Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Dahanu · Maharashtra

Dahanu weighbridges for chikoo, fish and port projects.

Dahanu, on the coast of Palghar district, is known for its chikoo (sapota) orchards: the Dahanu Gholvad chikoo carries a GI tag, and the fruit leaves Gholvad, Bordi and Kosbad every day for markets in Mumbai, Gujarat and beyond. The taluka also has fish landings at Dahanu and Dhakti Dahanu, the Dahanu thermal power station, and the Vadhavan port project, now under development, with its construction supply. Because Dahanu taluka is a notified eco-sensitive area, its weighing work is mostly orchards, fish, power-station contractors, construction material and transport. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) across Dahanu and Talasari.

Quick answer

A Dahanu chikoo packer or trader usually needs a 40 MT, 12 m weighbridge for tempos and small trucks; a fish trader or ice plant 40–60 MT on 12–16 m in concrete (RCC) for wet, salty conditions; a fly-ash, stone or port-project contractor 80–100 MT on 16–18 m, or a modular 16 m weighbridge that moves with the job; a public weighbridge on NH-48 60–100 MT on 16–18 m (dharam kanta). Symphony builds it in Ahmedabad and dispatches it about 2 weeks after a commercially cleared order with PO.

Why Symphony in Dahanu

Grower-wise slips and salt-air protection for Dahanu's coastal trades.

  • Grower-wise chikoo slipsEvery tempo weighed and printed in seconds during the harvest rush, with SMFW records per grower.
  • Built for sea air and monsoonConcrete (RCC) or painted steel with IP68 load cells, raised so rainwater runs away.
  • Modular for project sitesNo foundation required: installs within hours on a hard, level surface, and moves when the work moves.

Who needs one in Dahanu: Chikoo orchards, chikoo packing and chikoo processing (chips, pulp, powder); coconut, rice and vegetable trade; fish landings, fish traders and ice plants at Dahanu and Dhakti Dahanu; contractors serving the Dahanu thermal power station, including fly-ash buyers; the Vadhavan port project and its stone, sand and steel suppliers; highway transport and public dharam kanta operators along NH-48 at Charoti.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Gholvad, Bordi, Kosbad, Chinchani, Vangaon, Kasa, Talasari.

Get a quotation

Who we build for in Dahanu

Chikoo packers, fish traders and contractors across Dahanu and Talasari.

Chikoo packers and traders

In the harvest months tempos queue at the packing sheds, and every grower is paid on the weight of their crates.

Our setup: A 30–40 MT, 9–12 m pit-less weighbridge with fast printed slips and SMFW grower-wise records for the season.

Fish traders and ice plants

Fish and ice are weighed wet, and melt-water with salt in it finds every bolt and cable gland.

Our setup: A 40–60 MT, 12–16 m concrete (RCC) weighbridge with drain channels at the approaches, IP68 load cells and sealed junction boxes.

Port-project and power-station contractors

Stone, sand, steel and fly-ash move on tippers and bulkers, and the work site shifts as the project moves.

Our setup: A modular 80–100 MT, 16 m weighbridge: no foundation required, installs within hours on a hard, level surface such as concrete.

Industrial areas we serve near Dahanu
  • Gholvad and Bordichikoo orchards, packing and chikoo processing
  • Dahanu and Dhakti Dahanufish landings, fish traders and ice plants
  • Vadhavanport project and its construction supply
  • Tarapur MIDC, Boisarchemicals, bulk drugs, steel and textiles
Advice for Dahanu sites

Sea air, monsoon rain and harvest queues: sizing a Dahanu weighbridge.

Dahanu sets two challenges for a weighbridge: the sea air and the monsoon. Salt in the air attacks plain steel, junction boxes and cable glands, so near the fish landings and on the coastal belt choose a concrete (RCC) weighbridge or a well-painted steel one with IP68 load cells and sealed junction boxes. The Palghar monsoon is heavy, so a pit-less weighbridge, raised on pedestals with the approach graded away from it, is safer than a pit that can fill with water; if a pit-type is needed, plan the drain before the pit. The trade itself is mixed. Chikoo arrives in crates on tempos, pick-ups and small trucks in the harvest months, and packers pay growers by weight, so a 12 m weighbridge with fast, printed SMFW slips keeps the queue moving. Fish and ice are weighed wet: a concrete (RCC) platform with drain channels at both approaches lasts longest. Contractors for the power station and the Vadhavan port project run heavy tippers and trailers, and their sites move as the work moves: a modular weighbridge needs no foundation and installs within hours on a hard, level surface such as concrete.

