
Dahanu weighbridges for chikoo, fish and port projects.
Dahanu, on the coast of Palghar district, is known for its chikoo (sapota) orchards: the Dahanu Gholvad chikoo carries a GI tag, and the fruit leaves Gholvad, Bordi and Kosbad every day for markets in Mumbai, Gujarat and beyond. The taluka also has fish landings at Dahanu and Dhakti Dahanu, the Dahanu thermal power station, and the Vadhavan port project, now under development, with its construction supply. Because Dahanu taluka is a notified eco-sensitive area, its weighing work is mostly orchards, fish, power-station contractors, construction material and transport. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Dahanu and Talasari.
A Dahanu chikoo packer or trader usually needs a 40 MT, 12 m weighbridge for tempos and small trucks; a fish trader or ice plant 40–60 MT on 12–16 m in concrete (RCC) for wet, salty conditions; a fly-ash, stone or port-project contractor 80–100 MT on 16–18 m, or a modular 16 m weighbridge that moves with the job; a public weighbridge on NH-48 60–100 MT on 16–18 m (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.
Grower-wise slips and salt-air protection for Dahanu's coastal trades.
- Grower-wise chikoo slipsEvery tempo weighed and printed in seconds during the harvest rush, with SMFW records per grower.
- Built for sea air and monsoonConcrete (RCC) or painted steel with IP68 load cells, raised so rainwater runs away.
- Modular for project sitesNo foundation required: installs within hours on a hard, level surface, and moves when the work moves.
Who needs one in Dahanu: Chikoo orchards, chikoo packing and chikoo processing (chips, pulp, powder); coconut, rice and vegetable trade; fish landings, fish traders and ice plants at Dahanu and Dhakti Dahanu; contractors serving the Dahanu thermal power station, including fly-ash buyers; the Vadhavan port project and its stone, sand and steel suppliers; highway transport and public dharam kanta operators along NH-48 at Charoti.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Gholvad, Bordi, Kosbad, Chinchani, Vangaon, Kasa, Talasari.
Chikoo packers, fish traders and contractors across Dahanu and Talasari.
Chikoo packers and traders
In the harvest months tempos queue at the packing sheds, and every grower is paid on the weight of their crates.
Our setup: A 30–40 MT, 9–12 m pit-less weighbridge with fast printed slips and SMFW grower-wise records for the season.
Fish traders and ice plants
Fish and ice are weighed wet, and melt-water with salt in it finds every bolt and cable gland.
Our setup: A 40–60 MT, 12–16 m concrete (RCC) weighbridge with drain channels at the approaches, IP68 load cells and sealed junction boxes.
Port-project and power-station contractors
Stone, sand, steel and fly-ash move on tippers and bulkers, and the work site shifts as the project moves.
Our setup: A modular 80–100 MT, 16 m weighbridge: no foundation required, installs within hours on a hard, level surface such as concrete.
- Gholvad and Bordichikoo orchards, packing and chikoo processing
- Dahanu and Dhakti Dahanufish landings, fish traders and ice plants
- Vadhavanport project and its construction supply
- Tarapur MIDC, Boisarchemicals, bulk drugs, steel and textiles
Sea air, monsoon rain and harvest queues: sizing a Dahanu weighbridge.
Dahanu sets two challenges for a weighbridge: the sea air and the monsoon. Salt in the air attacks plain steel, junction boxes and cable glands, so near the fish landings and on the coastal belt choose a concrete (RCC) weighbridge or a well-painted steel one with IP68 load cells and sealed junction boxes. The Palghar monsoon is heavy, so a pit-less weighbridge, raised on pedestals with the approach graded away from it, is safer than a pit that can fill with water; if a pit-type is needed, plan the drain before the pit. The trade itself is mixed. Chikoo arrives in crates on tempos, pick-ups and small trucks in the harvest months, and packers pay growers by weight, so a 12 m weighbridge with fast, printed SMFW slips keeps the queue moving. Fish and ice are weighed wet: a concrete (RCC) platform with drain channels at both approaches lasts longest. Contractors for the power station and the Vadhavan port project run heavy tippers and trailers, and their sites move as the work moves: a modular weighbridge needs no foundation and installs within hours on a hard, level surface such as concrete.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Chikoo packer or fruit trader | Tempos, pick-ups, small trucks | 30–40 MT | 9–12 m | Pit-less steel, SMFW grower-wise slips |
| Fish trader or ice plant | Insulated trucks, tempos | 40–60 MT | 12–16 m | Concrete (RCC), IP68 load cells, sealed junction boxes |
| Fly-ash, stone or port-project contractor | Tippers, bulkers, trailers | 80–100 MT | 16 m | Modular (moves with the job) or heavy pit-less steel |
| Public weighbridge, NH-48 | Multi-axle trucks, trailers | 60–100 MT | 16–18 m | Pit-less steel or concrete (RCC), printed slip |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From the packing shed to a printed slip: six steps for a Dahanu weighbridge.
Six steps for your project in Dahanu. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in DahanuTell us the heaviest vehicle you weigh (here, typically tempos, pick-ups, small trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (chikoo packer or fruit trader): 30–40 MT, 9–12 m weighbridge, Pit-less steel, SMFW grower-wise slips. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Questions from Dahanu's orchards, fish landings and project sites.
Who supplies weighbridges in Dahanu?
Which weighbridge suits a chikoo packer or trader in Gholvad or Bordi?
Which weighbridge suits a fish trader or ice plant in Dahanu?
डहाणू में चीकू व्यापारी के लिए कौन सा धर्म कांटा उपयुक्त है?
What decides the cost of a weighbridge in Dahanu?
डहाणू के मछली व्यापार के लिए कौन सा धर्म कांटा उपयुक्त है?
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
