
Aji GIDC weighbridges for metal works.
Aji GIDC is one of the two main industrial estates named in Rajkot's district profile, with forging and machine tool units among its engineering works. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for the metal that moves through such works. Pig iron, scrap, round bar and billets come in; castings, forgings and machined parts go out; turnings, risers and rejects travel back for re-melting or sale. Each of those streams is priced by weight, and each is easy to lose sight of when a shed is busy. A weighbridge at the gate gives the stores clerk, the melter and the accounts desk one shared figure, written at the moment the vehicle was there, instead of three estimates made later from memory.
For an Aji GIDC forging or engineering unit receiving rigid trucks of scrap and bar, a 60 MT weighbridge, 12 to 16 m long, is a sound starting point. Steel stockists unloading multi-axle trailers should plan 80 to 100 MT over 16 to 18 m. Where the plot is tight, check the turning path before fixing the length. Specify IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, and stamping support is provided.
Charge, castings and returns: one weight record for all.
- Guard the signal pathEarthed conduit and no welding current through the platform protect every reading.
- Never tip onto the plateCharge and scrap belong in the yard; shock loads shorten the life of load cells.
- Account for returnsBorings, risers and rejects deserve tickets of their own, since they carry value.
Who needs one in Aji GIDC: Weighbridges suit forging shops, machine tool makers, foundries, fabricators, steel and scrap stockists and the transporters who carry their loads.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Rajkot.
Foundries, forges and stockists: platforms matched to metal.
Foundries
Melt yield cannot be judged if the charge and the castings were never weighed on one system.
Our setup: Suggested: 60 MT on 14 m with grade-wise charge tickets.
Forging and fabrication works
Bar arrives by weight and leaves as parts, with end pieces in between.
Our setup: Suggested: 60 MT on 12–14 m with separate offcut entries.
Steel and scrap stockists
Long trailers and mixed lots invite argument over every tonne.
Our setup: Suggested: 80 MT on 16–18 m with signed gross and tare slips.
- Aji GIDCforging, machine tool and engineering units, Rajkot
- Rajkotthe city of which Aji and Bhaktinagar are described as the two main estates
Tight yards and electrical noise: installing for an engineering estate.
In a working engineering yard, space for a weighbridge is not always planned in advance. Walk it with a tape before anything else. Note the gate width, the position of the transformer, the place where scrap is tipped and the strip that cranes or forklifts cross all day. The platform needs a straight, level lead-in so that no wheel is still turning or braking when the weight is recorded. If forklifts use the same ground, mark a separate lane for them; repeated crossing at the edge loads the structure in a way it was not laid out for. Metal work brings its own hazards to weighing electronics. Electric furnaces, induction heaters and large motors can disturb poorly routed signals, so keep load cell cable in earthed conduit and away from heavy power runs. Welding return current must never pass through the platform or the load cells. Sharp scrap should not be dropped from a magnet or grab onto the steel plate: the impact travels straight into the cells. Swarf and cutting oil collect in the gap and under the structure, so plan a way to sweep and wash that area, with drainage that does not carry oil across the neighbour's boundary. At month end the value of a good record shows. In SMFW keep distinct names for pig iron, scrap grades, bar stock, finished castings and returned borings. Take gross and tare on the same platform wherever possible. Give job-work challans the ticket number, so that material sent out for machining can be traced when it returns lighter. Decide who may correct an entry and review those corrections weekly. If a shop later wants weighments without a person at the window, RFID identification, cameras and a boom barrier can be added to the same installation. Set the display where a driver and the yard supervisor can both read it, and check zero before the first load. Keep the verification certificate in the cabin and note its due date on the maintenance board, so that re-verification with the Legal Metrology office is arranged in good time.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Foundry | Scrap and pig iron in, castings out | 60 MT | 14–16 m | heavy girders, with no dropping of charge |
| Forging shop | Billets and bar, dense short loads | 60 MT | 12–14 m | Level lead-in, protected cable |
| Steel stockist | Long sections on multi-axle trailers | 80–100 MT | 16–18 m | Straight run on both ends |
| Scrap dealer | Mixed grades, frequent tare checks | 60–80 MT | 16 m | Fresh tare for each lot |
| Machine tool parts | Smaller consignments by rigid truck | 40 MT | 10–12 m | Check the marked scale interval |
| Weighing for others | Varied vehicles through the day | 80 MT | 16 m | Clear display and numbered slips |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From yard walk to first stamped slip: planning the installation.
Six steps for your project in Aji GIDC. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in Aji GIDCTell us the heaviest vehicle you weigh (here, typically scrap and pig iron in, castings out), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (foundry): 60 MT, 14–16 m weighbridge, heavy girders, with no dropping of charge. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Aji engineering works.
Who makes weighbridges for forging and engineering units at Aji GIDC?
Will furnaces and motors disturb the reading?
Our yard is narrow. Which build fits?
Can one ticket system follow job work?
When can installation be planned?
What warranty is given?
What affects the price of a weighbridge for an engineering unit?
आजी जीआईडीसी की इंजीनियरिंग इकाई में वेब्रिज की रीडिंग विश्वसनीय कैसे रखें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
