Rakholi weighbridge, planned from the road gate in.

Rakholi is listed as a census town of Dadra and Nagar Haveli, and official land notices name its main road and its bridge in road improvement work. If your gate in Rakholi sends or receives goods by truck, Symphony can plan a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) around the road frontage you really have.

Quick answer

For container trailers collecting finished goods, plan 60 to 80 MT on 18 m. Units served mainly by rigid trucks can look at 40 to 60 MT on 12 to 16 m, and a compact plot with small goods vehicles at 30 MT on 7.5 to 9 m. Write IP68/IP69K load cells into your enquiry, along with Class III accuracy and SMFW software for the records. Once your order and payment terms are cleared on a purchase order, expect the equipment to leave our works in about 2 weeks; ask us for help with stamping.

Why Symphony in Rakholi

A busy frontage leaves no room for guesswork.

  • Check the boundaryConfirm the road line before any foundation work.
  • Queue insideWaiting trucks stay off the carriageway.
  • Drain both endsApproaches and platform base must clear rainwater.

Who needs one in Rakholi: A roadside industrial or trading plot has one problem that an interior plot does not: every truck that waits is visible to the public road. A factory receiving raw material, a godown holding goods for others and a transport yard each need the same discipline at the entrance. The vehicle should leave the carriageway completely, stand straight on the platform and drive away without reversing towards moving traffic.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Rakholi

Intake, release, transport: three checks at one gate.

Booking raw material intake

Supplier invoices need an independent figure.

Our setup: Suggested: weigh loaded and empty, and print the net against the supplier name.

Releasing finished goods

A truck must not leave before the weight matches the paperwork.

Our setup: Suggested: challan number on the slip and the barrier or guard releasing after print.

Weighing for a transport yard

Overloaded departures bring penalties and delay.

Our setup: Suggested: check gross weight against the vehicle's registered limit before exit.

Industrial areas we serve near Rakholi
  • Rakholia 2011 census town of Dadra and Nagar Haveli, named in official notices on road works
Advice for Rakholi sites

Confirm the building line before pouring concrete.

Official notices matter to anyone building along this road. A Collector's notification of August 2021 sought land in Rakholi and Sayli for a four-lane road from Rakholi main road to Sayli Junction, and a notice of January 2026 concerns upgrading the stretch from Samarvarni up to Rakholi Bridge. Before fixing the position of a platform, cabin or guard wall on a frontage plot, check the current survey boundary and building line with the revenue and roads offices, because a foundation is costly to move. Then draw the gate. Leave a holding space inside the compound for at least one waiting truck, so that the queue never starts on the carriageway. Set the platform back far enough that a trailer can turn in, line up and only then climb on. Ramps need a gentle, even slope and their own space. Rain should run away from both approaches and from under the structure, with a drain that can be opened and cleared. Where the frontage is narrow, a platform placed along the compound wall can work if there is a service gap for cables and load cells. Route the signal cable in conduit, keep the junction box accessible and give the indicator a stable supply with backup, earthing and surge protection. Place the cabin where the operator sees the number plate at entry. If the slip settles money between buyer and seller, the Legal Metrology officer must check and seal the machine first, then again by the date printed on the certificate, and afresh whenever it is repaired or moved.

Recommended forVehiclesCapacityLengthNote
Finished goods in containers40-foot trailers60–80 MT18 mWhole vehicle on the platform
Raw material intakeMulti-axle rigid trucks60 MT16 mSupplier code on each ticket
Mid-size unitTwo and three axle40–50 MT12 mHolding space inside the gate
Compact frontage plotSmall goods vehicles30 MT7.5–9 mStraight entry from the gate
Rented godown yardShort rigid trucks40 MT9 mModular, on hard level concrete
Bags and cartons indoorsHandling trolleysPlatform scaleIndoor sizeNo truck foundation

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Rakholi

Survey sketch to stamped scale, stage by stage.

Six steps for your project in Rakholi. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in RakholiTell us the heaviest vehicle you weigh (for example, 40-foot trailers), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (finished goods in containers): 60–80 MT, 18 m weighbridge; whole vehicle on the platform. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the concrete pedestals to our drawing; we can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Frontage, lanes and slips: gate managers ask.

Where should the platform go on a roadside plot?
Inside the confirmed boundary, set back so a truck can line up straight, with room to wait and to leave. Share a measured sketch for a layout check.
Can one weighbridge handle both entry and exit?
Yes. The usual method is to weigh on the way in and again on the way out, with the lane planned so the two movements do not block each other.
What if our frontage is shorter than the trailer?
Turn the platform along the plot if the turning path allows it. A platform shorter than the vehicle is not a solution, because every wheel must rest on it.
Is an unattended gate possible?
Yes, where the same tagged trucks return daily along one marked lane: choose the unmanned package of tag readers, camera views and a barrier arm.
Can slips carry challan and container numbers?
Tell us the fields you need; the slip format in SMFW is confirmed with the quotation.
What warranty is given?
Equipment cover runs for one year. Choosing steel-cum-RCC adds 25 years of structural cover for its concrete portion, with conditions we set out in writing.
What does a weighbridge for a Rakholi unit cost?
Platform length, tonnage, frontage drainage, ramp earthwork, the operator's room and any gate automation move the figure. A photo of your entrance helps: share it by WhatsApp at +91 63525 86656, or ring +91 94092 42100.
राखोली में सड़क किनारे के प्लॉट पर वेब्रिज कैसे स्थापित करें?
पहले राजस्व और सड़क विभाग से सीमा तथा निर्माण रेखा की पुष्टि करें, फिर गेट के भीतर प्रतीक्षा स्थान, सीधा प्रवेश और जल निकासी तय करें। वर्ष 1998 से स्थापित सिम्फनी आपको स्टैम्पिंग की तैयारी में मार्गदर्शन देती है। संपर्क हेतु फोन +91 94092 42100 अथवा व्हाट्सएप +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com