Chhatar-Mitana GIDC weighbridges for small units.

Chhatar-Mitana is a GIDC estate in Tankara taluka of Morbi district, where the corporation has offered plots under MSME and General categories. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) to entrepreneurs who are setting up or already running a unit on such a plot.

Quick answer

A small unit on a Chhatar-Mitana plot that receives rigid trucks is usually well served by a 40 to 60 MT weighbridge, 10 to 16 m long. A unit that expects multi-axle trailers should plan 80 MT over 16 to 18 m. Where permanent foundation work is not possible, ask about a modular platform on a hard, level surface such as concrete. Choose IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, and we assist with Legal Metrology stamping.

Why Symphony in Chhatar-Mitana GIDC

Thin margins, small plot: when owning the weighing pays off.

  • Buy for the longest regular truckPlatform length follows the wheelbase that actually visits, with a margin you can justify.
  • Plan the extras earlyConduit, earthing, drain and cabin cost far less when cast with the yard.
  • One tidy registerConsistent party and material names make monthly totals usable.

Who needs one in Chhatar-Mitana GIDC: Weighbridges suit micro and small manufacturers, job-work shops, packaging and moulding units, engineering workshops, traders of industrial inputs and the carriers that serve them.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Tankara, Morbi.

Get a quotation

Who we build for in Chhatar-Mitana GIDC

Makers, job workers and traders: a size that fits each plot.

New small manufacturers

Cash is tight, and every unchecked delivery eats into a thin margin.

Our setup: Suggested: 40 MT on 10–12 m, laid out so the gate stays usable.

Job-work and engineering shops

Material goes out for processing and comes back lighter; the difference must be explained.

Our setup: Suggested: 60 MT on 14 m with outward and return tickets under one party name.

Traders of industrial inputs

Buyers question the quantity once the truck has already left.

Our setup: Suggested: 60 MT on 16 m with a signed copy of each slip.

Industrial areas we serve near Chhatar-Mitana GIDC
  • Chhatar-Mitana GIDCsmall-enterprise and general industrial plots, Tankara taluka
  • Tankarataluka headquarters in Morbi district
Advice for Chhatar-Mitana GIDC sites

One gate, one strip of ground: laying out a compact weighbridge.

A first factory is usually built on a tight budget and a fixed footprint, so every square metre given to weighing has to earn its place. The question here is rarely about the largest platform available. It is whether one unit should own a weighbridge, which length its own suppliers actually need, and where it can stand without choking the only gate. Getting those three answers on paper before the compound wall goes up saves an owner from rebuilding a ramp, shifting a cabin or sending loaded vehicles elsewhere to be weighed for years afterwards. On a modest industrial plot the weighbridge competes with parking, storage and the loading bay for the same strip of ground. Start with the single longest vehicle that will realistically enter, draw its turning arc from the road gate, and see where a straight stretch remains. That stretch, with level run-up at both ends, is the candidate. If none exists, consider placing the platform along a side boundary with a second wicket for the exit, or share one approach between weighing and unloading in a fixed order. A shorter platform saves land and civil cost, yet it is a false economy if even one regular supplier arrives in a vehicle whose wheelbase will not fit, because a truck weighed in two halves is not an acceptable trade weighment. Owners buying their first weighbridge should also budget for the items around it: an engineered foundation (or, for a modular weighbridge, a hard, level surface such as concrete), a small cabin or a desk by an existing window, earthing, a steady power point with battery backup and a drain that carries rain away from the steel. Ask the civil contractor to cast cable conduit before the yard is surfaced, since cutting finished concrete later is messy and weakens the apron. In SMFW, begin with a short, clean list of parties and materials; a register with three spellings of one supplier is hard to total at the month end. Print the slip at the cabin window and keep the saved record, so a vehicle number or date can be searched when a bill is queried. A one-person shift can manage if the indicator and a repeater can be read from where the weighman sits. As the unit grows, RFID tags, cameras and a boom barrier can be discussed for unattended entry without changing the platform itself. Finally, decide who may cancel or edit a ticket, and keep that authority with one named person. Clean the gap around the plate each week, check zero before the first truck, and arrange re-verification with the Legal Metrology office before the current stamp lapses.

