Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Newly concreted weighbridge platform during installation
Sayli · Dadra and Nagar Haveli and Daman and Diu

Sayli weighbridge, one record across all shifts.

Sayli, written Saily in census records, was listed in the 2011 census as a large village of Dadra and Nagar Haveli, with 3,801 households and 9,206 workers, of whom 800 were cultivators. For plant, stores and transport managers there, Symphony supplies a weighbridge, truck scale or dharam kanta (धर्म कांटा / tol kanta) that keeps one honest record across every shift.

Quick answer

Most factory gates receiving multi-axle trucks need 50 to 60 MT on 12 to 16 m. Add length to reach 18 m where long trailers load, and move to 80 MT only if the heaviest gross weight calls for it. A small works with light commercial vehicles may manage with 30 MT. Choose IP68/IP69K load cells, a Class III indicator and SMFW software with separate operator entries. After a commercially cleared PO, dispatch is about 2 weeks, with stamping support.

Why Symphony in Sayli

Many hands at the gate, so the record must be clear.

  • Separate the walkersPeople and loaded trucks should not share the platform.
  • Hand over cleanlyOpen weighments pass to the next operator on record.
  • Light the edgesDrivers need to see the platform at night.

Who needs one in Sayli: In a village with a large working population, plan how the weighing point will be shared. Where gates open early and close late, two or three operators may use one cabin, and people on foot or on two-wheelers may pass the same entrance as loaded trucks. Whatever a unit makes or stores, its weighing record has to show who weighed, when and for which party, and the platform has to stay clear of people while a reading is taken.

Also called a dharam kanta (धर्म कांटा), truck scale or weigh bridge.

Get a quotation

Who we build for in Sayli

Inward, job work, scrap: write each weight down.

Counting inward material by shift

Arrivals at odd hours go unrecorded.

Our setup: Suggested: serial-numbered slips with date, time and operator.

Dispatching job-work goods

The principal and the job worker must agree on weight.

Our setup: Suggested: two copies of each slip and a party-wise statement.

Removing scrap and offcuts

Low-value loads invite casual estimates.

Our setup: Suggested: weigh every scrap vehicle in and out like any other sale.

Industrial areas we serve near Sayli
  • Saylia Dadra and Nagar Haveli village with a large working population in the 2011 census
Advice for Sayli sites

Plan for people before planning the platform.

Start with people, not steel. Give walkers and riders their own gate or a railed path, paint a stop line before the platform and keep the weighing area out of any assembly point used at shift change. A remote display facing the driver lets the cab confirm the figure without anyone walking over. Inside the cabin, create a separate login or name for each operator and close the day's entries at handover, so that an unfinished first weighment is visible to the next person instead of being forgotten. Decide who may cancel or correct a slip and keep the original on record. Night working needs shielded lighting that shows the platform edges and number plates without glaring into mirrors. Mechanically, specify guide rails or kerbs that protect the structure from a careless turn, and keep them clear of the moving platform. Plot layouts differ, so choose pit-less construction with ramps where the ground holds water or inspection must be easy, and a pit-type design, with a proper drain, where length for ramps is short. Both need a soil check and foundation drawing. A Collector's notification of August 2021 sought land in Rakholi and Sayli for a four-lane road from Rakholi main road to Sayli Junction, so plots on that road should check the current boundary before civil work. Protect electronics with earthing, surge devices and backup power. Verification by Legal Metrology is required before commercial use and on every due date, and again after repair or relocation.

Recommended forVehiclesCapacityLengthNote
Two-shift factory gateMulti-axle trucks60 MT16 mOperator name on each record
Round-the-clock dispatchLong trailers60–80 MT18 mNight lighting and remote display
Single-shift worksTwo and three axle40–50 MT12 mStop line before the platform
Small manufacturing shedLight commercial30 MT7.5–9 mSeparate walking path
Contract storage bayMixed fleet50 MT12 mParty-wise reports
Temporary project storeShort rigid trucks40 MT9 mModular unit on level concrete

Starting points only. Send your heaviest truck and daily traffic and we confirm the size.

Your project in Sayli

Gate study to first shift, in order.

Six steps for your project in Sayli. For foundation-based models, curing takes time, so the drawing comes first.

  • 1 · Your traffic in SayliTell us the heaviest vehicle you weigh (for example, multi-axle trucks), the space at the gate and the daily count. An engineer replies within one working day.
  • 2 · Size and quotationOur usual starting point (two-shift factory gate): 60 MT, 16 m weighbridge; operator name on each record. The quotation comes with the foundation drawing.
  • 3 · Foundation on siteYour civil contractor builds the foundation to our drawing; a pit-type weighbridge needs a drained pit with a sump. We can check the levels before the weighbridge arrives.
  • 4 · Fabrication and dispatchBuilt and tested in our Ahmedabad workshop; dispatch in about 2 weeks from a commercially cleared order with PO, then delivered and placed on your foundation.
  • 5 · Installation and calibrationWeighbridge placed, load cells and indicator connected and calibrated, slip printing set up, and Legal Metrology verification supported.
  • 6 · AMC and serviceAMC, breakdown visits, calibration and annual re-verification support from our technical desk, so the weighbridge stays accurate for years.
FAQ

Operators, drivers and rain: plant teams ask.

How do several operators share one system?
Give each person their own entry name and a written handover rule. Reports can then be read shift by shift.
What happens to a truck weighed empty in one shift and loaded in the next?
The first weight stays stored against the vehicle until the second is taken. The handover list should show such pending vehicles.
Can the driver see the reading from the cab?
Yes, with a remote display placed along the lane.
Do we need cameras?
Not for ordinary trade weighing. Where proof of the vehicle on the platform is wanted, the unmanned option offers cameras with RFID and a boom barrier.
How often should the platform be cleaned?
Check the gaps at the start of each shift and after heavy rain, and confirm zero on an empty platform.
Who arranges stamping?
The owner applies to Legal Metrology; Symphony supports the preparation and the visit.
Which details help us quote for a Sayli plant?
Longest vehicle, heaviest gross weight, shifts per day, plot sketch, soil note and the reports you need. WhatsApp +91 63525 86656 or call +91 94092 42100.
सायली की फैक्ट्री में शिफ्ट के अनुसार वेब्रिज रिकॉर्ड कैसे रखें?
प्रत्येक ऑपरेटर का नाम अलग रखें, अधूरी तौल की सूची अगली शिफ्ट को सौंपें और पर्ची निरस्त करने का अधिकार तय करें। सिम्फनी 1998 से कार्यरत वेब्रिज निर्माता है तथा स्टैम्पिंग में सहयोग देती है। कॉल: +91 94092 42100, व्हाट्सएप: +91 63525 86656।

Limited-time offer: our weighbridge phone app (SMFW WOS) is free with your weighbridge. See what the app shows.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com