Sales +91 94092 42100/Technical +91 97251 68834
Symphony Weighing Leader
Diagram of a concrete weighbridge at a salt works: concrete top, sealed load cells, sealed junction box, cable in conduit, drain slope and earthing
Buyer's guide

Weighbridges for salt works and coastal sites.

How to choose a weighbridge (dharam kanta) for salt pans, ports and coastal plants: concrete vs steel, sealed load cells, drainage, earthing and upkeep.

Quick answer

For a salt works, port or coastal plant, choose a concrete (RCC) or steel-cum-RCC weighbridge, sealed IP68 / IP69K load cells, drainage away from the weighbridge and proper earthing. Symphony builds RCC and steel-cum-RCC weighbridges from 10 to 100 MT and supplied three 100 MT steel-cum-RCC weighbridges to Sambhar Salts.

Short answer: at a salt works, port or coastal plant, choose a concrete (RCC) weighbridge or steel-cum-RCC for heavy duty, fit sealed IP68 / IP69K load cells, keep water and brine draining away from the weighbridge, and earth it properly. The weighing parts are the same as anywhere else; what changes is how well the weighbridge is protected from salt, water and corrosion. Symphony builds RCC and steel-cum-RCC weighbridges from 10 to 100 MT.

Why salt and sea air are hard on a weighbridge

Salt is not only on the trucks. At a salt pan, wet salt falls from every tipper, brine runs off the load and the soil itself is saline. Near the sea, the air carries chloride that settles on every steel surface and every cable gland. Three things follow:

  • Exposed steel rusts fastPaint chips under wheels and loading, and salt works into the gap. A painted steel platform needs regular touch-up to keep its strength.
  • Water finds the electronicsA junction box that is not sealed, a cable gland left loose or a cable lying in a wet trench is the usual start of drifting readings.
  • Concrete needs the right mixChlorides that reach the steel bars inside poor concrete make them rust and crack the concrete from inside. Mix, cover and curing decide how long it lasts.

Gujarat produced about 85% of India’s salt in 2021-22 (227.64 of 266 lakh tonnes; Indian Bureau of Mines, Indian Minerals Yearbook 2022, Salt chapter), so the coast from Kutch to Bhavnagar is where these questions come up most often.

Concrete, steel-cum-RCC or steel: which one?

TypeHow it handles saltBest for
Concrete (RCC)Concrete top, no paint to fail; 25-year structural warranty on the RCC concrete (T&C apply)Salt pans, washeries, refineries, fertiliser and chemical plants
Steel-cum-RCCSteel structure filled with concrete; heavy duty with less exposed steelHigh-traffic salt works and bulk yards, up to 100 MT
SteelStrong and quick to install, but needs a good paint system and regular repaintingPort yards and coastal sites away from direct brine, or where the weighbridge may be moved (portable / modular)

Symphony supplied three 100 MT steel-cum-RCC weighbridges (16 × 3 m) to Sambhar Salts in Rajasthan. Our steel vs concrete guide compares the two in more detail, and the concrete weighbridge page lists sizes from 10 to 100 MT and 7 to 18 m.

Load cells, junction box and cables

Most breakdowns at coastal sites begin with water in the electronics, not with the steel. Ask for these points in the quotation:

  • IP68 / IP69K load cellsSealed cells that are made to stay dry under water and high-pressure washing. Symphony uses IP68 / IP69K load cells.
  • Sealed junction boxPlaced above the water line, with every cable gland tightened and the lid gasket checked at each service.
  • Cables in conduitRun in conduit or a covered duct to the weigh cabin, never loose in a wet trench where trucks and tools can damage them.
  • Earthing and surge protectionA tested earth pit and surge protection. Coastal areas see heavy monsoon storms, and lightning is a common cause of indicator damage.

Ask the supplier to show the junction box position and conduit route on the foundation drawing. For the full list of causes, see why load cells fail.

Foundation and drainage at the coast

IS 456:2000 (Tables 3, 5 and 16), the Indian code for plain and reinforced concrete, sets these minimums for reinforced concrete. Your civil engineer confirms which class applies to your plot.

Exposure (IS 456)Min. gradeMax. water-cement ratioNominal cover
Severe: coastal environmentM300.4545 mm
Very severe: sea-water sprayM350.4550 mm
Extreme: tidal zoneM400.4075 mm
  • Choose pit-less where possibleA pit holds rain and brine. A pit-less weighbridge on raised pedestals stays drier and is easier to wash.
  • Slope the ground awayApproaches and the area around the pedestals should drain away from the weighbridge, not towards it.
  • Cure the concrete fullyGood curing closes the surface and slows chloride getting in. Rushing the weighbridge onto green concrete shortens its life.
  • Get the drawing firstSymphony gives free civil consultation and a foundation drawing for your size. The foundation guide explains each step.