Recommended forVehiclesCapacityWeighbridgeType
Chikoo packer or fruit traderTempos, pick-ups, small trucks30–40 MT9–12 mPit-less steel, SMFW grower-wise slips
Fish trader or ice plantInsulated trucks, tempos40–60 MT12–16 mConcrete (RCC), IP68 load cells, sealed junction boxes
Fly-ash, stone or port-project contractorTippers, bulkers, trailers80–100 MT16 mModular (moves with the job) or heavy pit-less steel
Public weighbridge, NH-48Multi-axle trucks, trailers60–100 MT16–18 mPit-less steel or concrete (RCC), printed slip

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Dahanu

From the packing shed to a printed slip: six steps for a Dahanu weighbridge.

Six steps for your project in Dahanu. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in DahanuTell us the heaviest vehicle you weigh (here, typically tempos, pick-ups, small trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (chikoo packer or fruit trader): 30–40 MT, 9–12 m weighbridge, Pit-less steel, SMFW grower-wise slips. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Questions from Dahanu's orchards, fish landings and project sites.

Who supplies weighbridges in Dahanu?
Symphony Weighing Leader (S.M.F. Enterprise), a weighbridge manufacturer in Ahmedabad since 1998, supplies and installs weighbridges across Dahanu and Talasari talukas, including Gholvad, Bordi, Kosbad, Chinchani, Vangaon and Kasa, with Legal Metrology stamping support.
Which weighbridge suits a chikoo packer or trader in Gholvad or Bordi?
A 30–40 MT, 9–12 m pit-less weighbridge is enough for tempos and small trucks. Growers are paid on weight, so SMFW prints a slip for every vehicle and keeps grower-wise records for the season.
Which weighbridge suits a fish trader or ice plant in Dahanu?
A 40–60 MT, 12–16 m concrete (RCC) weighbridge with IP68 load cells and sealed junction boxes, because melt-water and salt air corrode plain steel. The RCC weighbridge carries a 25-year structural warranty (T&C).
डहाणू में चीकू व्यापारी के लिए कौन सा धर्म कांटा उपयुक्त है?
टेम्पो और छोटे ट्रकों के लिए 30–40 टन क्षमता और 9–12 मीटर लंबाई का पिट-लेस धर्म कांटा उपयुक्त है। हर वाहन की तौल पर्ची तुरंत छपती है और SMFW सॉफ़्टवेयर किसान-वार रिकॉर्ड पूरे सीज़न के लिए सुरक्षित रखता है।
What decides the cost of a weighbridge in Dahanu?
Capacity (30–40 MT for a chikoo packer, 40–60 MT for a fish trader or ice plant, 80–100 MT for a contractor or public weighbridge), length (9–18 m), the type (pit-less steel, concrete (RCC) for wet and salty yards, or modular for project sites), the foundation for monsoon drainage, and options such as SMFW and the unmanned system. Send your longest vehicle, the daily vehicle count in the season and photos of the plot; an engineer replies within one working day.
डहाणू के मछली व्यापार के लिए कौन सा धर्म कांटा उपयुक्त है?
गीले और खारे वातावरण में साधारण स्टील पर जंग लगती है, इसलिए 40–60 टन क्षमता और 12–16 मीटर लंबाई का कंक्रीट (RCC) धर्म कांटा, IP68 लोड सेल और सील्ड जंक्शन बॉक्स के साथ, उपयुक्त है। सिम्फनी 1998 से धर्म कांटे बनाता है और स्टैम्पिंग में सहायता प्रदान करता है। कॉल या व्हाट्सएप: +91 94092 42100।

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com