Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Indranaj GIDC · Gujarat

Indranaj GIDC weighbridges for agro-food and MSME plants.

Indranaj GIDC is an industrial estate in Anand district whose plots are offered for general, MSME and agro-food industry. Where plots are compact and units handle food or agro produce, the weighbridge has to fit a tight yard and be easy to wash down and keep clean. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for processors and small plants at Indranaj GIDC.

Quick answer

For an agro-food or MSME unit at Indranaj GIDC a 60 MT, 16 m pit-less steel weighbridge is the usual start, with the display in a small roofed cabin at the gate. A compact plot with pickups and mini-trucks works at 40 MT on 12 m; a unit receiving full trailers of raw material or packaging moves to 60–80 MT on 16–18 m; and a tenant who may relocate can use a modular weighbridge on hard concrete. Once the PO is commercially cleared, the unit leaves the Ahmedabad works in about 2 weeks.

Why Symphony in Indranaj GIDC

Compact plots and wash-down: a weighbridge made for both.

  • Made for tight plotsThe platform and cabin are placed on your plan so loading bays and turning space stay free.
  • Washable and sealedClosed junction box, IP68/IP69K cells and a drained apron suit food and agro yards.
  • Slips by party and materialSMFW keeps raw material and finished goods separate and totals the day.

Who needs one in Indranaj GIDC: Typical weighbridge users: agro and food-processing units, MSME engineering and packaging plants, storage and logistics yards, and building-material suppliers.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Khambhat, Anand, Petlad.

Get a quotation

Who we build for in Indranaj GIDC

Processors, workshops and yards across Indranaj GIDC and its estate roads.

Agro-food processors

Produce lots are paid by weight and the yard is washed down often.

Our setup: Suggested: 60 MT, 16 m washable steel with sealed cells and a sloped apron.

MSME engineering workshops

Small trucks make many short trips on a compact plot.

Our setup: Suggested: 40 MT, 12 m low-profile steel with stamping support.

Storage and logistics yards

Mixed consignments need a slip for each party.

Our setup: Suggested: 60 MT, 16 m pit-less steel with party-wise SMFW slips.

Industrial areas we serve near Indranaj GIDC
  • Indranaj GIDC plots and estate roadsagro-food, MSME and general industrial units
  • Khambhattrading yards
  • Ananddistrict trade yards
  • Petladtrading yards
Advice for Indranaj GIDC sites

Wash-down, drains and turning space: siting an Indranaj weighbridge.

A processing plot can be smaller than a yard, so the weighbridge competes with loading bays, a gate and a turning circle for the same ground. Mark the truck's full path on the plot plan, from gate to platform to bay, and keep the platform on a straight line so that no truck has to turn while on it. Food and agro units want to rinse their yard, so choose a platform that tolerates washing: a closed junction box, sealed IP68/IP69K cells and cable glands pointing downward, with a sloped apron and a drain at each end so that wash water runs away from the cells instead of pooling under them. Raising the platform on pedestals makes it possible to flush and inspect underneath. Raw material and finished goods often move through the same gate, so SMFW can keep a tare for each regular truck and print a separate slip for each party and material. A plant that receives deliveries in the evening can add RFID tags, a camera post and a boom barrier so that known carriers are logged without a person in the cabin. The supply can dip when heavy machines start; a UPS, earthing and a surge arrestor protect the indicator. A food or agro bill rests on the slip, so the platform needs Legal Metrology verification before the first invoice and a fresh verification each year; our team supports the stamping. Food-grade yards also care about what the truck carries onto the platform: keep the approach swept, stop vehicles from dripping oil or syrup on the steel, and hose the platform down at a fixed hour so that a drained, dry platform is the normal state. A tenant in a shared shed or complex has little ground and many trucks, so decide early whether the weighbridge serves one unit or is shared by several and book each user under their own party name in SMFW. A plot plan is worth far more than a guess. Mark where forklifts cross the truck path, where pallets wait, and where the gate swings open, because a weighbridge that blocks a loading bay will be bypassed within a week. Also fix the order of work: platform and footing first, cabin and cabling next, SMFW and verification last, so that nothing is dug up twice. Send a plot plan and a gate photograph, and we sketch the platform, approaches and cabin on it before concrete is poured.

