Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Makhel GIDC · Gujarat

Makhel GIDC weighbridge care after installation.

Makhel GIDC in Kutch district is counted by GIDC among its saturated estates. Symphony supplies new weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for units here, and helps owners think about the years after installation: how a platform stays clean, level and reliable through heat, dust, rain and daily traffic.

Quick answer

For a new installation handling multi-axle tippers, 60 to 80 MT on 12 to 16 m is a practical starting range; long trailers need 18 m. Where dust settles heavily or water stands after rain, a raised pit-less weighbridge is generally easier to inspect than a pit-type one. Ask for IP68/IP69K load cells, protected cables, lightning and surge protection, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO; stamping support is provided.

Why Symphony in Makhel GIDC

Dust, rain, daily axles: plan for the long run.

  • Zero before tradeAn empty platform that does not read zero needs attention first.
  • Keep the gap clearA wedged stone quietly changes the net weight.
  • Write it downA service book turns complaints into evidence.

Who needs one in Makhel GIDC: Whatever a Kutch unit carries in vehicles, whether loose minerals, salt, building material, farm produce or manufactured goods, the weighbridge repeats the same measurement thousands of times, so care of the equipment matters as much as the purchase.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Makhel GIDC

Bulk, salty cargo, old scales: three situations.

Loose bulk loading

Spillage collects at the entry and in the platform gap.

Our setup: Suggested: 80 MT on 16 m with a cleaning round written into each shift.

Corrosive or salty cargo

Residue attacks paint and hardware over time.

Our setup: Suggested: 60 MT steel-cum-RCC on a raised, free-draining pit-less layout.

Upgrading an ageing scale

Owners need to know what can be kept.

Our setup: Suggested: a site survey of foundation, cables and platform before quoting the replacement.

Industrial areas we serve near Makhel GIDC
  • Makhel GIDCan estate in the saturated annexure of GIDC, where fresh industrial allotment is by public auction
Advice for Makhel GIDC sites

Zero, gaps, drains, rust: the owner's routine.

A weighbridge rarely fails all at once. It drifts after small neglects that anyone on site can see. Make a routine and write it on the cabin wall. Each morning, before the first vehicle, confirm the empty platform reads zero. Walk both sides and pull out stones, plastic, weeds or hardened mud lodged between the platform and the side walls, because anything bridging that gap carries part of the load past the load cells. Each week, sweep underneath where access allows, see that drain openings are open and look for chewed or pinched cables. After a storm, check the earthing connections for looseness, and if readings drift, ask a service engineer to inspect the junction box for moisture. Rust on structural steel deserves attention early: note where paint has broken, clean to sound metal and repaint, and keep water from pooling on those spots. Vegetation along the approach looks harmless but hides drainage faults and gives rodents cover around cables. Heavy braking on the platform shakes bearings and mountings, so paint a stop line and post a slow-speed notice at the entry. In dry windy months, dust packs into corners; in the rains it turns to paste, which is why cleaning should not wait for a fixed shutdown. Keep a service book that records every fault, repair, part and verification date, along with who did the work. When a reading is doubted, repeat it with the same vehicle at the front, middle and rear of the platform and note the three figures before calling service; the comparison shows whether one corner is behaving differently. Never open sealed parts or alter settings to force a match. Repairs that affect a sealed instrument can require re-verification, so plan service visits around the stamping calendar and keep the certificate where an inspector can see it.

Recommended forVehiclesCapacityLengthNote
Multi-axle tippersTippers carrying loose bulk material60–80 MT12–16 mClear spillage from the platform gap daily
Two and three axle trucksSalt, grit, bagged goods60 MT12 mRinse corrosive residue and let drain
Long trailersMachinery, pipes, bales80 MT18 mCheck all axles sit inside the edges
Tractor-trolleysFarm and local haulage40 MT9–10 mStop with tractor and trolley both on
Replacing an old unitPresent traffic mix60 MTTo suit the vehiclesSurvey the old foundation before reuse
Dusty exposed yardMixed loads60 MT12–14 mRaised pit-less layout for easy inspection

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Makhel GIDC

New installation in Makhel, stage by stage.

Six steps for your project in Makhel GIDC. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in Makhel GIDCTell us the heaviest vehicle you weigh (for example, tippers carrying loose bulk material), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (multi-axle tippers): 60–80 MT, 12–16 m weighbridge; clear spillage from the platform gap daily. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Zero errors, rust, repairs: Makhel asks.

How is Makhel shown on GIDC's allotment list?
It appears in the saturated annexure. There, a new industry obtains a plot or shed by public auction, with preference for adjoining units under the corporation's policy.
Why does my weighbridge not return to zero?
Common causes are debris in the side gap, water or mud under the platform, a damaged cable or moisture in a junction box. Clean and inspect, then call service if it persists.
Can an old foundation be used again?
Sometimes. It has to be checked for level, cracks, settlement, drainage and fit with the new platform before anyone relies on it.
Is surface rust a reason to replace the platform?
Not by itself. Have the depth of corrosion and the condition of the load points assessed, then decide between repair and replacement.
Do repairs affect verification?
Work that disturbs sealed parts can require re-verification under Legal Metrology rules. Ask before the repair begins.
What does the warranty cover?
The weighbridge carries a 1-year Symphony warranty; on steel-cum-RCC construction the RCC concrete also has a 25-year structural warranty, subject to terms and conditions.
What affects weighbridge cost for a Makhel GIDC yard?
Capacity, length, platform material, new or reused foundation, ramps, cabin, cable protection and software. Send photos of the yard on WhatsApp +91 63525 86656 or call +91 94092 42100.
माखेल जीआईडीसी में वेब्रिज की सटीकता बनाए रखने के लिए रोज़ क्या करें?
पहली गाड़ी से पहले शून्य जाँचें, प्लेटफ़ॉर्म के किनारे से कंकड़ और मिट्टी हटाएँ, निकासी और केबल देखें और हर खराबी दर्ज करें। एस.एम.एफ. एंटरप्राइज़ 1998 से वेब्रिज बना रही है और स्टैम्पिंग में सहायता करती है। कॉल: +91 94092 42100, व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com