Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Bhiwadi · Rajasthan

Bhiwadi weighbridges for rolling mills, plant gates and logistics parks.

Bhiwadi, on the Rajasthan–Haryana border in Khairthal-Tijara district, is one of the state's largest industrial towns: the RIICO industrial areas of Bhiwadi Phase I to IV, Chopanki, Pathredi, Sare Khurd, Rampur Mundana, Karoli and Salarpur, with Khushkhera and Kahrani beyond them, hold steel rolling and re-rolling mills, induction furnaces, auto-component and two-wheeler-parts plants, ceramic-tile and glass works, cable, electrical, textile, pharmaceutical, food, paint, plastic and packaging units, and the warehouses that serve the National Capital Region. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा) for plants across the Bhiwadi belt.

Quick answer

A Bhiwadi factory gate usually needs a 60–80 MT, 18 m pit-less steel or pit-type weighbridge with the unmanned option (RFID, cameras, boom barrier), so trailers of coils, scrap, clay and finished goods are weighed through three shifts without a second clerk; a rolling mill or induction furnace 80–100 MT on 18 m in concrete (RCC); a scrap dealer or recycler 40–60 MT on 12–16 m stamped for trade (dharam kanta); a logistics park 60–80 MT on 18 m. Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.

Why Symphony in Bhiwadi

Scrap trucks in, billet trailers out, clay tippers all day: every Bhiwadi gate pays by the tonne.

  • Scrap in, steel outBoth gates stamped, one SMFW account.
  • Low ground, heavy August rainRaised plinth, drained apron, sealed IP67/IP68 cells.
  • Three shifts at the gateUnmanned: RFID, cameras, boom barrier.

Who needs one in Bhiwadi: Steel rolling and re-rolling mills, induction furnaces and ingot makers; auto-component, two-wheeler-parts and metal-pressing plants; ceramic-tile, sanitaryware and glass works; cable, electrical and switchgear units; yarn, fabric and processing houses; pharmaceutical, food, beverage, paint, chemical, plastic and packaging units; logistics parks and warehouses on the Bhiwadi–Dharuhera road and the Alwar bypass; scrap dealers and metal recyclers who lift furnace scrap and press-shop offcuts; ready-mix concrete plants, builders and building-material suppliers for the township; transporters and public weighbridge operators on the border roads.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Bhiwadi Phase I–IV, Chopanki, Pathredi, Sare Khurd, Rampur Mundana, Karoli, Salarpur.

Get a quotation

Who we build for in Bhiwadi

Furnaces, tile works, auto plants and warehouses across the Bhiwadi belt.

Rolling mills and induction furnaces

Scrap is bought by the truck and sold as billets and TMT by the trailer, the furnace yield is argued over every month, and a few kilos lost at the gate on each load is a real number by the year's end.

Our setup: An 80–100 MT, 18 m concrete (RCC) or pit-less steel weighbridge, stamped, with sealed IP67/IP68 load cells and SMFW reports that keep scrap-in and metal-out by party and material.

Tile, sanitaryware and glass works

Clay, feldspar and quartz come from the mines in bulk tippers at the legal limit, soda ash comes by the truckload, the kiln runs day and night, and the finished pallets go out on trailers against a packing list the buyer weighs again.

Our setup: A 60–80 MT, 18 m pit-less steel or RCC weighbridge with the unmanned option (RFID, cameras, boom barrier), stored tares for the regular tippers and reports by raw material and shift.

Logistics parks and warehouses

Trucks from two states queue at the same gate, every consignment is weighed against the e-way bill, and the park charges storage and handling by the tonne.

Our setup: A 60–80 MT, 18 m pit-less steel weighbridge, stamped, with SMFW slips that carry the consignor, the vehicle number and the bay, and the unmanned option for the night shift.

Industrial areas we serve in and around Bhiwadi
  • RIICO Bhiwadi Phase I to IVsteel, auto components, cables, textiles and engineering
  • RIICO Chopankiceramics, steel, pharmaceuticals and packaging
  • RIICO Pathredi and Sare Khurdauto components, electricals, food and plastics
  • RIICO Rampur Mundana, Karoli and Salarpurengineering, metal pressing and the newer plots
  • Khushkhera–Bhiwadi–Neemrana investment regionindustrial township plots on the Delhi–Mumbai Industrial Corridor
  • Bhiwadi–Dharuhera road and Alwar bypasslogistics parks, warehouses and transporters
Advice for Bhiwadi sites

Low ground, hot summers and three-shift gates: a weighbridge for a Bhiwadi plant.

Bhiwadi buys and sells by the tonne at every gate. A rolling mill or induction furnace takes scrap in on 10- and 12-wheel trucks and trailers against weight, and the ingots, billets and TMT that go out are invoiced the same way, so the melt-shop yield can only be checked if both gates stand on a stamped weighbridge: an 80–100 MT concrete (RCC) platform on 18 m, with sealed IP67/IP68 load cells, because a scrap yard runs hot, dusty and wet from the quench, and the 25-year structural warranty on the RCC matters where tippers bang on and off all day. The tile and glass works bring feldspar, clay and quartz in by bulk tipper from the Rajasthan mines and soda ash by the truckload, and send pallets out on trailers, and the auto-component and pressing plants take coils and blanks on 40-foot trailers and dispatch to assembly lines on fixed schedules, so a 60–80 MT, 18 m weighbridge with the unmanned option (RFID, cameras, boom barrier) and SMFW reports by party, material and shift is the usual gate fit; where the plot leaves no room for ramps, a pit-type weighbridge sits flush with the road. The ground along the Sahibi river basin is sandy loam that drains well on the rise and badly in the hollows: Bhiwadi's low pockets stand in water after a heavy August rain, so the pedestals go on a compacted base, the plinth is raised well above the road, the apron is drained, and a pit-type weighbridge in a low plot gets a sump and pump-out before it gets a platform. Summer passes 45 °C and winter brings fog and dust from the furnaces and the roads, so the indicator cabin is shaded and ventilated, the cables run in closed conduit, the junction box is sealed, and the first calibration with test weights is done before the plant's regular trailers start. Haryana-registered trucks stream in from Dharuhera all day, so a public weighbridge on the Bhiwadi–Dharuhera road or the Alwar bypass is built to 18 m for the longest multi-axle trailer and prints a slip that transporters from either state accept. Legal Metrology verification runs for a year; plan the stamping to fall with the annual shutdown so the gate is never closed on a working day, and keep the SMFW records filed with the slips for the plant's own audits.