Recommended forVehiclesCapacityWeighbridgeType
First manufacturing unitLimited plot, a few trucks a day40 MT10–12 mCompact layout, slip at the cabin window
Polymer or packaging unitLight cargo with high volume per vehicle40–50 MT12–14 mZero check before each shift
Engineering workshopPlate, bar and finished assemblies60 MT14–16 mSturdy girders, guide rails
Industrial input traderMixed suppliers and repeat buyers60 MT16 mParty and material lists kept clean
Unit expecting trailersLong vehicles from outside suppliers80 MT16–18 mStraight lead-in on both ends
Rented shedPermanent civil work not allowed40 MT10–12 mModular platform on a hard level surface

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Chhatar-Mitana GIDC

From plot sketch to verified slip: six stages for a small unit.

Six steps for your project in Chhatar-Mitana GIDC. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in Chhatar-Mitana GIDCTell us the heaviest vehicle you weigh (here, typically limited plot, a few trucks a day), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (first manufacturing unit): 40 MT, 10–12 m weighbridge, Compact layout, slip at the cabin window. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Questions for first-time buyers at Chhatar-Mitana.

Who supplies weighbridges for small units at Chhatar-Mitana GIDC?
Symphony Weighing Leader, the brand of S.M.F. Enterprise in Ahmedabad, is a licensed weighbridge manufacturer with Legal Metrology model approval. It can supply platforms with sealed load cells, a Class III indicator and SMFW software for industrial plots in this estate.
Is it worth owning a weighbridge for a few trucks a day?
Add up what you now spend: trips to an outside weighbridge, waiting time, and differences you accept because you cannot check them. If purchases or sales are settled by weight, even a modest daily count can justify your own platform. If not, wait until the volume arrives.
Can two neighbouring units share one weighbridge?
They can, by written agreement. Settle who owns it, who pays for verification and repair, who operates it and whose name appears on the slip. Separate party entries keep each unit’s tickets apart, and the platform should stand where both gates can reach it without reversing across the road.
What is the smallest platform that still takes our trucks?
Measure the distance from the first axle to the last on the longest vehicle you accept, then add working clearance at both ends. Send us that figure and the loaded weight, and we will propose a capacity and length from our 7 to 18 m range.
How soon can the platform arrive after ordering?
Dispatch is about 2 weeks from a commercially cleared order with PO. Start any foundation work as soon as you receive the drawing and allow full curing time; fix the power point and cabin position early so installation and verification can follow.
What warranty applies?
The weighbridge carries a 1-year warranty. A steel-cum-RCC platform also carries a 25-year structural warranty on the RCC concrete, subject to its terms and conditions.
What documents should we keep after installation?
Keep the invoice, the verification certificate with its due date, the calibration record, and a note of every repair. File them with the cabin copy of the user instructions, so an inspector, auditor or new weighman can see the history at once.
What decides the price of a weighbridge for a Chhatar-Mitana plot?
Length, capacity, steel or steel-cum-RCC build, the civil work your ground needs and any automation. For a quotation, WhatsApp a plot sketch to +91 63525 86656 or call +91 94092 42100.
छत्तर-मिताणा जीआईडीसी की नई लघु इकाई को वेब्रिज कब स्थापित करना चाहिए?
जब खरीद या बिक्री का भुगतान वज़न पर आधारित हो और बाहर तौल कराने में नियमित रूप से समय और धन व्यय हो रहा हो, तब अपना वेब्रिज उपयोगी रहता है। परिसर का नक्शा बनाते समय ही स्थान तय करें। वर्ष 1998 से वेब्रिज निर्माता एस.एम.एफ. एंटरप्राइज़ सत्यापन में सहयोग करती है। संपर्क: +91 94092 42100; व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com