
Jalore weighbridges for granite blocks, slabs and tiles.
Jalore, below the fort on Swarnagiri hill, is known across India as Rajasthan's granite city. Quarries in the district's hills cut granite blocks, and a large cluster of cutting and polishing units in and around the town turns them into slabs and tiles for buyers in many states. Farm produce from the district's villages moves through the town's grain market, and Bhinmal and Ahore are busy trading towns of their own. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Jalore district.
A Jalore granite unit usually needs a 60–100 MT, 16–18 m pit-less weighbridge to weigh block trailers coming in and slab trucks going out; a quarry or block transporter 80–100 MT on 18 m; a public weighbridge in the granite area 80–100 MT on 18 m; a grain trader a stamped 40 MT, 12 m weighbridge (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.
Raised above the drifting sand, easy to keep clean.
- Built against drifting sandRaised pit-less design with an open gap under the platform that is easy to sweep.
- Advice for desert summersShaded cabin, UPS backup and sealed IP67/IP68 load cells.
- Two weighings, one recordSMFW ties each block trailer's gross and tare to one slip, in and out.
Who needs one in Jalore: Granite quarries and block traders; granite cutting, polishing and tile units in the RIICO industrial areas; slab and tile transporters; crushers using granite waste; grain and farm-produce traders; builders and building-material dealers; public dharam kanta operators on the main roads.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Bhinmal, Ahore, Sayla, Jaswantpura, Bagoda.
Granite units, quarries and traders across Jalore district.
Granite cutting and polishing units
Blocks come in by weight from the quarry, and slabs and tiles leave on trucks that the buyer pays freight for by weight.
Our setup: A 60–100 MT, 16–18 m pit-less steel weighbridge on raised pedestals, with SMFW slips for blocks in and slabs out.
Shared weighbridge in the granite area
Small units without their own weighbridge weigh at a common one, and both sides want a slip they can trust.
Our setup: An 80–100 MT, 18 m public weighbridge, stamped, with a printed slip for every vehicle.
Crushers using granite waste
Off-cuts and waste become aggregate, sold by the tipper load.
Our setup: A 60 MT, 16 m pit-less weighbridge, or a modular weighbridge on a hard, level concrete base that can move with the crusher.
- RIICO industrial areas, Jaloregranite cutting, polishing and tile units
- Granite quarries of Jalore districtraw granite blocks
- Bhinmalfarm-produce trade and processing
Sand, heat and heavy blocks: what a Jalore weighbridge has to handle.
Jalore's ground and weather set two rules. First, wind-blown sand: in the dry months fine sand and granite dust drift across open yards and settle in any hollow, so a pit soon fills and starts to touch the platform, which spoils the reading. A pit-less steel weighbridge on raised pedestals leaves an open gap under the platform that is easy to sweep; check it every week and clear it before every verification. Second, heat: summer temperatures in the district can pass 45 °C, so keep the indicator and the SMFW computer in a shaded cabin, give the cabin an inverter or UPS for power cuts, and use IP67/IP68 load cells with sealed cable glands against dust. Granite units handle blocks with cranes and forklifts, so keep all lifting off the platform and give the weighbridge a straight, level approach on both ends, so a block trailer drives on without braking hard on the platform.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Granite cutting and polishing unit | Block trailers in, slab and tile trucks out | 60–100 MT | 16–18 m | Pit-less steel on raised pedestals, girders for concentrated block loads |
| Quarry or block transporter | Multi-axle block trailers, tippers | 80–100 MT | 18 m | Pit-less steel or concrete (RCC), heavy duty |
| Public weighbridge in the granite area | All vehicles | 80–100 MT | 18 m | Pit-less steel or concrete (RCC), stamped |
| Grain and farm-produce trader | Tractor-trolleys, trucks | 40 MT | 12 m | Pit-less or pit-type, stamped for trade |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From granite yard plan to verified weighbridge: six steps in Jalore.
Six steps for your project in Jalore. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in JaloreTell us the heaviest vehicle you weigh (here, typically block trailers in, slab and tile trucks out), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (granite cutting and polishing unit): 60–100 MT, 16–18 m weighbridge, Pit-less steel on raised pedestals, girders for concentrated block loads. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Jalore's granite units, quarries and grain traders.
Who supplies weighbridges in Jalore?
Which weighbridge suits a granite unit in Jalore?
Pit-type or pit-less weighbridge for Jalore's sandy yards?
जालोर में ग्रेनाइट यूनिट के लिए कौन सा धर्म कांटा उपयुक्त है?
What decides the cost of a weighbridge in Jalore?
जालोर में सार्वजनिक धर्म कांटा व्यवसाय शुरू करने के लिए क्या आवश्यक है?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