Recommended forVehiclesCapacityWeighbridgeType
Rolling mill or induction furnaceScrap trucks, trailers of ingots and TMT80–100 MT18 mConcrete (RCC) or pit-less steel, stamped, unmanned option
Auto-component or metal-pressing plant40-foot coil trailers, component trucks60–80 MT18 mPit-type or pit-less steel, stamped, unmanned option
Ceramic-tile or glass worksBulk tippers of clay and feldspar, pallet trailers60–80 MT18 mPit-less steel or RCC, stamped
Scrap dealer or metal recyclerPick-ups to 12-wheel trucks40–60 MT12–16 mPit-less steel, stamped
Logistics park or public weighbridge, Bhiwadi–Dharuhera roadMulti-axle trucks, container trailers60–100 MT18 mPit-less steel or RCC, stamped

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Bhiwadi

From the plot layout to the stamped slip: six steps for a Bhiwadi plant.

Six steps for your project in Bhiwadi. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in BhiwadiTell us the heaviest vehicle you weigh (here, typically scrap trucks, trailers of ingots and TMT), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (rolling mill or induction furnace): 80–100 MT, 18 m weighbridge, Concrete (RCC) or pit-less steel, stamped, unmanned option. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

What a Bhiwadi melt shop, tile plant and warehouse ask before they buy.

Who supplies weighbridges in Bhiwadi?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges across the Bhiwadi industrial belt, including Bhiwadi Phase I to IV, Chopanki, Pathredi, Sare Khurd, Rampur Mundana, Karoli and Salarpur, with Legal Metrology stamping support.
Which weighbridge suits a rolling mill or induction furnace in Bhiwadi?
An 80–100 MT weighbridge on 18 m, in concrete (RCC) or pit-less steel, stamped for trade, with sealed IP67/IP68 load cells, so a loaded scrap trailer or a truck of billets stands fully on the platform in one weighing. SMFW keeps scrap-in and metal-out as separate reports by party and material, and the unmanned option (RFID, cameras, boom barrier) covers the night shift.
Pit-type or pit-less for a Bhiwadi plot?
Pit-less steel on pedestals where the yard has room for ramps and the ground drains: it installs faster and the load cells are easy to reach. Pit-type, flush with the road, where the gate is tight or the trailers must not climb, but only with a sump and pump-out, because Bhiwadi's low pockets fill in a heavy rain. Concrete (RCC) where tippers and scrap trucks run all day.
How long does a Bhiwadi weighbridge take to arrive?
For a Bhiwadi rolling mill, a Chopanki tile plant or a Pathredi auto-component unit, Symphony dispatches about 2 weeks after a commercially cleared order with PO. Civil work and curing come first; then installation, calibration with test weights and Legal Metrology stamping support. The weighbridge has a 1-year warranty, and RCC concrete weighbridges carry a 25-year structural warranty.
What decides the cost of a weighbridge in Bhiwadi?
Capacity (40–60 MT for a scrap dealer or recycler, 60–80 MT for an auto-component, tile or logistics unit, 80–100 MT for a rolling mill or furnace, 60–100 MT for a public weighbridge), length (12–18 m), the type (pit-less steel, pit-type with a sump or concrete (RCC)), the foundation (a compacted base and raised plinth on the sandy loam, drainage in the low pockets), the cabin, and options such as SMFW records and the unmanned system. Send your heaviest vehicle, the daily count and a photo of the site; an engineer replies within one working day.
भिवाड़ी में फैक्ट्री गेट के लिए धर्म कांटा कैसे स्थापित करें?
भिवाड़ी की रोलिंग मिल, फर्नेस, टाइल और ऑटो-पार्ट्स इकाइयों में स्क्रैप, कॉइल और मिट्टी ट्रेलर और टिपर में पूरी क्षमता पर आते हैं और तैयार माल उसी तरह जाता है, इसलिए फैक्ट्री गेट के लिए 60–80 टन क्षमता और 18 मीटर लंबाई का सत्यापित (स्टैम्पिंग युक्त) पिटलेस स्टील या पिट-टाइप धर्म कांटा उपयुक्त है, और रोलिंग मिल या फर्नेस के लिए 80–100 टन का आरसीसी कांटा। RFID, कैमरे और बूम बैरियर वाली अनमैन्ड प्रणाली तीनों शिफ्ट संभालती है और SMFW सॉफ़्टवेयर पार्टी, सामग्री और शिफ्ट के अनुसार विवरण देता है। भिवाड़ी के निचले हिस्सों में अगस्त की बारिश में पानी भरता है, इसलिए प्लिंथ ऊँचा रखें, एप्रन में निकासी बनवाएँ और पिट-टाइप कांटे में संप और पंप की व्यवस्था अवश्य करें। वार्षिक लीगल मेट्रोलॉजी सत्यापन प्लांट के शटडाउन के साथ करवाएँ। सिम्फनी वर्ष 1998 से धर्म कांटों का निर्माण कर रही है और स्टैम्पिंग में सहायता प्रदान करती है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com