Jambudiya-Paneli weighbridges for tile plants.
The Jambudiya-Paneli Ceramic Park is a GIDC project being developed in Morbi district for the ceramic industry. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) to ceramic promoters planning kilns, body-preparation sections and tile warehouses on new plots.
A tile plant in the Jambudiya-Paneli Ceramic Park should plan an 80 to 100 MT weighbridge over 16 to 18 m, because raw material arrives in heavy tippers and trailers. A small frit, glaze or carton unit receiving rigid trucks can use 50 to 60 MT over 12 to 16 m. A steel-cum-RCC surface copes well with abrasive spillage. Use IP68/IP69K load cells and SMFW. Dispatch is about 2 weeks from a commercially cleared PO, with Legal Metrology stamping support.
Clay in, tiles out: weighing belongs in the plant drawing.
- Weigh inward and outwardRaw material, fuel and tiles all cross one planned route with a printed record.
- Built for wet clay and dustPaved aprons, drainage and cleaning access protect the reading.
- Plan with the kiln layoutThe base, cabin and conduit are cast along with the rest of the works.
Who needs one in Jambudiya-Paneli Ceramic Park: Weighbridges suit floor, wall and vitrified tile makers, sanitaryware units, body-clay and feldspar suppliers, frit and glaze makers, fuel handlers, carton makers and tile transporters.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Morbi.
Body mills, tile godowns and frit units: matched capacity and surface.
Tile body preparation
Loose minerals are paid by the tonne and carry water you cannot see.
Our setup: Suggested: 100 MT on 18 m, steel-cum-RCC, ticket number copied to the lab sheet.
Finished-tile godowns
A trailer short by one pallet looks full from the cabin.
Our setup: Suggested: 80 MT on 18 m with box-count comparison before the gate pass.
Frit, glaze and ink-room suppliers
Costly inputs arrive in bags where small shortages add up.
Our setup: Suggested: 60 MT on 14 m with the delivery challan filed against each slip.
- Jambudiya-Paneli Ceramic ParkGIDC park being developed for ceramic industry, Morbi district
- Morbiceramic centre and district headquarters
Wet clay and white dust: siting a ceramic-works weighbridge.
A tile works is a weighing business long before it is a selling business. Clay, feldspar, silica and other body materials come in loose and damp, glazes and frits arrive in bags, solid fuel may come by the truckload, and fired tiles leave packed in boxes where a few missing pallets are hard to spot by eye. A promoter drawing a new works has the rare chance to put weighing into the master layout: one platform sized for the heaviest tipper and trailer, placed so that every inward and outward vehicle crosses it, with records that the stores, accounts and dispatch teams can all use. Draw the material flow before choosing the spot. Raw-material bays normally sit at one end of a ceramic plot and the finished-goods godown at the other, and the weighbridge belongs on the link between them and the road gate. If inward tippers and outward tile trailers must share one platform, paint a waiting line for each direction and give the weighman a signal lamp or barrier so that only one vehicle moves at a time. Large plants with heavy traffic sometimes justify two platforms, one for receiving and one for dispatch; decide this early, because the second base is much easier to cast with the first. Damp clay is the particular nuisance here. It drops from tyres and tailboards, smears the plate, fills the side gap and dries into a hard crust that shifts the zero and can restrict free movement of the platform. Provide a paved apron on both approaches, a drain channel, access to sweep beneath the platform and a daily scraping duty. Wash water should run away from the load cell seats, never toward them. Fine white dust from milling and spray-drying settles on everything, so keep the cabin closed, the printer covered and the junction box sealed. Moisture matters commercially as well: the weighbridge records the weight delivered, while the laboratory states how much of it is water, so enter the ticket number on the lab sheet and settle on dry weight only where the purchase order says so. For fuel receipts, weigh the vehicle full and empty at your own gate instead of relying on a stored tare. For tile dispatch, compare the net weight with the expected figure from box count and box weight before the gate pass is signed; a gap is a prompt to recount. Protect electronics with proper earthing, surge arrestors and battery backup, and route cables away from kiln heat and conveyor motors. RFID tags, camera snapshots and a boom barrier suit a plant that receives material through the night with limited gate staff.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Body-material receiving | Damp, loose clay and minerals in tippers | 80–100 MT | 16–18 m | Steel-cum-RCC top, daily scraping |
| Fired-tile dispatch | Dense boxed loads on trailers | 80–100 MT | 18 m | Net weight checked against box count |
| Solid-fuel receipt | High-value loose cargo | 80 MT | 18 m | Fresh full and empty weighment |
| Frit and glaze unit | Bagged chemicals and finished frit | 50–60 MT | 14–16 m | Dry, closed cabin and batch reference on file |
| Carton and pallet supplier | Bulky packing in rigid trucks | 50 MT | 12–14 m | Quick ticketing at one window |
| Twin receiving and dispatch gates | Continuous traffic both ways | 100 MT | 18 m each | Two platforms, one set of material names |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From civil drawing to first raw-material truck: six steps.
Six steps for your project in Jambudiya-Paneli Ceramic Park. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in Jambudiya-Paneli Ceramic ParkTell us the heaviest vehicle you weigh (here, typically damp, loose clay and minerals in tippers), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (body-material receiving): 80–100 MT, 16–18 m weighbridge, Steel-cum-RCC top, daily scraping. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions to settle before casting the base.
Who supplies weighbridges to the Jambudiya-Paneli Ceramic Park?
Which platform surface suits clay and mineral trucks?
One long platform or two weighbridges?
How do we handle moisture deductions on clay?
Can weighing continue through night shifts?
When should a promoter order the weighbridge?
Should the weighbridge ticket carry the tile grade or size?
What decides the cost of a weighbridge for a ceramic plot?
जांबुडिया-पानेली सिरामिक पार्क के टाइल प्लांट में गीली मिट्टी की सही तौल कैसे सुनिश्चित करें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.