every axle must stand on the platform while nothing touches a wall, rail or stack beside it. Keep stored material well clear of the edges. Rural supply can dip, so provide backup power for the indicator, computer and printer, along with proper earthing and surge protection against lightning. Seal cable joints, raise the junction box and keep rodents out of the duct. Before any trade use the weighbridge needs Legal Metrology verification, then re-verification when due and after repair or a change of location.

Recommended forVehiclesCapacityLengthNote
Tractor with one trolleyFarm and sand loads20–30 MT10 mBoth units fully on the platform
Timber and pole lorriesOverhanging loads40 MT12 mClear space beyond both sides
Brick and block dealerTwo-axle lorries30 MT9 mSell by counted load or weight
Sand and metal tippersMulti-axle60 MT12–16 mWater must drain from the load area
Estate unit with packed goodsLight lorries30 MT7.5–9 mCompact layout beside the gate
Seasonal collection yardMixed vehicles40 MT9 mModular on level concrete

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Unai GIDC

From a rainy-day survey to the first slip.

Six steps for your project in Unai GIDC. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in Unai GIDCTell us the heaviest vehicle you weigh (for example, farm and sand loads), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (tractor with one trolley): 20–30 MT, 10 m weighbridge; both units fully on the platform. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Trolleys, timber and mud: Unai yards ask.

Which platform length suits tractor trolleys at Unai?
About 10 m takes a tractor with one trolley. Two trolleys in train need far more, so measure the whole combination first.
Does wet timber change the weight we pay for?
Yes. Water in fresh wood is weighed along with the wood, so agree in advance on the weighing stage and any moisture terms.
How do we stop mud affecting readings?
Pave the approaches, clean beneath the platform and check zero each morning and after heavy rain.
Can a farm produce buyer print a slip for the seller?
SMFW software prints numbered weighment slips with vehicle number, gross, tare, net, date and time.
What if we shift to another plot later?
Choose the modular type if a move looks likely: with no foundation to cast, it goes up in a few hours on a hard, level surface such as a concrete floor, then needs fresh verification at the new plot.
What is the warranty?
One year on the weighbridge. Steel-cum-RCC construction adds a 25-year structural warranty on the RCC concrete, with terms and conditions.
What decides the price of a weighbridge for an Unai yard?
Capacity, platform length, soil and drainage work, pit or ramps, cabin, power backup, display and software. Send a plot photo on WhatsApp +91 63525 86656 or call +91 94092 42100.
उनाई क्षेत्र की लकड़ी या ईंट की इकाई के लिए वेब्रिज लगाने से पहले क्या देखें?
सबसे लंबा वाहन, उसका सकल भार, वर्षा के पानी की निकासी, पक्का पहुँच मार्ग और बिजली की वैकल्पिक व्यवस्था पहले तय करें। सिम्फनी 1998 से वेब्रिज निर्माता है और स्टैम्पिंग में सहयोग देती है। कॉल: +91 94092 42100, व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com