Dungra GIDC weighbridge, civil work done right.

Dungra GIDC is an industrial estate connected with Vapi in Valsad district. Symphony builds weighbridges, truck scales and dharam kanta (धर्म कांटा / tol kanta) for units here, with particular attention to the civil work: levels, water, buried services and concrete that is allowed to gain strength.

Quick answer

A steel-cum-RCC weighbridge of 60 to 80 MT on 12 to 16 m is a sensible example for loaded multi-axle trucks; regular semi-trailers need 18 m, and light goods traffic may need only 30 to 40 MT on 7.5 to 9 m. Fix the finished level against the estate road and drain before casting anything. Use IP68/IP69K load cells, a Class III indicator and SMFW software. Dispatch is about 2 weeks from a commercially cleared PO; stamping support is provided.

Why Symphony in Dungra GIDC

Levels, drains, curing: settle them early.

  • Survey the levelsRoad, drain and threshold heights decide ramps and drainage.
  • Find buried servicesPipes, sumps and cables are located before any digging.
  • Let concrete cureStrength is confirmed by test before heavy vehicles climb on.

Who needs one in Dungra GIDC: A news report of January 2026 (DeshGujarat) reported the launch of Rs 25 crore of estate works: concrete roads, storm water drains, underground sumps, water distribution lines, pumping machinery, street lights and RCC culverts. Any unit adding a weighbridge should design it around the road and drainage levels that actually exist at its gate.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Dungra GIDC

New casting, new frontage, long loads: three jobs.

Casting a new foundation

Errors in level or plate position are hard to undo.

Our setup: Suggested: check shuttering, plates and conduits against the drawing on the day before the pour.

Matching a rebuilt frontage

Old ramps may no longer meet the road cleanly.

Our setup: Suggested: a level survey, then revised ramps or a raised pit-less weighbridge.

Dispatching by tankers or trailers

Long vehicles need room to straighten.

Our setup: Suggested: 80 MT on 18 m with a painted guide line along the approach.

Industrial areas we serve near Dungra GIDC
  • Dungra GIDCan estate connected with Vapi, reported in January 2026 to be receiving road, drain and water works
Advice for Dungra GIDC sites

Survey, trial holes, concrete: in that order.

Civil work is where a weighbridge project gains or loses weeks. Begin with a level survey that records the crown of the road, the lip of the storm drain, the gate threshold and several points across the proposed position. After road or drain works, old levels in a unit's file may no longer be right. Water must run away from the foundation, never towards it, and the unit's own discharge should not be routed through the pit or under the platform. Before excavation, ask where water lines, sumps, cables and culverts pass the frontage, get the answer in writing where possible and open trial holes by hand. A foundation moved on paper costs little; a broken pipe stops everyone. Check the soil as well: filled or soft ground calls for an engineer's advice on foundation depth. Then schedule the concrete honestly. Reinforcement should be placed to the drawing with proper cover, shuttering checked for line and level, and bearing plates set accurately, because load cells cannot correct a pedestal that is out. Pour each member without long breaks, keep it wet for the curing period your engineer specifies and take cube samples so strength is a test result rather than a guess. Vehicles should not climb on before the engineer clears it. In the monsoon, plan pouring windows and cover fresh work. Leave conduits for load cell and display cables before the pour, with smooth bends and a drain point, so nobody chisels finished concrete later. When the platform is ready, calibration with test weights and Legal Metrology verification come before the first weighment used for trade.

Recommended forVehiclesCapacityLengthNote
Loaded multi-axle trucksThree to five axle trucks60–80 MT12–16 mLevel the approach with the finished road
Semi-trailers and tankersLong articulated loads80 MT18 mStraight approach clear of the drain edge
Light goods trafficPickups and small trucks30–40 MT7.5–9 mKeep ramp slope gentle
Low-lying frontageMixed trucks60 MT12 mRaised pit-less layout with free drainage
Level, well-drained plotRigid trucks40–60 MT9–12 mPit-type possible with a drain outlet
No new foundation wantedModerate loads40 MT9 mModular, on a hard level concrete surface

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Dungra GIDC

Foundation to first trade weighment, the sequence.

Six steps for your project in Dungra GIDC. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in Dungra GIDCTell us the heaviest vehicle you weigh (for example, three to five axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (loaded multi-axle trucks): 60–80 MT, 12–16 m weighbridge; level the approach with the finished road. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds it to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Curing, levels and ramps: Dungra asks.

Why check levels again after estate road works?
A raised road or a new drain changes where water goes and how steep the approach becomes. A fresh survey avoids a foundation that floods or a ramp that scrapes.
How soon can trucks use a new RCC weighbridge?
Only after the curing period set by your engineer and satisfactory strength results. Order the equipment early so civil work and delivery run together.
Is Dungra GIDC open for fresh allotment?
GIDC lists Dungra in its saturated annexure, where new industry obtains a plot or shed by public auction. Confirm with the estate office.
Can the foundation be built by our own contractor?
Yes, to the Symphony drawing. Share level readings and photographs before pouring so that plate positions and conduits can be checked.
What if there is no space for ramps?
Look at a pit-type layout, provided the pit can drain by gravity or has a dependable pump, or turn the weighbridge along the longer side.
What does the warranty include?
One year on the weighbridge from Symphony. On steel-cum-RCC builds the RCC concrete additionally carries a 25-year structural warranty, terms and conditions apply.
What goes into the price of a weighbridge for a Dungra GIDC unit?
Capacity, length, RCC or steel top, foundation type, ramps, soil correction, cabin, display and software. Send level readings and photos on WhatsApp +91 63525 86656 or call +91 94092 42100.
डूंगरा जीआईडीसी में वेब्रिज की नींव बनाने से पहले क्या देखें?
सड़क और नाली का लेवल, ज़मीन के नीचे के पाइप और केबल, मिट्टी की स्थिति तथा जल निकासी की जाँच करें और क्योरिंग का समय पहले से तय करें। एस.एम.एफ. एंटरप्राइज़ 1998 से वेब्रिज बना रही है और स्टैम्पिंग में सहायता करती है। कॉल: +91 94092 42100, व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com