Dhrub GIDC weighbridge, sound from foundation to slip.
Dhrub GIDC is an industrial estate within the village limit of Dhrub in Mundra taluka, Kutch. Plot holders there, whether in storage, fabrication, vehicle repair or goods transport, can come to Symphony for a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) and understand what goes under it before they buy.
A storage yard receiving long trailers should look at 80 MT on 18 m, or 100 MT where special heavy loads and their axle drawing call for it. Fabrication or workshop plots served by rigid trucks may need 40 to 60 MT on 9 to 16 m. Insist on IP68/IP69K sealed load cells, a Class III weight indicator and SMFW to hold the records. Expect dispatch in about 2 weeks from a commercially cleared PO, and ask us for stamping support.
Know what sits underneath before you sign the order.
- Know the partsLoad cells, cables and junction box need access.
- Soil report firstFoundation design follows what the ground can bear.
- Protect the sensorsDisconnect and bond correctly before any welding.
Who needs one in Dhrub GIDC: GIDC's price list for 2026-27 carries Dhrub among its Kutch estates. A plot used for storage or handling has a plain commercial need: what came in, what left, for whom and on which vehicle. A weighbridge answers it only when the structure, the sensors and the record keeping are all chosen for the heaviest visitor and the dampest week of the year.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.
Storage, steel, transport: three proofs of weight.
Holding goods for others
Stock claims need evidence on both sides.
Our setup: Suggested: inward and outward slips linked by lot number and owner code.
Receiving steel for fabrication
Invoice weight may differ from delivered weight.
Our setup: Suggested: compare net weight with the supplier challan before unloading papers are signed.
Running a transport yard
Unrecorded loading raises overload risk.
Our setup: Suggested: weigh each loaded truck and review gross weight before it leaves.
- Dhruba Mundra taluka village with a GIDC industrial estate listed among Kutch estates
Test the soil, then protect the sensors.
Under the steel or concrete surface, load cells carry every vehicle, and their cables meet in a junction box that feeds the indicator in the cabin. Know where each part sits. In a pit-type layout the foundation walls form a chamber that needs a drain, edges protected against falling rubble and safe access for inspection. A pit-less layout sets the structure above ground between ramps, so water and dirt are easier to see and clear. Choose after the soil investigation, not before it: made ground and soft or saline soil may call for a deeper or wider foundation than a neighbour used. For coastal conditions in Kutch, ask about surface preparation and paint, use sealed glands, keep the junction box off the floor of any pit and inspect fixings on a calendar. Run cables in conduit away from power lines and rodent runs. Never weld on the structure with load cells or electronics connected unless the supplier's precautions are followed, because welding current can destroy a sensor. Provide a separate earth, lightning surge protection and a backup supply. After civil work cures, test loading and Legal Metrology verification come before the first commercial ticket. Record who changed any setting, keep the certificate on file and repeat verification when due, after repair and after relocation.
| Recommended for | Vehicles | Capacity | Length | Note |
|---|---|---|---|---|
| Storage and handling plot | Long trailers | 80 MT | 18 m | Owner code on each ticket |
| Heavy plant or coil movement | Low-bed and multi-axle | 100 MT | 18 m | Check axle loads and length on the drawing |
| Fabrication unit | Rigid trucks | 40–60 MT | 9–16 m | No welding with cells connected |
| Vehicle workshop yard | Chassis and trucks | 40 MT | 9 m | Dry route to the cabin |
| Empty-vehicle checking | Mixed fleet | 60 MT | 16 m | Fresh tare against stored tare |
| Short-lease stockyard | Goods trucks | 40 MT | 9 m | Modular on level concrete |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
Soil study to verified ticket, in sequence.
Six steps for your project in Dhrub GIDC. For foundation-based models, curing takes time, so the drawing comes first.
- 1 · Your traffic in Dhrub GIDCTell us the heaviest vehicle you weigh (for example, long trailers), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (storage and handling plot): 80 MT, 18 m weighbridge; owner code on each ticket. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Pits, sensors and tare: estate users ask.
Pit-type or pit-less for a Dhrub plot?
How many load cells are used?
Can the same weighbridge serve several storage customers?
How often should stored tare weights be refreshed?
Who verifies the weighbridge?
Is there a structural warranty?
How is the price of a weighbridge for Dhrub GIDC decided?
ध्रब जीआईडीसी के गोदाम के लिए वेब्रिज में किन बातों पर ध्यान दें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.