Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Deeg · Rajasthan

Deeg weighbridges for mustard mandis, oil mills and stone crushers.

Deeg, in the mustard country of eastern Rajasthan between the Braj plain and the Mewat hills, is a district of market yards, oil presses and stone crushers. The Krishi Upaj Mandis at Deeg, Kumher, Nagar and Kaman are busy mustard markets every spring; kacchi-ghani oil mills and expellers buy seed by the trolley and sell oil by the tanker; the stone crushers and grit yards of the Pahari belt load tippers for builders on both sides of the Haryana border; the industrial area at Deeg holds small processing and engineering units; and the Braj villages send milk, ghee and cattle feed out every day. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Deeg district.

Quick answer

A mustard trader or kacchi-ghani oil mill in Deeg, Kumher or Nagar usually needs a 40–60 MT, 12–16 m pit-less steel weighbridge stamped for trade, long enough for a tractor with a loaded seed trolley; a stone crusher or grit yard in the Pahari belt 60–80 MT on 16–18 m, or 80–100 MT in concrete (RCC) for the heaviest tippers; a unit in the Deeg industrial area or a warehouse 40–60 MT on 12–16 m; a dairy or ghee plant 30–40 MT on 9–12 m; a public weighbridge on the Mathura–Alwar road 60–100 MT on 16–18 m (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.

Why Symphony in Deeg

Sarson trolleys in spring, grit tippers all year: one stamped weight for every Deeg trade.

  • Seed in, oil and khal outOne mill gate, three SMFW reports, one stamped weight.
  • Wet plain, rocky hillsRaised plinth and drained apron at Deeg; pedestals on rock at Pahari.
  • Crusher grit all daySealed IP67/IP68 load cells, a clean gap, unmanned option.

Who needs one in Deeg: Mustard, wheat, bajra and gram traders and commission agents at the Deeg, Kumher, Nagar and Kaman mandis; kacchi-ghani mustard-oil mills, expellers, refiners and oil-cake (khal) traders; stone crushers and grit and sand suppliers of the Pahari and Kaman belt; brick kilns; the industrial area at Deeg; dairy chilling centres, ghee makers and cattle-feed units of the Braj villages; warehouses and cold storages for seed and grain; transporters on the Mathura–Alwar and Bharatpur–Gurugram roads; public dharam kanta operators.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Kumher, Nagar, Kaman, Pahari, Sikri, Jurhara, Janoothar, Rarah.

Get a quotation

Who we build for in Deeg

Oil mills, crushers, mandi traders and dairies across Deeg district.

Kacchi-ghani mustard-oil mills

Seed is bought by the trolley from March, oil is sold by the tanker and tin all year, khal goes to the feed trade by the bag, and the crushing yield between the three is the mill's margin; a heaped trolley hanging off a short platform makes every number wrong.

Our setup: A 40–60 MT, 12–16 m pit-less steel weighbridge, stamped, with SMFW reports that keep seed-in by grower and lot, oil-out by tanker and buyer, and khal-out by party.

Stone crushers of the Pahari belt

Crushed stone and grit leave at the legal limit on tippers and trailers from dawn to late night, the buyer at the building site weighs again, and grit and fines settle on everything in the yard.

Our setup: A 60–80 MT, 16–18 m pit-less steel or 80–100 MT concrete (RCC) weighbridge with sealed IP67/IP68 load cells, a clear gap kept clean every shift, the unmanned option (RFID, cameras, boom barrier) and reports by material and shift.

Dairy chilling centres and ghee makers

Milk comes in twice a day from the Braj villages in cans and small tankers, ghee and feed go out on pick-ups and small trucks, and the plant pays the society by weight rather than by the can.

Our setup: A 30–40 MT, 9–12 m pit-less weighbridge at the chilling centre, stamped, with slips that carry the society, the route and the vehicle number.

