
Magdalla port weighbridge, built around the cargo.
Magdalla is a lighterage port on the southern bank of the Tapi, listed by the Gujarat Maritime Board. Symphony makes weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for cargo yards, stockists and transporters who handle port-side loads and want a weight record of their own.
For a yard moving bulk cargo by tippers and multi-axle trucks, a 60 to 80 MT weighbridge on 12 to 16 m is a reasonable starting example. Long trailers, bulkers and molasses tankers may need 16 to 18 m, depending on the longest vehicle. Choose capacity from the heaviest loaded vehicle and check the axle loads of any machinery carrier. Specify IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, with stamping support.
Dust, tides and tankers: plan for all three.
- Weigh both waysA gross and a tare for each trip show what actually moved.
- Keep the gap clearPacked dust under or beside the platform can disturb readings.
- Set height from waterThe wettest conditions on the plot decide levels and drainage.
Who needs one in Magdalla port: The Maritime Board's page for the port lists coal, rock phosphate and machinery as imports at its first jetty, with mill scale, soyabean and molasses as exports, and describes a second jetty used for bulk cement and clinker. Those goods behave very differently on a weighbridge: heaps that shed dust, dense mill scale, bagged or loose farm produce, liquid in tankers and single heavy machines.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.
Receiving, storing, loading: three cargo jobs.
Receiving cargo from a jetty
Repeated trips build a queue and small errors add up.
Our setup: Suggested: 80 MT on 16 m, gross and tare for every trip, and a report by transporter.
Storing for several owners
Each party wants its own stock movement on record.
Our setup: Suggested: enter party, vehicle number and challan reference in SMFW on every slip.
Loading liquid for export
Surge in the tank delays a steady reading.
Our setup: Suggested: 16–18 m platform to suit the longest tanker, level approach and a stop line painted before the exit end.
- Magdalla porta Gujarat Maritime Board lighterage port on the Tapi, with listed cargo that includes coal, rock phosphate, bulk cement, clinker and molasses
Draw the truck loop, then fix the height.
Plan the weighbridge around the cargo cycle, not around the empty plot. A stockyard fed from a jetty sees the same trucks return again and again, so the queue forms quickly and a slow slip costs trips. Draw the loop first: loaded vehicles enter, weigh, tip, and weigh again empty without crossing the incoming line. If both directions must share one weighbridge, mark a waiting bay on each side and decide who has priority. Dusty cargo needs a cleaning habit. Coal, phosphate, clinker and cement fines settle in the gap around the platform and under it, where packed material can carry part of the load and disturb the reading. Choose a layout that lets a person reach underneath, check zero before each shift and wash or sweep on a fixed day. Keep wash water draining away, because wet fines turn into paste. The Maritime Board's page for the port lists a wide tidal range, so ask for the ground level and the highest water your plot has seen before fixing the platform height. A raised pit-less weighbridge keeps load cells and the junction box higher; a pit-type layout should be considered only where drainage works in the wettest week. River and coastal air also attacks bare steel. Ask for a protective paint system, sealed cable glands and cable runs in conduit, and plan repainting before rust spreads. For a long machinery load, send the trailer drawing with axle spacing so that the length and the load on each axle group can be checked before the order, not on the day the consignment arrives.
| Recommended for | Vehicles | Capacity | Length | Note |
|---|---|---|---|---|
| Coal and mineral tippers | Rigid multi-axle trucks | 60–80 MT | 12–16 m | Open sides for dust removal |
| Cement and clinker movement | Bulkers and trailers | 80 MT | 16–18 m | Straight entry for long bulkers |
| Molasses and other liquids | Road tankers | 60–80 MT | 16–18 m | Stop gently and wait for the surge to settle |
| Mill scale dispatch | Dense loads on trucks | 60 MT | 12 m | Check axle loads, not just the total |
| Soyabean and farm cargo | Trucks with high bodies | 40–60 MT | 9–16 m | Match length to the longest truck |
| Machinery carriers | Multi-axle trailers | 80–100 MT | 18 m | Verify axle drawing before use |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From cargo list to verified weighing, in order.
Six steps for your project in Magdalla port. For foundation-based models, curing takes time, so the drawing comes first.
- 1 · Your traffic in Magdalla portTell us the heaviest vehicle you weigh (for example, rigid multi-axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (coal and mineral tippers): 60–80 MT, 12–16 m weighbridge; open sides for dust removal. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Tare, tankers and night shifts: port yards ask.
Why weigh at our own yard when cargo has already been surveyed?
Can a stored tare be used for returning tippers?
How does a tanker affect weighing?
Can the weighbridge run without an operator at night?
What should we send before asking for a drawing?
What warranty applies?
What affects the cost of a weighbridge for a port-side yard?
मगदल्ला पोर्ट के कार्गो यार्ड के लिए वेब्रिज चुनते समय किन बातों का ध्यान रखें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
