Dungra GIDC weighbridge, civil work done right.
Dungra GIDC is an industrial estate connected with Vapi in Valsad district. Symphony builds weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for units here, with particular attention to the civil work: levels, water, buried services and concrete that is allowed to gain strength.
A steel-cum-RCC weighbridge of 60 to 80 MT on 12 to 16 m is a sensible example for loaded multi-axle trucks; regular semi-trailers need 18 m, and light goods traffic may need only 30 to 40 MT on 7.5 to 9 m. Fix the finished level against the estate road and drain before casting anything. Use IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO; stamping support is provided.
Levels, drains, curing: settle them early.
- Survey the levelsRoad, drain and threshold heights decide ramps and drainage.
- Find buried servicesPipes, sumps and cables are located before any digging.
- Let concrete cureStrength is confirmed by test before heavy vehicles climb on.
Who needs one in Dungra GIDC: A news report of January 2026 (DeshGujarat) reported the launch of Rs 25 crore of estate works: concrete roads, storm water drains, underground sumps, water distribution lines, pumping machinery, street lights and RCC culverts. Any unit adding a weighbridge should design it around the road and drainage levels that actually exist at its gate.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.
New casting, new frontage, long loads: three jobs.
Casting a new foundation
Errors in level or plate position are hard to undo.
Our setup: Suggested: check shuttering, plates and conduits against the drawing on the day before the pour.
Matching a rebuilt frontage
Old ramps may no longer meet the road cleanly.
Our setup: Suggested: a level survey, then revised ramps or a raised pit-less weighbridge.
Dispatching by tankers or trailers
Long vehicles need room to straighten.
Our setup: Suggested: 80 MT on 18 m with a painted guide line along the approach.
- Dungra GIDCan estate connected with Vapi, reported in January 2026 to be receiving road, drain and water works
Survey, trial holes, concrete: in that order.
Civil work is where a weighbridge project gains or loses weeks. Begin with a level survey that records the crown of the road, the lip of the storm drain, the gate threshold and several points across the proposed position. After road or drain works, old levels in a unit's file may no longer be right. Water must run away from the foundation, never towards it, and the unit's own discharge should not be routed through the pit or under the platform. Before excavation, ask where water lines, sumps, cables and culverts pass the frontage, get the answer in writing where possible and open trial holes by hand. A foundation moved on paper costs little; a broken pipe stops everyone. Check the soil as well: filled or soft ground calls for an engineer's advice on foundation depth. Then schedule the concrete honestly. Reinforcement should be placed to the drawing with proper cover, shuttering checked for line and level, and bearing plates set accurately, because load cells cannot correct a pedestal that is out. Pour each member without long breaks, keep it wet for the curing period your engineer specifies and take cube samples so strength is a test result rather than a guess. Vehicles should not climb on before the engineer clears it. In the monsoon, plan pouring windows and cover fresh work. Leave conduits for load cell and display cables before the pour, with smooth bends and a drain point, so nobody chisels finished concrete later. When the platform is ready, calibration with test weights and Legal Metrology verification come before the first weighment used for trade.
| Recommended for | Vehicles | Capacity | Length | Note |
|---|---|---|---|---|
| Loaded multi-axle trucks | Three to five axle trucks | 60–80 MT | 12–16 m | Level the approach with the finished road |
| Semi-trailers and tankers | Long articulated loads | 80 MT | 18 m | Straight approach clear of the drain edge |
| Light goods traffic | Pickups and small trucks | 30–40 MT | 7.5–9 m | Keep ramp slope gentle |
| Low-lying frontage | Mixed trucks | 60 MT | 12 m | Raised pit-less layout with free drainage |
| Level, well-drained plot | Rigid trucks | 40–60 MT | 9–12 m | Pit-type possible with a drain outlet |
| No new foundation wanted | Moderate loads | 40 MT | 9 m | Modular, on a hard level concrete surface |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
Foundation to first trade weighment, the sequence.
Six steps for your project in Dungra GIDC. For foundation-based models, curing takes time, so the drawing comes first.
- 1 · Your traffic in Dungra GIDCTell us the heaviest vehicle you weigh (for example, three to five axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (loaded multi-axle trucks): 60–80 MT, 12–16 m weighbridge; level the approach with the finished road. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Curing, levels and ramps: Dungra asks.
Why check levels again after estate road works?
How soon can trucks use a new RCC weighbridge?
Is Dungra GIDC open for fresh allotment?
Can the foundation be built by our own contractor?
What if there is no space for ramps?
What does the warranty include?
What goes into the price of a weighbridge for a Dungra GIDC unit?
डूंगरा जीआईडीसी में वेब्रिज की नींव बनाने से पहले क्या देखें?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.