
Naliya weighbridge, for minerals and harvest loads.
Naliya is the headquarters town of Abdasa taluka in western Kutch, linked to Bhuj by National Highway 41. Bentonite is commercially mined in the taluka and its farms grow cotton, millet, groundnut, sunflower and wheat. Symphony can supply a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) for mineral loading, produce trading and transport work.
For mineral or cement trailers, plan 80 to 100 MT on 16 to 18 m, matched to the axle layout. Tipper-only yards often fit 60 MT on 12 m, and a produce buyer handling trolleys and rigid trucks 40 to 50 MT on 12 m. Specify sealed IP68/IP69K load cells, Class III accuracy and SMFW software. Allow about 2 weeks for dispatch after a commercially cleared PO. We also support you through Legal Metrology stamping.
Clay, cotton, cement: choose for your main load.
- Scrape wet clayPacked bentonite must not support the platform.
- Protect against saltSoil study and coating are decided together.
- Keep details handySerial and capacity notes speed up fault calls.
Who needs one in Naliya: Different kinds of traffic ask different things of a platform in Abdasa. Mineral tippers arrive heavy, dusty and often, dropping lumps and fine clay on the approach. Farm produce moves in bursts after harvest, in trolleys and trucks whose owners want to watch the figure. Cement and building material trade adds dense loads on rigid trucks and long trailers. Settle which of these dominates your yard before choosing capacity and length.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Abdasa.
Mine lots, farm buying, bulk haul: different disputes to prevent.
Loading bentonite for buyers
Moisture can change the weight between the mine and the plant.
Our setup: Suggested: record date, time, lot and vehicle so differences can be traced.
Buying cotton from farms
Bulky loads overhang and sellers watch closely.
Our setup: Suggested: remote display, printed slip and every wheel on the platform.
Moving cement and construction material
Dense loads reach the legal limit quickly.
Our setup: Suggested: gross weight check before the truck leaves the yard.
- Naliya and Abdasa talukataluka headquarters with commercial bentonite mining and field crops in the taluka
Keep water out, keep the gaps clean.
Western Kutch rewards a site that is easy to maintain, since a stoppage during loading holds up every vehicle behind it. Raise the structure and slope the ground so that water cannot stand beneath it after rain. Bentonite swells and turns sticky when wet, so spilt clay should be scraped from the gaps and underside before it packs and carries part of a load. In dry months the same material blows as dust: seal the cabin, keep the printer covered and wipe cable glands during inspection. Ask for a soil investigation, especially on low or salt-affected ground, and let it decide foundation depth, concrete protection and drainage. Discuss surface preparation and paint for the steel, and check anchor points, stoppers and welds on a fixed calendar. Give tippers a straight approach and forbid raising the body on the platform; a shifting load or sharp braking can damage load cells. Keep a spare-parts and service contact list in the cabin, with the load cell capacity and serial details, so a fault can be described accurately by phone. Where mains supply is unsteady, size the backup for the indicator, computer, printer and display together. A bonded earth and lightning surge protection belong in the first drawing. Do not weld on the structure without disconnecting and bonding as instructed. Trade use requires Legal Metrology verification before starting, at due dates and after repair or shifting.
| Recommended for | Vehicles | Capacity | Length | Note |
|---|---|---|---|---|
| Mineral loading point | Multi-axle tippers | 80 MT | 16 m | Clear clay from gaps daily |
| Cement and bulk haulage | Long trailers | 80–100 MT | 18 m | Match axle loads to the drawing |
| Tipper-only crusher or stockyard | Rigid tippers | 60 MT | 12 m | No tipping on the platform |
| Cotton and groundnut buyer | Trolleys and trucks | 40–50 MT | 12 m | Display visible to the grower |
| Village produce yard | Tractor trolleys | 30 MT | 10 m | Check combined length |
| Shifting project stockpile | Short rigid trucks | 40 MT | 9 m | Modular, on hard level concrete |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
Soil visit to first loading, one step at a time.
Six steps for your project in Naliya. For foundation-based models, curing takes time, so the drawing comes first.
- 1 · Your traffic in NaliyaTell us the heaviest vehicle you weigh (for example, multi-axle tippers), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (mineral loading point): 80 MT, 16 m weighbridge; clear clay from gaps daily. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Clay, drainage and owners: Abdasa users ask.
Which capacity suits bentonite trucks?
Can the weighbridge stand outdoors in a mine yard?
How do we weigh sticky material correctly?
Is a pit-type design suitable on low ground?
Can records for different mine owners be separated?
What is the warranty position?
How is a quotation for Naliya prepared?
नलिया में बेंटोनाइट यार्ड के लिए वेब्रिज का रखरखाव कैसे करें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