Upkeep that pays back

A short routine keeps a coastal weighbridge accurate and cuts repair calls:

How oftenWhat to do
Daily or each shiftClear salt, mud and stones from the gaps between the platform and the foundation
Weekly in the salt seasonWash the platform and the pedestal area with fresh water
MonthlyCheck the junction box seal, cable glands and conduit; look for rust spots on any exposed steel
Before the monsoonTest the earthing, clear the drains and check the surge protection
Every 12 monthsCalibration check and Legal Metrology re-verification of the weighbridge

Symphony offers annual maintenance contracts (AMC) and Legal Metrology re-verification support. The maintenance checklist lists what your own team can do between visits.

Size for the salt season

Salt is harvested in a dry-season peak, when tippers and trailers shuttle between pans, washeries and the refinery or port. Size the weighbridge for the heaviest loaded vehicle in that peak, with headroom: for salt tippers and trailers this usually means 60 to 100 MT on a 16 or 18 m platform, so the longest trailer stands fully on it. 60, 80 or 100 ton explains the choice, and our free weighbridge tools show what a small weighing error costs in a year and when your re-verification is due.

Salt and coastal areas we serve

Symphony builds in Ahmedabad and installs, calibrates and supports stamping on site. See our pages for Gandhidham, Mundra, Jamnagar, Porbandar, Bhavnagar, Dahej and Rajasthan (Sambhar), or ask for a quotation for your site.

हिंदी में: नमक उद्योग एवं तटीय संयंत्रों के लिए कंक्रीट (RCC) अथवा स्टील-कम-RCC वेब्रिज (धर्म कांटा), सीलबंद IP68 / IP69K लोड सेल, समुचित जल निकासी तथा मानक अर्थिंग सर्वाधिक उपयुक्त हैं।

ગુજરાતીમાં: મીઠાના અગર અને દરિયાકાંઠાના પ્લાન્ટ માટે કોંક્રિટ (RCC) અથવા સ્ટીલ-કમ-RCC વેબ્રિજ (વજન કાંટો), સીલબંધ IP68 / IP69K લોડ સેલ, પાણીનો યોગ્ય નિકાલ અને પ્રમાણભૂત અર્થિંગ શ્રેષ્ઠ વિકલ્પ છે.

FAQ

Questions, answered.

Which weighbridge is best for a salt works?
A concrete (RCC) weighbridge, or steel-cum-RCC for heavy duty, is usually the best choice. The concrete top does not rust or need repainting, which matters where brine, wet salt and saline soil attack exposed steel. Symphony gives a 25-year structural warranty on the RCC concrete (T&C apply).
Can I use a steel weighbridge near the sea?
Yes, but plan for it. Ask which surface protection and paint system is specified, wash salt off the platform with fresh water, and budget for regular touch-up painting. Where salt is carried on the trucks every day, concrete normally costs less to keep.
Which load cells suit a coastal or salt site?
Sealed load cells rated IP68 / IP69K, with sealed cable glands, a sealed junction box and cables run in conduit. Symphony uses IP68 / IP69K load cells on its weighbridges.
Is a pit-type weighbridge a good idea at a salt pan?
Usually not. Rain and brine collect in a pit and keep the load cells and steel wet. A pit-less weighbridge on raised pedestals, with the ground sloping away from it, stays drier and is easier to clean.
Does the foundation need special concrete at the coast?
Often, yes. IS 456:2000 places a coastal environment in the severe class and sea-water spray in the very severe class, which calls for a higher concrete grade, a lower water-cement ratio and more cover to the steel bars. Your civil engineer confirms the class for your site; Symphony gives free civil consultation and a foundation drawing.
Has Symphony supplied weighbridges to the salt industry?
Yes. Symphony supplied three 100 MT steel-cum-RCC weighbridges (16 × 3 m) to Sambhar Salts in Rajasthan, and has installed weighbridges at Dahej on the Gujarat coast.

Tell us your site. We recommend the platform.

Send a site photo, vehicle size and daily vehicle count. An engineer replies within one working day.

Request the document

Fill in your details once; after a quick e-mail verification the download starts and all other documents unlock.

Include the country code, e.g. +91 or +254.
Security characters

An engineer replies within one working day. We verify your e-mail with a one-time code. By sending, you agree to our privacy notice.

Verify us · credentials you can check

Check the papers before you buy.

Quality systemISO 9001:2015
Cert. No.
3050250909104Q
Issued by
QRO Certification LLP
Valid to
8 Sep 2028
Check at qrocert.org
CE certificate of complianceCE-7070
Directive
2014/32/EU
Issued by
UK Certification & Inspection Ltd
Valid to
8 Sep 2028
Check at ukcertifications.org.uk
Legal MetrologyModel approval & manufacturer licence

Symphony holds a Legal Metrology model approval certificate and a manufacturer licence. Copies are shared with your quotation or tender documents.

How stamping works
Business registrationS.M.F. Enterprise
GSTIN
24AJNPK8047K1ZR
MSME
UDYAM-GJ-01-0025143
Since
1998
Tender documents

Ask for any certificate copy with your quotation: info@symphonyweight.com