Recommended forVehiclesCapacityWeighbridgeType
Agro-food processorRaw produce in, packed goods out60 MT16 mWashable steel, closed junction box, sloped apron
Small MSME workshopPickups and mini-trucks in short trips40 MT12 mCompact steel platform, stamping support
Packaging or plastic plantFilm reels, pellets and cartons on long trailers60–80 MT16–18 mSteel or RCC frame, sealed IP68/IP69K cells
Storage and logistics yardMixed consignments in and out60 MT16 mPit-less steel, per-party SMFW slips
Tenant who may relocateLayout may change60 MT16 mModular on hard, level concrete, no foundation
After-hours receiving laneRegular carriers after hours60 MT16 mRFID reader, camera post and boom arm via SMFW

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Indranaj GIDC

From a plot plan to the first slip: an Indranaj GIDC weighbridge in six steps.

Six steps for your project in Indranaj GIDC. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in Indranaj GIDCTell us the heaviest vehicle you weigh (here, typically raw produce in, packed goods out), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (agro-food processor): 60 MT, 16 m weighbridge, Washable steel, closed junction box, sloped apron. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

What Indranaj GIDC plant and yard owners ask first.

Who supplies weighbridges at Indranaj GIDC?
Symphony Weighing Leader (S.M.F. Enterprise) is the supplier: steel platforms are made in its Ahmedabad works, SMFW goes in before dispatch, and the company has made weighbridges since 1998.
What size for a small plot?
A 40 MT, 12 m platform fits a compact plot with pickups; a 60 MT, 16 m platform suits most full trucks.
How do we handle wash-down?
Use a closed junction box and sealed IP68/IP69K cells, slope the apron to a drain at each end and raise the platform on pedestals.
Can a modular weighbridge be fitted?
Yes. No foundation is needed, so a tenant can set a modular weighbridge on hard, level concrete and take it along at the end of the lease.
Can raw material and goods be kept apart?
Yes. SMFW writes separate slips for raw material and finished goods, party by party, and gives a daily total.
Do slips need verification?
Yes. Verification under Legal Metrology precedes the first invoice and recurs every year; stamping support comes from us.
How should a food or agro yard clean the platform?
Hose the platform at a fixed hour, keep oil and syrup off the steel, and let the sloped apron carry the water to the drain; sealed cells and a closed junction box are made for this.
Can several tenants share one weighbridge?
Yes. Each tenant is booked under a separate party name in SMFW, so slips and day totals stay separate while the platform is shared.
What if the plot is too small for a 16 m platform?
Use a 12 m, 40 MT steel platform on a straight approach, or ask us to check the truck path on your plan before deciding.
Can finished goods and packaging materials use the same gate?
Yes. A single weighbridge at the gate can serve both directions; SMFW labels each weighment as inward raw material or outward product so that stock registers and invoices agree.
Does the cargo type change the weighing?
The weighing is the same. Keep the approach short and place the cabin so the driver need not leave the vehicle.
What should be ready before the platform arrives?
A levelled approach of one truck length on each side, drainage at both ends, a cabin spot with power and earthing, and the footing marks from our sketch.
What decides the cost of a weighbridge at Indranaj GIDC?
The quote depends on platform size, steel or RCC, footing and options like an RFID gate. Share your Indranaj plot plan on WhatsApp +91 63525 86656, or ring +91 94092 42100.
इंद्रनज जीआईडीसी में कृषि-खाद्य इकाई के लिए वेब्रिज कैसे चुनें?
यदि प्लॉट संकरा हो, तो गेट, प्लेटफ़ॉर्म और लोडिंग बे के बीच ट्रक का रास्ता पहले नक्शे पर खींचिए। धुलाई वाली इकाई के लिए बंद जंक्शन बॉक्स, सीलबंद लोड सेल और ढलान वाला एप्रन उपयुक्त रहता है। पूरे ट्रक वाली इकाई के लिए 60 टन, 16 मीटर का पिट-लेस स्टील वेब्रिज उचित है; पिकअप जैसे वाहनों के लिए 40 टन, 12 मीटर। सिम्फनी 1998 से इस क्षेत्र में है; सत्यापन में स्टाम्पिंग सहायता मिलती है। कॉल +91 94092 42100, व्हाट्सएप +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com