Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Rafaleshwar GIDC · Gujarat

Rafaleshwar GIDC weighbridges for a ceramic district.

Rafaleshwar is a GIDC estate in Morbi district, home to the Morbi ceramic tile cluster. Symphony builds weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) suited to manufacturers on the estate, and to packaging, material and transport businesses in a ceramic district. A unit here often buys by the tonne and sells by the box, the roll or the piece. Somewhere between those two measures sits the real material balance of the business, and the only fixed point in it is what the loaded and empty vehicle actually weighed at the gate. When resin, paper, minerals or fuel arrive on one set of trucks and finished goods leave on another, a weighbridge turns two sets of paperwork into figures that an owner can compare at the end of a day.

Quick answer

A Rafaleshwar converter or supplier receiving rigid trucks can plan a 60 MT weighbridge, 14 to 16 m long. Units handling bulk minerals or fuel on multi-axle trailers should look at 80 or 100 MT over 16 to 18 m. Choose a surface-mounted platform where rainwater or powder would collect in a pit, IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, with stamping support from Symphony.

Why Symphony in Rafaleshwar GIDC

Bought by the tonne, sold by the box: closing the material balance.

  • Size for light, long loadsBulky packing stock needs length more than heavy capacity, so measure the wheelbase first.
  • Keep powder out of the gapA free-moving platform is the base of every correct reading.
  • Compare in with outTickets sorted by material show where tonnes go between purchase and dispatch.

Who needs one in Rafaleshwar GIDC: Weighbridges suit packaging material makers, plastic and paper converters, mineral and chemical powder suppliers, ceramic support units, fuel traders and goods transporters.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Morbi.

Get a quotation

Who we build for in Rafaleshwar GIDC

Packing, powder and haulage: three kinds of load, three plans.

Strapping, protector and carton makers

Raw stock is bought by weight while finished packing leaves by count.

Our setup: Suggested: 50 MT on 14 m with material-wise inward tickets.

Mineral and glaze material suppliers

Powder spills, moisture changes and buyers check the quantity on arrival.

Our setup: Suggested: 80 MT on 16 m, raised for easy cleaning.

Transporters serving tile dispatch

Drivers need proof of the load before the vehicle starts a long haul.

Our setup: Suggested: 80 MT on 16 m with a printed copy for the driver.

Industrial areas we serve near Rafaleshwar GIDC
  • Rafaleshwar GIDCGIDC industrial estate in Morbi district
  • Morbiceramic tile cluster and its supplying trades
Advice for Rafaleshwar GIDC sites

Dust, rain and long bodies: keeping readings dependable.

Begin with the material, because each one behaves differently on a platform. Reels and bundles of packing stock are light for their size, so the vehicle is long, the net weight is modest and a small error is a large share of the invoice. Fine mineral powder is the opposite: dense, quick to spill and ready to settle in every gap. Write down both kinds of traffic before choosing a length, and size the platform for the longest vehicle that appears every week. Powder is the first maintenance enemy. If it packs between the platform and the surround, the structure stops moving freely and readings drift without warning. Keep the gap open, brush it out on a fixed day, and leave room under a surface-mounted structure so that a worker can clear the base. Lay the apron with a gentle fall away from the weighbridge so that monsoon water does not stand around the load cells or the junction box. Route signal cable through conduit, keep it clear of power lines and give the system its own earth. Where welding is carried out on site, disconnect the load cell circuit first and never let welding current pass through the platform. At the cabin, agree how tare is taken. A stored tare saves minutes, yet bodies, spare wheels and leftover material change what an empty truck weighs; a fresh second weighment is safer for high-value loads. In SMFW, give every supplier and material one spelling, print the slip with vehicle number, date and time, and match inward totals with the stock register before payment is released. Units that run late shifts can discuss RFID tags, cameras and a boom barrier so that the record does not depend on who is awake at the window. Place the cabin where the operator can see both ends of the platform and confirm that all wheels are on it. A mirror or a camera helps when a long body hides the far axle. Fix a short daily routine as well: zero check before the gate opens, a walk around the gap, and a note of anything unusual. Re-verification with the Legal Metrology office should sit in the same calendar as machine servicing, so that the stamp never lapses during a busy dispatch month.

Recommended forVehiclesCapacityWeighbridgeType
Packaging material makerLong bodies, light and bulky loads40–50 MT14–16 mcheck zero often and watch all axles
Plastic or paper converterReels and granules in, bundles out60 MT14 mInward and outward tickets by material
Mineral powder supplierDense bulk, dust around the gap80 MT16 mOpen base that can be brushed out
Fuel or bulk traderMulti-axle trailers at changing hours100 MT18 mStraight approach, remote display
Transport yardMany parties sharing one gate60–80 MT16 mParty-wise reports from SMFW
Compact plotLittle room for civil work40 MT10–12 mModular build on a hard level surface

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Rafaleshwar GIDC

From load list to stamped platform: the order of work.

Six steps for your project in Rafaleshwar GIDC. Most of the waiting is the foundation curing, so the drawing comes first.

  • 1 · Your traffic in Rafaleshwar GIDCTell us the heaviest vehicle you weigh (here, typically long bodies, light and bulky loads), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (packaging material maker): 40–50 MT, 14–16 m weighbridge, check zero often and watch all axles. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Asked by units at Rafaleshwar.

Which company can supply a weighbridge to a Rafaleshwar GIDC unit?
Symphony Weighing Leader, the brand of S.M.F. Enterprise in Ahmedabad, manufactures weighbridges under a manufacturer licence with Legal Metrology model approval. The supply covers the platform, load cells, indicator and SMFW software, and we support the stamping process.
We handle fine powder. Pit or surface platform?
A surface-mounted structure is usually easier to keep clean, because the underside stays reachable and water has somewhere to go. A pit saves ramp length but collects powder and rain unless it is drained and cleared with discipline.
Can light packaging loads be weighed on a 60 MT platform?
Yes, within the minimum capacity and scale interval marked on the verified instrument. For small consignments, check that interval against the value of the goods, and weigh parcels on a platform scale when the load is too small for the weighbridge.
How do we settle a difference with a supplier?
Compare date, vehicle number, gross, tare and net on both slips. Check whether tare was stored or freshly taken, whether the truck stood fully on the platform, and when each instrument was last verified.
What is the delivery period?
Dispatch is about 2 weeks from a commercially cleared order with PO. Prepare the foundation or hard surface, earthing and cabin power during that period.
What is covered by warranty?
There is a 1-year warranty on the weighbridge. For steel-cum-RCC construction, the RCC concrete also carries a 25-year structural warranty, subject to terms and conditions.
How is the cost of a weighbridge worked out for our unit?
It follows the length, capacity, type of platform, foundation work, indicator and any automation. Send the longest vehicle details and a photo of the site on WhatsApp +91 63525 86656, or call +91 94092 42100, for a written quotation.
राफलेश्वर जीआईडीसी की इकाई वेब्रिज की सही लंबाई कैसे तय करे?
हर सप्ताह आने वाले सबसे लंबे वाहन के पहले और अंतिम एक्सल की दूरी नापें, दोनों ओर पर्याप्त जगह जोड़ें और उसके अनुसार लंबाई चुनें। एस.एम.एफ. एंटरप्राइज़ वर्ष 1998 से वेब्रिज निर्माता है और सत्यापन प्रक्रिया में सहयोग देती है। संपर्क: +91 94092 42100; व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com