Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Neemrana · Rajasthan

Neemrana weighbridges for factory gates, coil trailers and scrap.

Neemrana, on the Delhi–Jaipur highway (NH-48) in Kotputli-Behror district, is one of Rajasthan's largest manufacturing belts: the RIICO industrial areas at Neemrana, the Japanese Investment Zone at Majrakath, the Export Promotion Industrial Park (EPIP), Neemrana II, the Shahjahanpur industrial area and the newer Ghiloth industrial area hold automotive and auto-component plants, two-wheeler, air-conditioner and electrical-goods factories, steel service centres, metal pressing, packaging, plastics and food units, all on the Delhi–Mumbai Industrial Corridor. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा) for plants across the Neemrana, Shahjahanpur and Ghiloth belt.

Quick answer

A Neemrana factory gate usually needs a 60 MT, 18 m pit-less steel or concrete (RCC) weighbridge with the unmanned option (RFID, cameras, boom barrier), so loaded trailers of coils, components and finished goods are weighed without a second clerk; a steel service centre or logistics park 80–100 MT on 18 m; a scrap yard 40–60 MT on 12–16 m, stamped for trade (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.

Why Symphony in Neemrana

Steel in by the coil, scrap out by the kilo: one gate record for the whole plant.

  • Coils in, cartons outOne stamped record for inward steel and outward dispatch.
  • Scrap paid on your own weightA stamped slip for every scrap load that leaves the plant.
  • Unmanned gateRFID, cameras and boom barrier for night shifts.

Who needs one in Neemrana: Automotive and auto-component plants, two-wheeler and electrical-goods factories, steel service centres and metal pressing units, packaging, plastics and food units at RIICO Neemrana, the Japanese Zone, EPIP, Neemrana II, Shahjahanpur and Ghiloth; logistics parks and warehouses on NH-48; scrap buyers and recyclers who lift factory scrap; building-material suppliers for the plots under construction; transporters and public weighbridge operators on the highway.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Shahjahanpur, Ghiloth, Majrakath, Japanese Zone, EPIP Neemrana, Neemrana II.

Get a quotation

Who we build for in Neemrana

Auto plants, steel centres, logistics parks and scrap yards in Neemrana, Shahjahanpur and Ghiloth.

Auto and component plants

Coils and parts come in on 40-foot trailers against supplier invoices, and finished goods leave at night in two or three shifts.

Our setup: A 60 MT, 18 m pit-less steel or RCC weighbridge with the unmanned option (RFID, cameras, boom barrier) and SMFW shift reports.

Steel service centres and press shops

Full coil loads arrive by the trailer, and the scrap from slitting and pressing is sold by weight every week.

Our setup: An 80–100 MT, 18 m concrete (RCC) weighbridge, stamped, with separate SMFW records for inward coils and outward scrap.

Logistics parks and warehouses on NH-48

Multi-axle trailers and container trucks are loaded against the consignment note, and an overloaded axle costs a fine on the highway.

Our setup: An 80–100 MT, 18 m pit-less steel or RCC weighbridge with the unmanned option and slips that show gross, tare and net.

Industrial areas we serve in and around Neemrana
  • RIICO Neemrana industrial areaautomotive, auto-component, electrical-goods and engineering plants
  • Japanese Investment Zone, Majrakathautomotive, air-conditioner, electronics and component plants
  • Export Promotion Industrial Park (EPIP) and Neemrana IIexport-oriented manufacturing and engineering units
  • Shahjahanpur industrial area (RIICO)manufacturing and processing units
  • Ghiloth industrial area (RIICO)the newer manufacturing zone for Japanese and other plants
Advice for Neemrana sites

Trailer lengths, night shifts and highway dust: a weighbridge for a Neemrana plant.

