Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Bardoli · Gujarat

Bardoli weighbridges for cane yards, kilns and produce.

Bardoli is a sugarcane town of Surat district, remembered for the Bardoli Satyagraha of 1928. Every winter, cane from Bardoli and Valod talukas goes to the cooperative sugar factories of the area; banana and vegetables leave for the Surat market; brick kilns and building-material yards supply a growing town; and weaving units work in the Kadodara–Palsana belt. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा) across Bardoli taluka and Valod.

Quick answer

A sugar factory cane yard around Bardoli usually needs 60 MT, 16–18 m pit-less weighbridges (dharam kanta), often two or more so loaded and empty vehicles weigh on separate platforms, with RFID for harvest trucks that return several times a day; a banana or vegetable trader 30–40 MT on 9–12 m; a brick kiln or building-material yard 60 MT on 16 m in concrete (RCC). Symphony builds them in Ahmedabad and dispatches them about 2 weeks after a cleared order with PO.

Why Symphony in Bardoli

Cane loses sugar after cutting, so weigh it fast and print the time.

  • Time on every cane slipDate and time printed for the cutting programme.
  • RFID for harvest trucksRepeat trucks cross without manual entry.
  • By-products billed tooBagasse, molasses and press mud each get a numbered slip.

Who needs one in Bardoli: Cooperative sugar factories and their cane yards, with bagasse, molasses and press mud leaving the factory; sugarcane, banana, paddy and vegetable farming and the traders who buy the produce; brick kilns, sand, grit and building-material suppliers; ready-mix concrete for new housing; and weaving and texturising units in the Kadodara–Palsana belt.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Valod, Kadodara, Palsana.

Get a quotation

Who we build for in Bardoli

Cane yards, banana traders, brick kilns across Bardoli taluka.

Sugar factory cane yards

Every vehicle crosses twice in a long season, and growers are paid on net weight.

Our setup: Two or more 60 MT, 16–18 m pit-less weighbridges with RFID, a boom barrier and time-stamped SMFW slips.

Banana and vegetable traders

Produce goes to market the same day, mostly on tempos and small trucks.

Our setup: A 30–40 MT, 9–12 m pit-less weighbridge on raised pedestals, quick to weigh and easy on the budget.

Brick kilns and building-material yards

Heavy, wet tippers and tractor-trolleys load clay, bricks, sand and grit.

Our setup: A 60 MT, 16 m concrete (RCC) weighbridge, with a 25-year structural warranty on the RCC (T&C).

Industrial areas we serve near Bardoli
  • Cooperative sugar factories of the Bardoli areasugarcane crushing, sugar, bagasse and molasses
  • Brick kilns and sand yards of Bardoli talukabricks, sand and grit for construction
  • Banana and vegetable trade of Bardoli talukaproduce for the Surat market
Advice for Bardoli sites

Time-stamped cane slips, raised pedestals: a weighbridge for the crushing season.

Around Bardoli the cane yard is a factory gate that runs day and night for months. From the start of crushing in early winter until the last cane in spring, harvest trucks and tractor-trolleys bring cane from the fields to a planned cutting programme, and the factory pays each grower on net weight. Cane begins to lose weight and sugar soon after it is cut, so the yard should weigh it without delay and print the date and time on every SMFW slip, along with the grower code, village, vehicle, gross, tare and net. Two or more weighbridges side by side, one for loaded and one for empty vehicles, keep the queue short, and RFID tags with a boom barrier let the same harvest trucks cross several times a day without manual entry; check stored tares against a fresh empty weighing at regular intervals. The factory gate also sends out bagasse, molasses tankers and press mud, and each outward truck needs its own numbered slip for the buyer. Before crushing starts, have every weighbridge serviced and its Legal Metrology verification checked, so the season does not open with a weighbridge out of use; Symphony gives stamping support. Plots in this belt are low and get heavy monsoon rain, so use a pit-less weighbridge on raised pedestals, slope the approach ramps away from the platform, and choose sealed IP67/IP68 load cells. Brick kilns and sand yards load heavy tippers that leave water and mud on the platform; a concrete (RCC) weighbridge, with a 25-year structural warranty on the RCC (T&C), stands up well to that work.

