Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Steel weighbridge platform under fabrication in a workshop
Sheel GIDC · Gujarat

Sheel GIDC weighbridge, drawn into your plot plan.

The Gujarat Industrial Development Corporation lists Sheel, also written Shil, among its Junagadh district estates, and Shil village belongs to Mangrol taluka. New plot holders, processors, material dealers and transporters can come to Symphony for a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) designed into the plot from the start.

Quick answer

A new unit expecting two and three axle lorries can plan for 40 MT on 9 to 12 m. If suppliers will send multi-axle tippers or trailers, reserve room for 60 to 80 MT on 16 to 18 m even where the first season is modest, because a platform is far harder to lengthen than to size correctly. Ask for IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO, with stamping support.

Why Symphony in Sheel GIDC

Building a new unit? Reserve the weighing lane early.

  • Draw before buildingA reserved straight lane costs little on an empty plot.
  • Paint is protectionSalty or damp air calls for early touch-up and regular inspection.
  • Size for laterPlan capacity and length around the vehicles you expect to accept.

Who needs one in Sheel GIDC: A GIDC advertisement invited applications from 11 to 25 November 2024 for general, non-chemical industrial plots in a set of estates that included Shil; that window has closed, so check current availability with GIDC. Anyone building a new unit has an advantage that older yards lack: the gate, the compound wall, the stores and the weighbridge can be drawn together. A state highway passes through the village, so decide early where an incoming lorry will turn off and where it will wait, instead of discovering later that the only straight stretch is already built over.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Sheel GIDC

Commissioning, purchases, dispatch: three checkpoints.

Commissioning a new plant

Civil work and equipment supply can fall out of step.

Our setup: Suggested: fix the foundation drawing date and the delivery date in one schedule.

Checking raw material

Invoices may be accepted without a weight.

Our setup: Suggested: weigh every inward lorry and file the slip with the purchase bill.

Dispatching finished goods

Loading errors surface only at the buyer's gate.

Our setup: Suggested: compare net weight with the packing list before the vehicle leaves.

Industrial areas we serve near Sheel GIDC
  • Sheellisted by GIDC among Junagadh district estates; Shil village is in Mangrol taluka
Advice for Sheel GIDC sites

Plan the lane and coating before the compound wall.

Put the weighbridge on the site drawing before the first wall goes up. Where possible, reserve a straight run at each end as long as the longest lorry, a cabin position with a view of both ends, an earth pit and a duct route that no future shed will cover. Ask your civil contractor to wait for the foundation drawing and the soil test so that levels and anchor points are cast once. Where a plot is open to salt-laden coastal air, exposed steel suffers. Ask how the structure will be prepared and painted, inspect welds, edges and fixings before dispatch if you can, and budget for touching up scratches before rust spreads under the paint. A steel-cum-RCC weighbridge puts concrete on the wearing surface; a steel platform is quicker to commission and simpler to move. Compare both against your traffic and the length of your lease. Wet goods deserve thought if your unit handles them: drain water and melting ice away from the platform, avoid hosing the junction box and wipe the display housing after salty spray. Record the supplier, material, vehicle number, gross, tare, net and time on each slip, and take the empty weight on the same visit when bodies, crates or fuel levels change. Verification by the Legal Metrology office is needed before the weighbridge is used for trade, at each due date and after repairs or relocation.

Recommended forVehiclesCapacityLengthNote
New general manufacturing unitTwo and three axle lorries40 MT9–12 mDraw it with the compound plan
Processing unit receiptsSmall goods vehicles30 MT7.5–9 mDrain wet loads away
Cement, steel and block dealerMulti-axle lorries60 MT16 mApron strong enough for braking
Mineral or aggregate yardTippers60–80 MT16–18 mWearing surface and sweeping access
Long trailer visitorsArticulated vehicles80 MT18 mStraight entry and exit
Unit on leased landMixed trucks40 MT9 mModular type, simpler to shift

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Sheel GIDC

Layout sketch to verified weighbridge, in sequence.

Six steps for your project in Sheel GIDC. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in Sheel GIDCTell us the heaviest vehicle you weigh (for example, two and three axle lorries), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (new general manufacturing unit): 40 MT, 9–12 m weighbridge; draw it with the compound plan. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Timing, steel and salt air: plot holders ask.

When should a new Sheel unit order its weighbridge?
Raise it while the layout is being drawn. The foundation, duct and cabin are then built once, and supply can be timed with civil work.
Steel or steel-cum-RCC for a coastal plot?
Both are used. Weigh the coating care that steel needs against the curing time and fixed position of concrete.
Can the first order be small and extended afterwards?
Do not rely on later extension. Share expected vehicles now so that length and capacity are chosen with room to spare.
Is a slip required for goods coming into our own unit?
A recorded gross and tare for each inward load lets stores check supplier invoices against what arrived.
Can one person run the weighbridge and the gate?
The unmanned option uses RFID, cameras and a boom barrier to record vehicles with less manual entry.
Which warranty applies?
Symphony covers the weighbridge for one year; on steel-cum-RCC the RCC concrete also has a 25-year structural warranty under terms and conditions.
How is a Sheel GIDC weighbridge quotation prepared?
We need capacity, platform length, construction type, soil report, ramp or pit choice, cabin and software needs. WhatsApp your layout drawing to +91 63525 86656 or call +91 94092 42100.
शील जीआईडीसी में नई इकाई के लिए वेब्रिज की योजना कब बनाएँ?
नक्शा बनाते समय ही वेब्रिज का स्थान, सीधा प्रवेश मार्ग, केबिन और अर्थिंग तय करें, ताकि निर्माण एक ही बार में हो। सिम्फनी 1998 से कार्यरत है और स्टैम्पिंग में सहयोग देती है। कॉल: +91 94092 42100, व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com