Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Pandesara GIDC · Gujarat

Pandesara GIDC weighbridge for wet process-house yards.

Pandesara GIDC is known for the dyeing and printing process houses of Surat, and GIDC counts it among its saturated estates. Symphony builds weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for mills, fuel and chemical suppliers, waste handlers and transporters who must weigh heavy inputs in wet, hard-working yards.

Quick answer

For fuel tippers and chemical tankers, a 60 MT weighbridge, 12 to 14 m long, is a common starting point; use 80 MT on 16 to 18 m for trailers. Where spray, spills and washing keep the yard wet, ask for a raised pit-less steel-cum-RCC platform, IP68/IP69K load cells, protected cable routes, proper earthing, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, and stamping support is provided.

Why Symphony in Pandesara GIDC

Fuel in, ash out, water everywhere: build for that.

  • Follow the waterPosition and drainage come before capacity in a wet yard.
  • Name your chemicalsProtective finish and cable sealing depend on what actually spills.
  • Mass is not qualityRecord moisture separately; the scale reports weight only.

Who needs one in Pandesara GIDC: In a process-house supply chain a vehicle weighbridge can be used for boiler fuel such as coal, lignite or biomass, bulk chemicals by tanker, salt, cloth consignments by truck, and ash or sludge leaving for disposal.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Pandesara GIDC

Lignite, tankers, mill waste: three heavy duties.

Lignite and biomass intake

Payment is large and wet material arrives in the rains.

Our setup: Suggested: 60 MT on 14 m with tare after tipping and moisture noted against the slip number.

Tanker receipts

The supplier's dip figure and the received weight need comparison.

Our setup: Suggested: 60 MT on 12 m with the invoice quantity compared with net weight.

Waste leaving the mill

Disposal charges follow each trip and records are checked later.

Our setup: Suggested: 60 MT on 12 m with party-wise monthly reports.

Industrial areas we serve near Pandesara GIDC
  • Pandesara GIDCtextile dyeing and printing process houses in an estate GIDC lists as saturated
Advice for Pandesara GIDC sites

Drainage, chemicals, earthing: settle these early.

A process-house yard is harder on weighing equipment than a dry godown. Water, steam condensate, salt, dye liquor and ash can reach the platform from the floor, from leaking vehicles and from routine washing. Begin the survey by watching where liquid goes. The weighbridge should stand on the high side of the yard, with approaches that slope away and a drain that cannot back up into the foundation. A pit holds whatever runs into it, so a pit-type design needs reliable pumping and access for inspection; a raised pit-less design is easier to see under and to dry. Tell the supplier which chemicals are handled, because paint system, sealing around cable entries and the choice of enclosure material depend on that answer. IP68/IP69K load cells resist water and dust ingress, yet ingress rating is not a promise against every chemical, so spills should be flushed away and mounting hardware inspected for corrosion. Run cables in conduit above the splash level, keep the junction box where it can be opened dry, and provide surge protection where motors and large drives share the supply. Fuel needs its own discipline. Record the supplier, vehicle number and challan reference for every load, take tare after tipping, and note visible wetness, since moisture changes what a tonne of lignite or biomass is worth; the weighbridge measures mass, and quality testing remains a separate job. Tankers should be fully on the platform and settled before the reading, as liquid keeps moving briefly after braking. Outgoing ash or sludge should be weighed with the same two-step method, and the slip filed with the transport papers your unit already keeps. Plan fabrication and civil work around boiler fuel deliveries so that supply is not interrupted, and finish Legal Metrology verification before the figures settle any payment.

Recommended forVehiclesCapacityLengthNote
Boiler fuel receivingCoal, lignite or biomass in tippers and trucks60 MT12–14 mNote moisture against each slip number
Chemical and acid supplyRoad tankers60 MT12–14 mLet liquid settle before reading
Long trailer deliveriesTractor-trailers with bulk inputs80 MT16–18 m18 m for a 40-ft trailer
Cloth consignmentsGoods trucks with bales40 MT9–10 mMatch with bale count
Ash and sludge removalTippers leaving the unit60 MT12 mWash-down drain beside platform
Tight yard with a firm floorModerate loads, no excavation wanted40 MT9 mModular, after a floor check; verify again after shifting

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Pandesara GIDC

Wet-yard survey to stamped weighbridge: step by step.

Six steps for your project in Pandesara GIDC. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in Pandesara GIDCTell us the heaviest vehicle you weigh (for example, coal, lignite or biomass in tippers and trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (boiler fuel receiving): 60 MT, 12–14 m weighbridge; note moisture against each slip number. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Spills, moisture, tankers: Pandesara answers.

Where does Pandesara stand in GIDC allotment?
The corporation lists Pandesara in its saturated annexure. Its stated rule is that new industry receives a plot or shed there by public auction only, and units adjoining a vacant property get preference.
Will chemicals damage the weighbridge?
Some can. Share the list, keep spills flushed, inspect hardware and ask for the protective measures suited to your yard. An ingress rating covers water and dust, not every chemical attack.
Pit-less or pit-type for a wet unit?
Pit-less is usually easier to drain, clean and inspect. A pit-type model saves ramp space but depends on a reliable drain or pump.
Can the weighbridge measure fuel moisture?
No. It measures vehicle weight. Test moisture separately and write the result or remark against the ticket.
Can a tanker be weighed while the liquid moves?
Bring it to a complete stop with all wheels on the platform, wait for the reading to hold, and then record it.
What warranty is offered?
Symphony gives a 1-year warranty on the weighbridge and, for steel-cum-RCC construction, a 25-year structural warranty on the RCC concrete under terms and conditions.
What affects the cost of a weighbridge for a Pandesara process house?
Capacity, length, platform material, protection for a wet yard, foundation type, cabin, cable route and software options. Send the yard photo and vehicle list on WhatsApp +91 63525 86656 or call +91 94092 42100.
पांडेसरा की डाइंग-प्रिंटिंग इकाई में वेब्रिज लगाते समय किन बातों का ध्यान रखें?
पानी की निकासी, रसायनों से बचाव, ऊँचाई पर केबल मार्ग, सही अर्थिंग और सबसे बड़े वाहन के अनुसार क्षमता व लंबाई तय करें। एस.एम.एफ. एंटरप्राइज़ 1998 से वेब्रिज बना रही है और स्टैम्पिंग में सहायता करती है। कॉल: +91 94092 42100, व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com