
Lanva GIDC weighbridges for small units, depots and carriers.
Lanva, in Patan district, is one of the GIDC estates the state lists for the district alongside Patan, Balisana, Siddhpur and Chanasama. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) to units, depots and carriers working at Lanva GIDC: small processors, engineering and fabrication shops, packaging and storage operators, and contractors who haul material in and out. In a small unit the weighbridge is rarely a luxury; it is the one fixed point where a load acquires a number that the seller, the carrier and the buyer can all read. A unit may weigh only a few trucks a day, but each of those weighments settles a bill, so a platform that stays accurate through heat, dust and monsoon is worth more than a large one that drifts. We plan the platform around the plot you actually have, with a slip that records vehicle, party, material and net weight. A weighbridge placed just inside your own gate, with a holding bay for waiting trucks, keeps trucks off the public lane. Mark a calm corner for the cabin where the sun does not fall on the indicator, run the cable in a buried conduit instead of across the apron, and keep a printed card of the platform length beside the window so a new driver learns the rules in ten seconds. After a heavy shower, glance at the drain beside the slab before the first truck, since standing water is the easiest fault to prevent and the slowest to dry.
Most Lanva units can start with a 40 MT weighbridge over 12 m in pit-less steel, which takes a loaded truck on a small plot. A unit that receives full trailers or tippers should choose 60 MT over 16 m, while a depot weighing only pickups and small trucks can use 30 MT over 9 m. A modular platform on a hard, level surface suits a unit that wants to start quickly without foundation work. Sealed IP68/IP69K cells and a closed junction box handle dust and rain. Dispatch is about 2 weeks from a commercially cleared PO. Whichever length you choose, the indicator shows gross, tare and net at once, and the slip prints with the date, the time and the vehicle number.
Few trucks a day, every one a bill: weigh each load right.
- Sized to the plotThe platform and approach are drawn on your sketch before work begins.
- Steady in heat and dustSealed cells and a shaded indicator keep readings steady.
- A slip for every partyEach load gets a printed slip with vehicle, party and net weight.
Who needs one in Lanva GIDC: Weighbridges suit small processors, engineering and fabrication shops, packaging and storage operators, building-material depots and carriers.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Patan, Siddhpur, Mehsana.
Processors, depots and workshops across the Lanva estate.
Small processing units
A few trucks a day, each settling a bill.
Our setup: Suggested: 40–50 MT on 12–14 m in pit-less steel, with a closed junction box and a tare list for the regular trolleys.
Material depots
Sand and gravel leave in loaded tippers.
Our setup: Suggested: 60–70 MT across 16–17 m, sealed cells, a gap that a hose can clear.
Quick starters
A new shed with no foundation budget yet.
Our setup: Suggested: a modular platform on a hard slab, with no foundation work.
- Lanva GIDC unitsweighbridge enquiries welcome
- Patanweighbridge enquiries welcome
- Siddhpurweighbridge enquiries welcome
- Mehsanaweighbridge enquiries welcome
Narrow plots, heat and monsoon water: siting a weighbridge at Lanva.
On a small plot the layout decides everything, so begin with a sketch of the plot, the gate and the road, and draw the truck's path on it before choosing the platform. A straight entry, a full stop on the platform and an exit that does not require reversing are the three things that matter most. If the plot is narrow, a shorter platform with a longer approach slab works better than a long platform with no run-in. Summer heat is the second factor: a roofed cabin with a fan and a shaded indicator keep the clerk comfortable and the electronics out of the direct sun, which matters in the afternoon sun. Dust and monsoon water are the third: a closed junction box, sealed IP68/IP69K cells and a drain that carries rain away from the cells keep the readings steady season after season. A platform that sits a few millimetres out of level misreads every truck, so cut the slab level instead of tilting the steel, and have the levels checked once a year before the busy season. Think about the seasons too: after the monsoon the approach slab can crack where water collects, so slope it gently away from the platform and keep the joint sealed. Ask each carrier to keep the axle group fully inside the length of the platform, and the clerk to wait for the stable mark before printing. SMFW stores each vehicle, party and material, prints a slip with gross, tare and net and keeps a register for the accountant; WOS shows the day's tonnes on the owner's phone, free with the weighbridge for a limited time. Keep the indicator on a UPS with proper earthing, so the figure survives short power cuts. Where a depot buys from many small suppliers, let the clerk store each regular supplier's tare once, so that the empty weighing is skipped for the second visit and the queue at the gate moves faster. A workshop can enter the job number in the remarks column, which turns the slip into a delivery record. Buyers usually expect a current Legal Metrology verification, so we guide you through stamping and its yearly renewal. Share a photo of the plot with the gate marked and our engineers will return a layout with platform, ramps and cabin, usually with two options so that you can compare a longer and a shorter platform on your own land. SMFW prints a party-wise report for month end in a single step. Keep the weighing lane free of parked vehicles and loose stones, because a stone under a corner of the platform can lift it enough to alter the reading, and have the clerk sweep the gap before the first weighment of the day. A small board listing the platform length and the maximum capacity tells drivers at once whether their vehicle may use it. A painted stop line, a bold board and a repeater display facing the driver finish the job. A weighed slip also helps a small depot bill sand, gravel and bricks by weight instead of by guesswork, which removes the commonest argument at a modest yard.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Small processor | A few trucks a day | 40–50 MT | 12–14 m | Pit-less steel, closed junction box, party-wise slips |
| Engineering or fabrication shop | Steel in, finished work out | 40 MT | 12 m | Raised steel on a concrete apron |
| Building-material depot | Sand, gravel and bricks | 60–70 MT | 16–17 m | Heavy steel or RCC with sealed cells |
| Storage and packing shed | Mostly pickups and mini-trucks | 30 MT | 9 m | Low steel platform on a level slab, repeater display |
| Unit that wants to start quickly | No time for foundation work | 40–50 MT | 12–14 m | Modular platform; installs within hours of delivery on a hard, level slab |
| Carrier or contractor yard | Mixed loads, many parties | 60 MT | 16 m | Heavy steel with a printed register |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From plot sketch to first slip: a Lanva weighbridge in six steps.
Six steps for your project in Lanva GIDC. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in Lanva GIDCTell us the heaviest vehicle you weigh (here, typically a few trucks a day), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (small processor): 40–50 MT, 12–14 m weighbridge, Pit-less steel, closed junction box, party-wise slips. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
What Lanva unit owners and carriers ask before ordering.
Who supplies weighbridges at Lanva GIDC?
What length should a Lanva unit choose?
Is it worth having our own weighbridge?
Is digging unavoidable?
How is the indicator kept safe in a power cut?
Does the slip need verification?
What will a Lanva weighbridge cost?
लानवा जीआईडीसी में छोटी इकाई के लिए वेब्रिज कैसे चुनें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