Industrial areas we serve near Deeg
  • Deeg mandi and the Deeg industrial areamustard, wheat and bajra trade, oil expellers and small processing units
  • Kumher mandimustard, wheat and gram arrivals, cold storages
  • Nagar mandimustard and bajra trade, oil and khal dealers
  • Kaman mandi and the Kaman–Pahari beltmustard trade, stone crushers and grit yards
  • Pahari stone crushers and grit yardscrushed stone, grit and sand on tippers and trailers
  • Braj dairy villages around Deeg and Kumhermilk chilling, ghee and cattle feed
Advice for Deeg sites

Heaped seed trolleys, wet low ground and crusher dust: sizing a Deeg weighbridge.

A Deeg weighbridge is built around the mustard season. From March to May the sarson comes to the Deeg, Kumher, Nagar and Kaman mandis in tractor-trolleys heaped under tarpaulin and in 10-wheel trucks of bags, the commission agent settles with the grower on the mandi weight, and the oil mill pays the agent on the weight at its own gate, so both platforms must be stamped for trade and print a slip the other side accepts: a 40–60 MT, 12–16 m pit-less steel weighbridge takes a tractor and its trolley in one weighing. Inside a kacchi-ghani mill the loads change shape: seed in by the trolley, oil out in tankers and tins, khal out in bags for the cattle-feed trade, and SMFW keeps seed-in, oil-out and cake-out as separate reports so the crushing yield can be checked lot by lot. The mandi platform is busy from Holi to the first rains and quiet in the monsoon, so book stamping or the annual re-verification in February so the certificate is in hand before the first trolleys. The ground differs across the district: the low alluvial plain around Deeg and Kumher holds water after a wet August, so a pit-less weighbridge on a raised plinth with a drained apron is the safer choice there and a pit-type weighbridge is installed only with a sump and pump-out, while the Pahari and Kaman belt sits on the rocky Aravalli outliers, where the pedestals can bear on rock and the problem is dust rather than water. At a stone crusher the tippers leave at the legal limit all day, grit and fines settle on every surface, and a few hundred kilos lost on each load is the whole margin, so the crusher gate takes a 60–80 MT, 16–18 m pit-less steel weighbridge, or an 80–100 MT concrete (RCC) weighbridge for a grit yard that loads multi-axle trailers, with sealed IP67/IP68 load cells, a clear gap around the platform that is cleaned every shift and the unmanned option (RFID, cameras, boom barrier) for a yard that loads through the night. The dairy side is lighter: milk tankers, feed trucks and ghee consignments on pick-ups and small trucks, which a 30–40 MT, 9–12 m weighbridge at the chilling centre or feed unit covers with slips by vehicle and route. May and June in Deeg pass 45 °C, so the indicator cabin is shaded and ventilated, the cables run in closed conduit off the plate, and the first calibration with test weights is done early in the morning before the steel heats up.

Recommended forVehiclesCapacityWeighbridgeType
Mustard mandi trader, Deeg, Kumher or NagarTractor-trolleys of sarson, 10-wheel trucks40–60 MT12–16 mPit-less steel, stamped
Kacchi-ghani oil mill, expeller or refinerSeed trolleys, oil tankers, khal trucks40–60 MT12–16 mPit-less steel, stamped
Stone crusher or grit yard, Pahari beltTippers, multi-axle trailers of grit and stone60–100 MT16–18 mPit-less steel or concrete (RCC), stamped, unmanned option
Industrial area unit, warehouse or cold storageMulti-axle trucks, tempos40–60 MT12–16 mPit-less steel, stamped
Dairy chilling centre, ghee or feed unitMilk tankers, pick-ups, small trucks30–40 MT9–12 mPit-less steel, stamped
Public weighbridge, Mathura–Alwar roadTrolleys to multi-axle trucks60–100 MT16–18 mPit-less steel or RCC, stamped

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Deeg

From the Kumher mandi gate to the Pahari crusher yard: six steps in Deeg.