A plant in Neemrana buys steel, aluminium, resin and packaging by the tonne and sells its scrap by the tonne, so the gate weighbridge earns its keep twice a day: inward, a loaded coil trailer or a truck of components is weighed against the supplier's invoice, and outward, the scrap that every press shop and machining line produces is sold on the kanta, where a few kilos on each load add up over a year. Legal Metrology requires a stamped weighbridge wherever the weight decides a payment, and that applies inside a factory as much as at a mandi, so the gate weighbridge should be stamped at installation and re-verified every year. Coils and long components arrive on 40-foot trailers, so 18 m is the right length for an auto or component plant, and 60 MT covers a legally loaded trailer; a steel service centre that receives full coil loads should go to 80–100 MT on 18 m in concrete (RCC). Most plants here run two or three shifts, and dispatch is often at night, so the unmanned option, with RFID tags on regular vehicles, cameras on the platform and a boom barrier, records every truck without a second clerk, and SMFW reports by party, material and shift go to stores and accounts. Plots in the RIICO estates are level and fenced, and the gate area is often tight, so a pit-type weighbridge flush with the road suits an existing gate where trailers must turn, while a pit-less weighbridge on pedestals is quicker to build on a new plot; a concrete apron on both approaches keeps the turning trailer off the kerb. The ground is mostly sandy loam, firm when compacted, so the pedestals and the apron go on a well-compacted base to our drawing. Summers pass 45 °C with dust storms in May and June, so shade the cabin, run the cables in closed conduits away from the hot plate and keep the junction box sealed. Logistics parks on NH-48 handle multi-axle trailers and containers, so 80–100 MT on 18 m is the usual choice there, and a scrap yard that buys from the plants needs 40–60 MT on 12–16 m, stamped, with a slip the plant's stores can file.

Recommended forVehiclesCapacityWeighbridgeType
Auto or component plant gateTrailers, 10- and 12-wheel trucks60 MT18 mPit-less steel or RCC, stamped, unmanned option
Steel service centre or metal pressing unitCoil trailers, 12-wheel trucks80–100 MT18 mConcrete (RCC), stamped
Logistics park or warehouse on NH-48Multi-axle trailers, container trucks80–100 MT18 mPit-less steel or RCC, unmanned option
Scrap yard or recyclerTrucks, pick-ups40–60 MT12–16 mPit-less steel, stamped

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Neemrana

From the EPIP gate to the first trailer slip: a Neemrana weighbridge in six steps.

Six steps for your project in Neemrana. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in NeemranaTell us the heaviest vehicle you weigh (here, typically trailers, 10- and 12-wheel trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (auto or component plant gate): 60 MT, 18 m weighbridge, Pit-less steel or RCC, stamped, unmanned option. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Questions from Neemrana's plant heads, stores and security teams.

Who supplies weighbridges in Neemrana?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges for plants in RIICO Neemrana, the Japanese Zone, EPIP, Neemrana II, Shahjahanpur and Ghiloth, with Legal Metrology stamping support.
Which weighbridge suits an auto or component plant gate in Neemrana?
A 60 MT, 18 m pit-less steel or concrete (RCC) weighbridge, so a loaded 40-foot trailer stands fully on the platform. Add the unmanned option (RFID, cameras, boom barrier) for night dispatch, and SMFW reports by party, material and shift for stores and accounts.
Should a factory weigh its own scrap?
Yes. Press-shop and machining scrap is sold by weight, and a stamped weighbridge at your own gate gives a figure you control for every load. Legal Metrology requires stamping wherever weight decides a payment, inside a factory as much as at a mandi; Symphony provides stamping support at installation and at the yearly re-verification.
Pit-type or pit-less at a tight gate in Neemrana?
Pit-type, flush with the road, where trailers must turn at an existing gate and there is no room for ramps; pit-less on pedestals where a new plot is being built, because it needs no pit, drains itself and is quicker to install. Both are stamped the same way; the foundation drawing comes with the offer.
What decides the cost of a weighbridge in Neemrana?
Capacity (40–60 MT for a scrap yard, 60 MT for a plant gate, 80–100 MT for a steel service centre or logistics park), length (12–18 m), the type (pit-less steel, pit-type or concrete (RCC)), the foundation and apron on compacted sandy loam, the cabin, and options such as the unmanned package with RFID, cameras and a boom barrier and SMFW shift reports. Send your heaviest trailer, the daily count and a photo of the gate; an engineer replies within one working day.
नीमराणा की फैक्ट्री के गेट के लिए कौन सा धर्म कांटा उपयुक्त है?
कॉइल, पुर्ज़े और तैयार माल ट्रेलरों में आते-जाते हैं, इसलिए प्लांट गेट के लिए 60 टन क्षमता और 18 मीटर लंबाई का पिटलेस स्टील या आरसीसी धर्म कांटा उपयुक्त है, जिसमें RFID, कैमरे और बूम बैरियर वाली अनमैन्ड (बिना ऑपरेटर) प्रणाली रात की शिफ्ट में भी हर ट्रक का रिकॉर्ड रखे। स्क्रैप की बिक्री वजन पर होती है, इसलिए लीगल मेट्रोलॉजी द्वारा सत्यापन (स्टैम्पिंग) आवश्यक है। सिम्फनी वर्ष 1998 से धर्म कांटों का निर्माण कर रही है और स्टैम्पिंग में सहायता प्रदान करती है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com