
Alwar weighbridges for mustard mandis, oil mills and MIA.
Alwar, at the foot of the Aravalli hills in north-eastern Rajasthan, is the mustard city: its Krishi Upaj Mandi is one of the largest mustard markets in the country, and the oil mills around the city press sarson through the spring. The district's fields also grow wheat, bajra and onions, with the kharif onion crop traded in bulk from October. The Matsya Industrial Area (MIA) and the Agro Food Park of RIICO hold automotive, engineering, beverage, packaging and food units, and the Sariska tiger reserve lies in the hills. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Alwar district.
An Alwar mustard trader or oil mill usually needs a 40–60 MT, 12–16 m pit-less steel weighbridge stamped for trade; an onion or vegetable trader 30–40 MT on 9–12 m; an automotive or engineering unit at MIA 60 MT on 18 m for trailers; a public weighbridge 60–100 MT on 16–18 m (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.
Sarson by lot, oil and cake by tare: one record from mandi to mill.
- Mustard by lotSlips with party, lot and oil-mill tare.
- Rock or sandy loamRock-cut base in the hills, compacted base east.
- MIA trailers60 MT on 18 m, unmanned option.
Who needs one in Alwar: Mustard, wheat, bajra and onion traders and commission agents at the Alwar, Kherli, Rajgarh and Laxmangarh mandis; mustard oil mills and expellers; onion traders and cold stores; automotive, engineering, beverage, packaging and food units at the Matsya Industrial Area (MIA), the Agro Food Park and the older RIICO industrial areas of Alwar; flour mills and dairies; building-material suppliers and transporters; public dharam kanta operators.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Rajgarh, Laxmangarh, Kherli, Kathumar, Thanagazi, Ramgarh, Malakhera, Reni, Govindgarh.
Mustard traders, onion traders and MIA factories across Alwar district.
Mustard traders and oil mills
Sarson is bought by weight and oil content from March, and the oil mill weighs seed in and oil and cake out, so in and out tares both matter.
Our setup: A 40–60 MT, 12–16 m stamped pit-less steel weighbridge with SMFW party-wise slips and stored tares.
Onion traders and cold stores
The kharif onion crop comes in bulk from October in trolleys and pick-ups, and a wrong tare means a wrong payment to the grower.
Our setup: A 30–40 MT, 9–12 m stamped pit-less steel weighbridge with gross, tare and net on every slip.
Factories at MIA and the Agro Food Park
Components, bottled goods and finished vehicles leave on long trailers, often at night, and every dispatch must match the invoice.
Our setup: A 60 MT, 18 m pit-less steel or RCC weighbridge with the unmanned option (RFID, cameras, boom barrier).
- Matsya Industrial Area (MIA), Alwarautomotive, engineering, beverage, packaging and food units
- Agro Food Park (RIICO), Alwarfood processing and agro units
- RIICO industrial areas, Alwarmanufacturing and processing units
- Krishi Upaj Mandi, Alwarmustard, wheat, bajra and onions
- Kherli and Rajgarh mandismustard, wheat and bajra
Aravalli rock, sandy loam and the mustard season: sizing an Alwar weighbridge.
Mustard is the load that fills Alwar's weighbridges. From March the crop arrives at the Alwar, Kherli and Rajgarh mandis in tractor-trolleys and 10-wheel trucks, is bought by weight and oil content, and goes to the oil mills by the truckload, so a trader or mill needs a 40–60 MT, 12–16 m platform and an SMFW slip that carries the party, lot and vehicle number for both sides of the sale. Oil mills weigh seed in and oil and cake out, so stored tares for the regular tankers and trucks save time at the gate. The kharif onion crop comes to the mandi from October in trolleys and pick-ups, and a 30–40 MT, 9–12 m weighbridge is enough for a vegetable trader. The ground near the Aravalli can be firm and rocky, so a pedestal foundation may need levelling or rock cutting, while the plains to the east have sandy loam that needs a well-compacted base and firm approaches. Summers are very hot and winters cold, so shade the indicator cabin, keep cables in closed conduits away from the hot plate, and calibrate with test weights at installation. At MIA, finished vehicles, components and bottled goods leave on long trailers, so 60 MT on 18 m suits a factory gate, and the unmanned option (RFID, cameras, boom barrier) records every truck without a second clerk. Plan stamping and re-verification before the March mustard season.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Mustard trader or oil mill | Trolleys, 10-wheel trucks, tankers | 40–60 MT | 12–16 m | Pit-less steel, stamped |
| Onion or vegetable trader | Trolleys, pick-ups, small trucks | 30–40 MT | 9–12 m | Pit-less steel, stamped |
| Automotive, engineering or food unit, MIA | Trailers, 10- and 12-wheel trucks | 60 MT | 18 m | Pit-less steel or RCC, stamped, unmanned option |
| Public weighbridge | Trolleys to multi-axle trucks | 60–100 MT | 16–18 m | Pit-less steel or RCC, stamped |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From the Kherli mandi to the MIA gate: six steps in Alwar.
Six steps for your project in Alwar. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in AlwarTell us the heaviest vehicle you weigh (here, typically trolleys, 10-wheel trucks, tankers), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (mustard trader or oil mill): 40–60 MT, 12–16 m weighbridge, Pit-less steel, stamped. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Alwar's mustard, onion and factory trade.
Who supplies weighbridges in Alwar?
Which weighbridge suits a mustard trader or oil mill in Alwar?
Which weighbridge suits a factory at the Matsya Industrial Area?
How long does an Alwar weighbridge take to arrive?
What decides the cost of a weighbridge in Alwar?
अलवर में सरसों व्यापार या तेल मिल के लिए धर्म कांटा कैसे चुनें?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