Six steps for your project in Deeg. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in DeegTell us the heaviest vehicle you weigh (here, typically tractor-trolleys of sarson, 10-wheel trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (mustard mandi trader, Deeg, Kumher or Nagar): 40–60 MT, 12–16 m weighbridge, Pit-less steel, stamped. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

What Deeg's oil millers and Pahari's crusher owners ask us.

Who supplies weighbridges in Deeg?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges across Deeg district, including Kumher, Nagar, Kaman, Pahari, Sikri, Jurhara, Janoothar and Rarah, with Legal Metrology stamping support.
Which weighbridge suits a mustard trader or oil mill in Deeg or Kumher?
A 40–60 MT pit-less steel weighbridge on 12–16 m, stamped for trade. A heaped sarson trolley needs the length so the tractor and the trolley stand on the platform together, and the same weighbridge weighs the 10-wheel trucks of bags, the oil tankers and the khal loads. SMFW prints gross, tare and net with the grower, lot and party on every slip and keeps seed-in, oil-out and cake-out as separate reports for the crushing yield.
Which weighbridge suits a stone crusher in Pahari or Kaman?
A 60–80 MT pit-less steel weighbridge on 16–18 m for tippers, or an 80–100 MT concrete (RCC) weighbridge on 18 m where multi-axle trailers load; the RCC concrete carries a 25-year structural warranty. Sealed IP67/IP68 load cells and a clear gap around the platform keep grit and fines from dragging the zero, and the unmanned option (RFID, cameras, boom barrier) weighs the night loading without a clerk.
How long does a Deeg weighbridge take to arrive?
For a Kumher mandi trader, a Deeg oil mill or a Pahari crusher, Symphony dispatches about 2 weeks after a commercially cleared order with PO. Civil work and curing come first; then installation, calibration with test weights and Legal Metrology stamping support. The weighbridge has a 1-year warranty, and RCC concrete weighbridges carry a 25-year structural warranty.
What decides the cost of a weighbridge in Deeg?
Capacity (30–40 MT for a dairy or ghee unit, 40–60 MT for a mandi trader, oil mill or warehouse, 60–80 MT for a crusher, 80–100 MT for a grit yard loading trailers, 60–100 MT for a public weighbridge), length (9–18 m), the type (pit-less steel, pit-type with a sump or concrete (RCC)), the foundation (a raised plinth and drainage on the low alluvial plain, pedestals on rock in the Pahari belt), the cabin, and options such as SMFW records and the unmanned system. Send your heaviest vehicle, the daily count and a photo of the site; an engineer replies within one working day.
डीग, कुम्हेर या नगर में सरसों के व्यापार या तेल मिल के लिए धर्म कांटा कैसे स्थापित करें?
मार्च से मई तक सरसों ट्रैक्टर-ट्रॉली में ऊँची ढेरी के रूप में मंडी और तेल मिल पहुँचती है, इसलिए मंडी के व्यापारी या कच्ची घानी तेल मिल के लिए 40–60 टन क्षमता और 12–16 मीटर लंबाई का सत्यापित (स्टैम्पिंग युक्त) पिटलेस स्टील धर्म कांटा उपयुक्त है, जिस पर ट्रैक्टर और भरी ट्रॉली एक साथ खड़े हो सकें। SMFW सॉफ़्टवेयर बीज की आवक, तेल की रवानगी और खल की बिक्री के अलग-अलग विवरण रखता है, जिससे पेराई का उत्पादन लॉट के अनुसार जाँचा जा सकता है। डीग और कुम्हेर की निचली ज़मीन में बरसात के बाद पानी ठहरता है, इसलिए प्लिंथ ऊँचा रखें और एप्रन में निकासी की व्यवस्था करें। सरसों की आवक से पहले फरवरी में लीगल मेट्रोलॉजी सत्यापन करवा लें। सिम्फनी वर्ष 1998 से धर्म कांटों का निर्माण कर रही है और स्टैम्पिंग में सहायता प्रदान करती है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com