
Charup GIDC weighbridges for new units, suppliers and contractors.
Charup GIDC is an industrial estate in the Saraswati taluka of Patan district, which GIDC offers in its allotment notices for non-chemical industrial plots. For a unit taking up a plot, the weighbridge can be placed on the layout before the gate is built. Symphony supplies weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for units that set up at Charup GIDC and for the suppliers, contractors and transporters who serve them. A unit often receives trucks of steel, cement, sand or packing material before its machinery is running. Settling those weights in writing from day one avoids early disputes, and the same platform later weighs dispatches. A new unit owner often asks three questions: how big a platform to buy, whether it can be moved, and who will keep the paperwork straight.
A new Charup unit usually does best with a 50 MT weighbridge over 14 m in pit-less steel: it takes a loaded truck or trailer and fits a small plot. Suppliers of aggregate and building material whose tippers run heavily loaded should consider 70–80 MT, with 17–18 m for tipping trailers. A unit still waiting for its building can start on a modular platform that installs within hours of delivery on a hard, level surface. Sealed IP68/IP69K cells suit dusty, open yards. Dispatch is about 2 weeks from a commercially cleared PO.
Taking up a plot at Charup: plan the weighbridge from day one.
- Placed on the planPlatform, lane and cabin are drawn with the plot before anything is built.
- Ready before the buildingA modular platform serves while the permanent factory is still going up.
- A slip from the first truckEvery delivery is recorded with party, material and net weight.
Who needs one in Charup GIDC: Weighbridges suit manufacturing and engineering units, building-material and aggregate suppliers, packaging and warehouse operators, contractors and transporters.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge. We also serve Patan.
New plots, material suppliers and contractors at Charup.
Units taking up plots
Material trucks can arrive before the machines, and each delivery needs a written weight.
Our setup: Suggested: 50 MT on 14 m, pit-less steel over a compacted slab.
Material suppliers
Sand and aggregate may leave the gate in heavy tippers and tipping trailers.
Our setup: Suggested: 70–80 MT on 17–18 m with sealed cells and a gap that can be flushed.
Temporary starts
The office and the gate are not ready, but the trucks are.
Our setup: Suggested: a modular platform on hard ground, no foundation work.
- Charup GIDC plotsnon-chemical industrial plots
- Patandistrict headquarters
Bare plots, soft ground and dust: siting a weighbridge on a new plot.
On a bare or newly filled plot, test the ground where the platform will sit, and have the slab cast on a compacted, well-drained base instead of loose fill; a platform that settles by a few millimetres will read wrongly on every truck. Plan the gate before the building: the vehicle should enter in a straight line, stop fully on the platform and leave without reversing, with room inside the boundary for the next truck to wait, so the estate road stays clear. If you begin with a temporary shed, pick a platform whose cabin and indicator can be relocated to the permanent office, bearing in mind that relocation needs re-levelling, recalibration and fresh verification. Bare ground means dust, so a closed junction box and sealed IP68/IP69K cells earn back their small extra cost, and a good coat of paint keeps the steel sound through the monsoon. Check that a loaded trailer can reach the platform in the rains. SMFW records vehicle, party, material, gross, tare and net, prints a slip and keeps a register that the accountant can export; WOS puts the day's tonnes on the owner's phone and is free with the weighbridge for a limited time. A UPS and good earthing shield the indicator, which protects it from supply dips. Because a buyer or a contractor will want a slip that stands up to questions, the platform should carry a valid Legal Metrology stamp, and we help with the formalities. Send a photo or a sketch of the plot, mark where the gate will be, and the engineers will reply with a platform, ramp and cabin plan. Decide early who will operate the weighbridge and where the clerk will sit: a cabin with a window onto the platform and the gate lets one person check the vehicle number, watch the axles and print the slip without leaving the chair. For concrete-heavy trades, ask drivers to rinse the wheels before the platform, because wet cement left in the gap is hard to chip out. Allow room for a second platform or a longer one later, by leaving a level strip beside the first slab, since a successful unit often outgrows its first trucks. Paint a clear stop line and a board reading WEIGH HERE, so hired drivers who have never visited the plot stop in the right place.
| Recommended for | Vehicles | Capacity | Weighbridge | Type |
|---|---|---|---|---|
| Unit taking up a plot | First deliveries before the machines run | 50 MT | 14 m | Pit-less steel on a compacted, drained slab |
| Aggregate and sand supplier | Heavy tippers and tipping trailers | 70–80 MT | 17–18 m | Heavy steel or RCC, IP68/IP69K cells, flushable gap |
| Building-contractor yard | Cement, steel and bricks bought by weight | 50 MT | 14 m | Raised steel with a roofed cabin |
| Packaging or warehouse operator | Mixed trucks and pickups | 30–40 MT | 9–12 m | Low steel platform on a level slab |
| Unit awaiting its building | Trucks arriving before the office | 50 MT | 14 m | Modular platform working within hours of delivery on hard, level ground |
| Gate with tagged carriers | Regular carriers after hours | 50–60 MT | 14–16 m | RFID reader, camera and boom barrier logged in SMFW |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From plot sketch to first slip: a Charup weighbridge in six steps.
Six steps for your project in Charup GIDC. Most of the waiting is the foundation curing, so the drawing comes first.
- 1 · Your traffic in Charup GIDCTell us the heaviest vehicle you weigh (here, typically first deliveries before the machines run), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (unit taking up a plot): 50 MT, 14 m weighbridge, Pit-less steel on a compacted, drained slab. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, SMFW stored tares set up (RFID, cameras and boom barrier where ordered), and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
What Charup unit owners and suppliers ask before ordering.
Who supplies weighbridges at Charup GIDC?
How big a weighbridge does a new unit need?
Can we weigh before the factory building exists?
What should we check on bare ground?
Can we see the day's tonnes on a phone?
Does the weighbridge need verification?
What should a first-time buyer at Charup ask before ordering?
What decides the cost of a weighbridge at Charup GIDC?
चारुप जीआईडीसी में नई इकाई के लिए वेब्रिज कैसे चुनें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.
