Panandhro weighbridge, built around repeat tipper trips.
Panandhro, a village of Lakhpat taluka in Kutch with 2,122 households in the 2011 census, shares its name with a mine listed on the state mineral corporation's lignite page. Transporters, contractors and traders handling bulk loads there can ask Symphony for a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) that stands up to heavy tipper work.
Loaded tippers and multi-axle carriers generally need 60 to 80 MT on 16 to 18 m. A heavier steel-cum-RCC platform up to 100 MT suits long tractor-trailers with high gross weight. Smaller supply vehicles fit 40 MT on 9 m. Specify Class III accuracy, IP68/IP69K load cells and SMFW software. Equipment usually leaves our works about 2 weeks after a commercially cleared purchase order. Check current mine dispatch arrangements before fixing capacity.
Small errors per trip become large ones by month end.
- Weigh both waysEmpty and loaded on one record.
- Clear the finesA packed gap spoils readings.
- Roll on gentlyLevel approaches protect the cells.
Who needs one in Panandhro: Mineral haulage is repetitive: the same tippers return many times, and a small error on each trip grows into a large quantity by month end. Lignite also holds moisture, so its weight can shift between one gate and the next. A contractor therefore needs more than a display. Each ticket should tie vehicle, time, empty weight and loaded weight together, and the machine should be easy to clean when fines pile up around it.
Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.
Haulage, limits, stores: three weights to trust.
Settling tipper haulage
Trip counts alone hide short loads.
Our setup: Suggested: pay on net weight with vehicle number and time on each ticket.
Controlling gross weight
An overloaded tipper risks penalty and breakdown.
Our setup: Suggested: read gross at exit and send excess back before it reaches the road.
Receiving fuel and stores
Remote sites cannot easily dispute a short delivery later.
Our setup: Suggested: weigh inward trucks both ways while the supplier's driver is present.
- Panandhro mining areaa lignite mine of this name is listed on the state mineral development corporation's page
Dust under the platform is the first enemy.
Size from the real axle loads on the haul route, not from the tipper's brochure figure, and keep a margin for wet loads. Heavy haul traffic can brake hard and often, so approaches should be long, straight and level enough that a vehicle rolls on gently and stops without dragging the platform sideways. Fit sturdy guide rails and check the stoppers that limit platform movement. Fine black dust and spilled lumps collect below and between sections; if they pack tight, the platform no longer floats freely and readings drift. Choose a raised foundation where possible, leave clear access along both sides and set a daily sweep with a deeper clean each week. Check zero at the start of each shift. Where lignite or other combustible fines gather, keep the area clean and follow the site's fire rules for electrical work and welding; never weld on the platform without protecting the load cells. Dry heat, dust and unsteady supply call for a closed cabin, stabilised power with battery backup, earthing and surge protection. Confirm land permission with whoever controls the plot before civil work begins, especially close to a mine or public road. Where the weight settles a bill, have the weighbridge verified and stamped by Legal Metrology before use, renew by the due date and re-verify after repair or shifting.
| Recommended for | Vehicles | Capacity | Length | Note |
|---|---|---|---|---|
| Loaded tippers | Three and four axle tippers | 60 MT | 16 m | Zero check each shift |
| Long multi-axle haulage | Tractor-trailers | 80 MT | 18 m | Straight, level approaches |
| Heaviest gross loads | High-capacity trailers | 100 MT | 18 m | Steel-cum-RCC platform |
| Contractor stores | Small and rigid trucks | 40 MT | 9 m | Diesel and spares by ticket |
| Shifting work site | Rigid tippers | 40–60 MT | 9–12 m | Modular type, firm level base |
| Workshop spares | Trolleys and drums | Platform scale | Indoor size | Away from dust |
Starting points only. Send your heaviest truck and daily traffic and we confirm the size.
From axle loads to a verified record.
Six steps for your project in Panandhro. For foundation-based models, curing takes time, so the drawing comes first.
- 1 · Your traffic in PanandhroTell us the heaviest vehicle you weigh (for example, three and four axle tippers), the space at the gate and the daily count. An engineer replies within one working day.
- 2 · Size and quotationOur usual starting point (loaded tippers): 60 MT, 16 m weighbridge; zero check each shift. The quotation comes with the foundation drawing.
- 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
- 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
- 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
- 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
Tare, drift and shifting: contractors ask.
Should we store tare weights or weigh empty each time?
Why does the reading drift on dusty sites?
Can tippers pass without a clerk?
Can the weighbridge move when the work front moves?
Is battery backup necessary?
What does the warranty include?
What affects the cost of a weighbridge for Panandhro haulage work?
पानंध्रो में लिग्नाइट टिपर तौलने के लिए धर्म कांटा कैसा हो?
Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.
Tell us your site. We recommend the platform.
Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.