Recommended forVehiclesCapacityWeighbridgeType
Sugar factory cane yardHarvest trucks, tractors with trolleys60 MT16–18 mPit-less steel, two or more, with RFID
Sugar factory dispatch (bagasse, molasses)Trucks, tankers60 MT16 mPit-less steel
Banana or vegetable traderBanana trucks and tempos for the Surat market30–40 MT9–12 mPit-less steel, raised clear of monsoon water
Brick kiln / building-material yardTippers, tractor-trolleys60 MT16 mConcrete (RCC)

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Bardoli

Cane office to stamping support: a Bardoli weighbridge, season ready.

Six steps for your project in Bardoli. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in BardoliTell us the heaviest vehicle you weigh (here, typically harvest trucks, tractors with trolleys), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (sugar factory cane yard): 60 MT, 16–18 m weighbridge, Pit-less steel, two or more, with RFID. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Questions from Bardoli's cane and building trade.

Who supplies weighbridges in Bardoli?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges across Bardoli taluka and Valod, for sugar factory cane yards, banana and vegetable traders, brick kilns and building-material yards, with Legal Metrology stamping support.
How many weighbridges does a sugar factory cane yard need?
It depends on the daily crushing and the number of vehicles. Every vehicle crosses twice, loaded and empty, so many yards run two or more weighbridges: one for loaded vehicles and one for empty ones. SMFW links the two weighments by slip number or RFID tag, and the cane office can print each grower's deliveries from the reports.
Why should a cane yard print the time on every weighbridge slip?
Cane starts to lose weight and sugar after it is cut, so the factory wants it weighed and crushed without delay. A time on every slip shows how long each load waited in the yard, helps the cane office plan the cutting programme, and answers a grower's question about when the load was weighed.
बारडोली में ईंट भट्ठे के लिए धर्म कांटा कैसा होना चाहिए?
ईंट भट्ठे और रेत-गिट्टी के यार्ड में भारी टिपर और ट्रैक्टर-ट्रॉली आते हैं, जो प्लेटफॉर्म पर पानी और मिट्टी छोड़ते हैं। ऐसे कार्य के लिए 60 टन क्षमता और 16 मीटर लंबाई वाला कंक्रीट (RCC) धर्म कांटा उपयुक्त है, जिसके RCC कंक्रीट पर 25 वर्ष की स्ट्रक्चरल वारंटी (नियम व शर्तें लागू) मिलती है। व्यापारिक उपयोग से पहले लीगल मेट्रोलॉजी सत्यापन कराएँ; सिम्फनी स्टैम्पिंग सपोर्ट देता है।
What decides the cost of a weighbridge in Bardoli?
The number of weighbridges a cane yard needs, capacity (30–40 MT for a produce trader, 60 MT for a cane yard or brick kiln), length (9–12 m, 16 m or 18 m), the type (pit-less steel or concrete (RCC)), raised pedestals for the monsoon, the software and options such as RFID, cameras and a boom barrier. Send your longest vehicle, the daily truck count and photos of the plot; an engineer replies within one working day.
बारडोली में चीनी मिल के खोई (बगास) और शीरा (मोलासेस) डिस्पैच के लिए धर्म कांटा क्यों आवश्यक है?
पेराई के साथ खोई, शीरा और प्रेस मड भी बेचे जाते हैं, और प्रत्येक खरीदार अपने ट्रक या टैंकर की क्रमांकित पर्ची चाहता है। 60 टन क्षमता और 16 मीटर लंबाई वाला पिट-लेस धर्म कांटा इस डिस्पैच के लिए उपयुक्त है। सिम्फनी 1998 से धर्म कांटे बनाता है और स्टैम्पिंग सपोर्ट देता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com