
Jhunjhunu weighbridges for mines, crushers and mustard.
Jhunjhunu district, in the Shekhawati region of northern Rajasthan, is known for the painted havelis of Mandawa and Nawalgarh and for the copper mines of the Khetri belt in its Aravalli hills. The sandy farms grow mustard, bajra, gram, guar and moong, traded through the Krishi Upaj Mandis of Jhunjhunu, Chirawa and Nawalgarh, and stone crushers on the Udaipurwati and Khetri side supply gitti and grit for roads and buildings. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Jhunjhunu district.
A Jhunjhunu, Chirawa or Nawalgarh mandi trader usually needs a 40–60 MT, 12–16 m pit-less steel weighbridge stamped for trade; a stone crusher 80–100 MT on 18 m in heavy-duty steel; a mine or ore transporter in the Khetri belt 80–100 MT on 18 m in heavy-duty steel or RCC; a public weighbridge 60–100 MT on 16–18 m (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.
Dense ore and stone in small heaps: a platform built for heavy axles.
- Ore and stoneHeavy loads in small heaps: 80–100 MT.
- Hills and plainsRock-cut base in the hills, compacted base on sand.
- Mustard lotsSlips by party and lot for oil mills.
Who needs one in Jhunjhunu: Mining contractors and mineral transporters in the Khetri copper belt; stone crushers producing gitti and grit on the Udaipurwati and Khetri side; mustard, bajra, gram and guar traders and commission agents at the Jhunjhunu, Chirawa and Nawalgarh mandis; oil mills; RIICO units at Jhunjhunu; building-material suppliers and transporters; public dharam kanta operators.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Chirawa, Nawalgarh, Khetri, Udaipurwati, Surajgarh, Buhana, Pilani, Mandawa.
Mines, crushers and mustard traders across Jhunjhunu district.
Mines and ore transporters in the Khetri belt
Ore is dense, so a tipper reaches its limit with a small heap, and every dispatch is billed by weight.
Our setup: An 80–100 MT, 18 m heavy-duty steel or RCC weighbridge with strong cross girders and the unmanned option.
Stone crushers on the Udaipurwati side
Gitti and grit leave in tippers all day in constant stone dust.
Our setup: An 80–100 MT, 18 m heavy-duty steel weighbridge with sealed IP67/IP68 load cells and a cleanable gap.
Mustard traders and oil mills
Mustard is sold by weight and oil content, so each lot's slip goes to both trader and mill.
Our setup: A 40–60 MT, 12–16 m stamped pit-less steel weighbridge with SMFW lot-wise gross, tare and net.
- RIICO Industrial Area, Jhunjhunumanufacturing and processing units
- Khetri copper beltcopper mining and ore transport
- Krishi Upaj Mandi, Jhunjhunumustard, bajra, gram and guar
- Chirawa mandimustard, bajra and gram
- Stone crushers, Udaipurwati and Khetri sidegitti and grit
Aravalli hills, sandy plains and Shekhawati heat: sizing a Jhunjhunu weighbridge.
Jhunjhunu district has two kinds of ground and two kinds of load. In the hills of the Khetri and Udaipurwati side, ore and stone are heavy for their volume, so a loaded tipper reaches its limit with a small heap; an 80–100 MT, 18 m heavy-duty platform with strong cross girders and sealed IP67/IP68 load cells stands up to that duty and to the dust, and rocky ground there may need rock cutting or a levelled base for the pedestals. On the sandy plains around Jhunjhunu, Chirawa and Surajgarh, mustard arrives from March and bajra and guar after the monsoon, in tractor-trolleys and 10-wheel trucks that a 12–16 m, 40–60 MT weighbridge handles; there the base must be well compacted and the approaches firm, so the platform stays level after the first season. Summers are very hot and winters cold, so shade the indicator cabin and keep cables away from the hot plate. Mustard goes to oil mills by weight and oil content, so the slip should carry the party and lot. Plan stamping and re-verification before the mustard season.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Mustard or grain trader | Trolleys, 10-wheel trucks | 40–60 MT | 12–16 m | Pit-less steel, stamped |
| Stone crusher (gitti, grit) | Tippers, 10- to 14-wheel trucks | 80–100 MT | 18 m | Heavy-duty steel, stamped |
| Mine or ore transporter | Tippers, multi-axle trucks | 80–100 MT | 18 m | Heavy-duty steel or RCC, stamped |
| Public weighbridge | Trolleys to multi-axle trucks | 60–100 MT | 16–18 m | Pit-less steel or RCC, stamped |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From the Khetri hills to the Chirawa mandi: six steps in Jhunjhunu.
Six steps for your project in Jhunjhunu. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in JhunjhunuTell us the heaviest vehicle you weigh (here, typically trolleys, 10-wheel trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (mustard or grain trader): 40–60 MT, 12–16 m weighbridge, Pit-less steel, stamped. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Jhunjhunu's mines, mandis and crushers.
Who supplies weighbridges in Jhunjhunu?
Which weighbridge suits a stone crusher or mine in the Khetri belt?
Which weighbridge suits a mustard trader in Jhunjhunu or Chirawa?
How long does a Jhunjhunu weighbridge take to arrive?
What decides the cost of a weighbridge in Jhunjhunu?
झुंझुनूं में स्टोन क्रशर या खदान के लिए धर्म कांटा कैसे चुनें?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
