
Diu weighbridges for the fish harbour, hotels and public works.
Diu is the island district of the Union Territory of Dadra and Nagar Haveli and Daman and Diu, on the southern coast of Saurashtra, with the village of Ghoghla on the mainland. Its economy rests on fishing, with the harbour at Vanakbara, and on tourism around the Portuguese-era fort, the beaches of Nagoa and Ghoghla and the town's hotels. Building material for hotels and public works, fish and ice, and the town's municipal waste all move by truck. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा) across Diu district.
A fish trader or ice plant in Diu usually needs a 30–40 MT, 9–12 m concrete (RCC) weighbridge with sealed load cells; a building-material supplier or contractor 40–60 MT on 12–16 m; a public works or municipal waste site 40–60 MT on 12–16 m with SMFW reports; a public weighbridge 60 MT on 16 m (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.
Concrete (RCC) weighbridges that do not rust in Diu's salt air.
- Built for salt airConcrete (RCC) weighbridges and sealed IP67/IP68 load cells for the coast.
- Sized for island plotsLength chosen for your longest vehicle and the turning space you have.
- Records for public buyersSMFW reports, and GeM supply experience (Central Railway, Bhusawal).
Who needs one in Diu: Fish landing and fish traders at Vanakbara, with ice plants and cold storage; hotels, resorts and construction contractors; building-material suppliers (cement, sand, aggregate and steel); public works and government departments; municipal solid-waste handling; transporters.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Ghoghla, Vanakbara, Bucharwada, Nagoa, Fudam.
Fish traders, contractors and public works across Diu.
Fish traders and ice plants
Catch is sold by weight within hours, and melt water and salt attack steel and electronics.
Our setup: A 30–40 MT, 9–12 m concrete (RCC) weighbridge with sealed load cells, a drained surround and SMFW slips.
Hotel and public-works contractors
Cement, sand and aggregate arrive by tipper, and site bills are settled on the weighed quantity.
Our setup: A 40–60 MT, 12–16 m concrete (RCC) weighbridge with SMFW reports per supplier.
Municipal waste handling
Every compactor and tipper trip must be recorded for billing and audit.
Our setup: A 40–60 MT weighbridge with SMFW vehicle-wise daily reports and the unmanned option (RFID, cameras, boom barrier).
- Vanakbara fishing harbourfish landing, fish trade and ice
- Diu town and Ghoghlahotels, tourism, building material and public works
- Diu municipal areasolid-waste collection and civic works
Salt air, melt water and small plots: what a Diu weighbridge has to handle.
Salt air is the first thing to plan for in Diu. Steel close to the sea needs good surface preparation and paint, and a concrete (RCC) weighbridge, with no steel top to rust, suits the harbour and fish yards best; use sealed IP67/IP68 load cells and mount the junction box clear of wash water. At Vanakbara the catch moves on small trucks with ice, and melt water runs everywhere, so slope the surround to a drain and wash the platform with fresh water at the end of the day. Hotels and public works bring cement, sand and aggregate in tippers and trucks: 40–60 MT on 12–16 m covers them. Plots on the island are small and lanes are narrow, so measure the turning space as well as the longest vehicle before choosing the length, and keep a straight approach at both ends.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Fish trader or ice plant, Vanakbara | Small trucks, pickups with ice | 30–40 MT | 9–12 m | Concrete (RCC), sealed load cells, drained surround |
| Building-material supplier or contractor | Tippers, trucks | 40–60 MT | 12–16 m | Concrete (RCC) or coated pit-less steel |
| Public works or municipal waste site | Tippers, compactors, trucks | 40–60 MT | 12–16 m | Concrete (RCC), SMFW reports |
| Public weighbridge | Trucks, trailers | 60 MT | 16 m | Concrete (RCC) or coated pit-less steel, printed slip |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From the harbour yard to verified weighing: six steps in Diu.
Six steps for your project in Diu. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in DiuTell us the heaviest vehicle you weigh (here, typically small trucks, pickups with ice), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (fish trader or ice plant, Vanakbara): 30–40 MT, 9–12 m weighbridge, Concrete (RCC), sealed load cells, drained surround. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Diu's fish traders, contractors and offices.
Who supplies weighbridges in Diu?
Which weighbridge suits a fish trader or ice plant at Vanakbara?
Can a government office in Diu buy a Symphony weighbridge through GeM?
दीव में भवन निर्माण सामग्री के लिए कौन सा धर्म कांटा उपयुक्त है?
What decides the cost of a weighbridge in Diu?
दीव में मछली व्यापारी के लिए धर्म कांटा चुनते समय क्या ध्यान रखें?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
