
Rafaleshwar GIDC weighbridges for a ceramic district.
Rafaleshwar is a GIDC estate in Morbi district, home to the Morbi ceramic tile cluster. Symphony builds weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) suited to manufacturers on the estate, and to packaging, material and transport businesses in a ceramic district. A unit here often buys by the tonne and sells by the box, the roll or the piece. Somewhere between those two measures sits the real material balance of the business, and the only fixed point in it is what the loaded and empty vehicle actually weighed at the gate. When resin, paper, minerals or fuel arrive on one set of trucks and finished goods leave on another, a weighbridge turns two sets of paperwork into figures that an owner can compare at the end of a day.
A Rafaleshwar converter or supplier receiving rigid trucks can plan a 60 MT weighbridge, 14 to 16 m long. Units handling bulk minerals or fuel on multi-axle trailers should look at 80 or 100 MT over 16 to 18 m. Choose a surface-mounted platform where rainwater or powder would collect in a pit, IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, with stamping support from Symphony.
Bought by the tonne, sold by the box: closing the material balance.
- Size for light, long loadsBulky packing stock needs length more than heavy capacity, so measure the wheelbase first.
- Keep powder out of the gapA free-moving platform is the base of every correct reading.
- Compare in with outTickets sorted by material show where tonnes go between purchase and dispatch.
Who needs one in Rafaleshwar GIDC: Weighbridges suit packaging material makers, plastic and paper converters, mineral and chemical powder suppliers, ceramic support units, fuel traders and goods transporters.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Morbi.
Packing, powder and haulage: three kinds of load, three plans.
Strapping, protector and carton makers
Raw stock is bought by weight while finished packing leaves by count.
Our setup: Suggested: 50 MT on 14 m with material-wise inward tickets.
Mineral and glaze material suppliers
Powder spills, moisture changes and buyers check the quantity on arrival.
Our setup: Suggested: 80 MT on 16 m, raised for easy cleaning.
Transporters serving tile dispatch
Drivers need proof of the load before the vehicle starts a long haul.
Our setup: Suggested: 80 MT on 16 m with a printed copy for the driver.
- Rafaleshwar GIDCGIDC industrial estate in Morbi district
- Morbiceramic tile cluster and its supplying trades
Dust, rain and long bodies: keeping readings dependable.
Begin with the material, because each one behaves differently on a platform. Reels and bundles of packing stock are light for their size, so the vehicle is long, the net weight is modest and a small error is a large share of the invoice. Fine mineral powder is the opposite: dense, quick to spill and ready to settle in every gap. Write down both kinds of traffic before choosing a length, and size the platform for the longest vehicle that appears every week. Powder is the first maintenance enemy. If it packs between the platform and the surround, the structure stops moving freely and readings drift without warning. Keep the gap open, brush it out on a fixed day, and leave room under a surface-mounted structure so that a worker can clear the base. Lay the apron with a gentle fall away from the weighbridge so that monsoon water does not stand around the load cells or the junction box. Route signal cable through conduit, keep it clear of power lines and give the system its own earth. Where welding is carried out on site, disconnect the load cell circuit first and never let welding current pass through the platform. At the cabin, agree how tare is taken. A stored tare saves minutes, yet bodies, spare wheels and leftover material change what an empty truck weighs; a fresh second weighment is safer for high-value loads. In SMFW, give every supplier and material one spelling, print the slip with vehicle number, date and time, and match inward totals with the stock register before payment is released. Units that run late shifts can discuss RFID tags, cameras and a boom barrier so that the record does not depend on who is awake at the window. Place the cabin where the operator can see both ends of the platform and confirm that all wheels are on it. A mirror or a camera helps when a long body hides the far axle. Fix a short daily routine as well: zero check before the gate opens, a walk around the gap, and a note of anything unusual. Re-verification with the Legal Metrology office should sit in the same calendar as machine servicing, so that the stamp never lapses during a busy dispatch month.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Packaging material maker | Long bodies, light and bulky loads | 40–50 MT | 14–16 m | check zero often and watch all axles |
| Plastic or paper converter | Reels and granules in, bundles out | 60 MT | 14 m | Inward and outward tickets by material |
| Mineral powder supplier | Dense bulk, dust around the gap | 80 MT | 16 m | Open base that can be brushed out |
| Fuel or bulk trader | Multi-axle trailers at changing hours | 100 MT | 18 m | Straight approach, remote display |
| Transport yard | Many parties sharing one gate | 60–80 MT | 16 m | Party-wise reports from SMFW |
| Compact plot | Little room for civil work | 40 MT | 10–12 m | Modular build on a hard level surface |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From load list to stamped platform: the order of work.
Six steps for your project in Rafaleshwar GIDC. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in Rafaleshwar GIDCTell us the heaviest vehicle you weigh (here, typically long bodies, light and bulky loads), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (packaging material maker): 40–50 MT, 14–16 m weighbridge, check zero often and watch all axles. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Asked by units at Rafaleshwar.
Which company can supply a weighbridge to a Rafaleshwar GIDC unit?
We handle fine powder. Pit or surface platform?
Can light packaging loads be weighed on a 60 MT platform?
How do we settle a difference with a supplier?
What is the delivery period?
What is covered by warranty?
How is the cost of a weighbridge worked out for our unit?
राफलेश्वर जीआईडीसी की इकाई वेब्रिज की सही लंबाई कैसे तय करे?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
