Arambhada GIDC weighbridge, sized to the plot you actually hold.

GIDC's own list of saturated estates carries both Arambada and Arambhada-II, and a regional e-auction notice of July 2025 offered industrial plots in Arambhada-I and Arambhada-II. Whether you have run a unit here for years or have just bid for ground, Symphony can fit a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) to a coastal industrial plot.

Quick answer

On a tight auction plot with rigid trucks, 40 to 50 MT on 9 to 12 m is the usual start. Multi-axle goods carriers call for 60 MT on 16 m, and trailers 80 MT on 18 m, provided the plot allows the straight run these lengths need. Near the sea, discuss a steel-cum-RCC build, maintenance-friendly drainage and IP68/IP69K load cells, with Class III accuracy and SMFW records. Allow about 2 weeks to dispatch from a purchase order whose commercial terms are cleared.

Why Symphony in Arambhada GIDC

Fixed boundaries, salty air: design for both.

  • Fit the plotApproach length decides layout as much as tonnage.
  • Beat the saltFresh-water washing and sealed cable entries.
  • Measure old pitsReuse only after levels and concrete pass.

Who needs one in Arambhada GIDC: In a saturated estate, new entrants come in through public auction, so land arrives in fixed shapes. You cannot stretch a plot to suit a platform; the platform and its approaches have to suit the plot. Occupants who already work here face a related problem when an old machine is replaced: the new one must go where trucks, pipes and sheds have long since settled their positions. Arambhada, once listed as a census town, is described as now part of Okha municipality, which makes salt-laden coastal air a practical design matter for any steel or cable left in the open.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Arambhada GIDC

Replace, receive, release: where the weight matters.

Replacing a tired weighbridge

Production cannot stop for a long civil job.

Our setup: Suggested: survey the old pit early and settle drawing and delivery before dismantling.

Checking inbound bulk loads

Damp material can weigh differently from the supplier's figure.

Our setup: Suggested: record both weighments with time and keep the supplier's slip beside yours.

Dispatching in drums or bags

A count error shows up only at the buyer's gate.

Our setup: Suggested: compare truck net weight with the packing list before release.

Industrial areas we serve near Arambhada GIDC
  • Arambhada-I and Arambhada-IIindustrial plots offered in GIDC's Jamnagar region e-auction of July 2025
Advice for Arambhada GIDC sites

Drainage and washing come before concrete.

Coastal sites punish neglect faster than inland ones, so plan the cleaning routine before the foundation. Salt, damp grit and standing water attack paint edges, bolts and cable glands. Give the space under the platform a floor that slopes to an outlet, leave openings wide enough for a person to wash and inspect, and wash with fresh water on a fixed day. Ask which parts are galvanised, painted or sealed, and keep touch-up paint at site. Route cables in conduit with sealed entries, mount the junction box above any possible water line and close it properly after every visit. Install surge protection and a sound earth, because damp soil and long mains runs carry faults into electronics. On the layout side, measure the clear straight run available between the gate and the first obstruction. If it is shorter than the platform plus both approaches, consider turning the weighbridge parallel to the front wall, or a foundation-free modular model on a hard, level surface. Confirm plot boundaries, drain reserves and building margins from the allotment papers before excavation, and check with the estate office where permissions are needed. For a replacement job, have the old pit measured and its concrete examined; reuse is possible only when the drawing, levels and strength all agree. Trade weighing needs Legal Metrology verification and a stamp before use, again on the due date and after any repair or relocation.

Recommended forVehiclesCapacityLengthNote
Compact auction plotTwo and three axle trucks40–50 MT9–12 mDraw approaches on the plan first
Bulk goods unitMulti-axle rigid carriers60 MT16 mWash under the platform weekly
Trailer trafficArticulated trailers80 MT18 mCheck swing at the gate
Old machine replacementExisting fleetMatch heaviest vehicleSurvey the old pitVerify concrete before reuse
No excavation wantedLight and rigid trucks30–40 MT7.5–9 mModular on hard level base
Packing sectionPallets and drumsPlatform scaleIndoor sizeKeep away from wet floors

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Arambhada GIDC

From plot plan to stamped weighing.

Six steps for your project in Arambhada GIDC. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in Arambhada GIDCTell us the heaviest vehicle you weigh (for example, two and three axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (compact auction plot): 40–50 MT, 9–12 m weighbridge; draw approaches on the plan first. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Auction plots and old pits: occupier questions.

We won a plot at auction. What should we send first?
The plot plan with dimensions, gate position, your longest vehicle and the heaviest loaded weight. A layout can be checked from these.
Can an old foundation take a new weighbridge?
Sometimes. It depends on pit size, pedestal spacing, level and the state of the concrete, so a measured survey comes before any promise.
How do we slow corrosion near the coast?
Drain the base, wash off salt, repaint damaged spots early and keep cable glands tight. Concrete platforms reduce the exposed steel surface.
Which is better here, pit type or pit-less?
Pit-less is easier to inspect and drain. Pit type saves frontage because it needs no ramps, but only where water can be reliably pumped or drained.
Can gate staff be reduced?
For a registered fleet, tags, cameras and a boom barrier allow unmanned weighing.
How long is the warranty?
The equipment carries a one-year warranty. RCC concrete additionally has a 25-year structural warranty under written terms.
What will a weighbridge cost for an Arambhada plot?
The answer turns on size, tonnage, concrete or steel build, pit or ramps, drainage work and cabin. Share your plan on WhatsApp +91 63525 86656 or call +91 94092 42100.
आरंभड़ा के तटीय औद्योगिक प्लॉट पर धर्म कांटा स्थापित करते समय क्या ध्यान रखें?
जल निकासी, मीठे पानी से नियमित धुलाई, सीलबंद केबल प्रविष्टि और अर्थिंग का विशेष ध्यान रखें तथा व्यापारिक उपयोग से पहले सत्यापन कराएँ। सिम्फनी वर्ष 1998 से कार्यरत है और स्टैम्पिंग में सहयोग देती है। फोन +91 94092 42100, व्हाट्सएप +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998